Nook Architects

Executive Project
Meadurements
Executive Project Nook Architects Measurements
www.nookarchitects.com
CHAPTER 1
DEMOLITIONS AND PRIOR WORK Quantity Partial TOTAL
Carrying out the overall project includes maintenance and cleaning of the communal stairwell at
the items
All end ofinclude
each day.
the transport of demolished material to an authorized disposal site.

DEMOLITIONS

1.1. m2. Demolition of Partitions


Demolition of 5 cm thick ceramic walls plastered on both sides according to the plan. Includes
bathroom and kitchen partitions that may be tiled on one side. 87,90 - €

1.2. m2. Removal of Tile


Removal of the tile from the vertical perimeters of the bathroom, only from the walls that won’t
be demolished. Includes resurfacing and cleaning the wall after. 36,00 - €

1.3. pa. Removal of Bathroom Fixtures


Removal of current bathroom fixtures, consisting of two toilets, two sinks, one tub, and one 1,00 - €
shower.
1.4. pa. Removal of Exterior Carpentry
Removal of existing balcony boxes in the interior gallery facade and from the current bathroom
window, including the removal of frames, jambs, and covers. 1,00 - €

1.5. pa. Removal of Interior Carpentry


Removal of interior carpentry, doors, frames, jambs, and covers according to the plan. 1,00 - €

1.6. m2. Removal of Current Flooring


Removal of tile flooring in the gallery and bathroom for the subsequent installation of an ironing 12,15 - €
board.
1.7. m2. Removal of Hydraulic Flooring
Removal of existing hydraulic flooring in the whole living space. This includes removing the
lower layers of mortar and filler sand to make the leveling and reinforcement plank. 102,85 - €

1.8. m2. Removal of False Ceiling


Removal of false reed and plaster ceiling in the entire living space to check the state of the
wooden beams. This includes the removal of the wooden slats to fasten the false ceiling if 115,00 - €
necessary.
1.9. pa. Removal of Fixtures
Removal of all fixtures until only the basic electrical wiring is left. Includes removal of the 1,00 - €
existing water
-Removal heater. fixtures
of electrical
-Removal of plumbing fixtures
-Removal of bathroom fixtures

PRIOR WORK AND PROJECTS

1.10. m2. Plank Formation


Formation of the reinforcement and leveling plank in the entire living space with cement and
resin-anchored mesh on the walls, load-bearing walls, and beams. 115,00 - €

1.11. ud. Support Beam in H2


Acquiring and replacing the metal lintel in room H2 to make it bigger. This includes removing the
demolished wall and recovering it with mortar, finishing it with plaster, or double drywall boxing. 1,00 - €

1.12. ud. Reinforcement by Removing Partitions


Acquiring and making substitute reinforcements for demolished partitions according to the
project manager's plans and indications. 1,00 - €

ENTIRE PROPOSAL - €
Executive Project Nook Architects Measurements
www.nookarchitects.com
CHAPTER 2
MASONRY Quantity Partial TOTAL

2.1. m2. Dividing Walls


Formation of dividing walls made of double plates of drywall on each side, according to
the plan. Total wall thickness 10-11 cm. 81,00 - €

2.2. m2. Construction Machinery


Formation of a 13 cm thick ceramic wall for coating, setting it with mortar cement. This
includes setting the mortar in good view to be refinished or with a regulated plaster
finish, according to the plan. Total partition thickness 15 cm. 6,00 - €

2.3. m2. Formation of Soundproofed Recessed Walls


Formation of recessed walls with plasterboard with standard lamination, fixed
mechanically to the vertical wall using galvanized steel sheet profiling samples,
thermoacoustic insulation. 50,00 - €

2.4. pa. Formation of a Drawer to Hide Built-in Faucets


Construction of a 4 cm thick ceramic-lined box, set with cement mortar and measured
according to the plans, to hide the built-in faucets. See 3D and detail plan. 4,00 - €

2.5. m2. Formation of False Ceiling


Formation of false ceiling with standard laminated plasterboard fixed mechanically to the
ceiling using galvanized steel sheet profiling samples. 55,00 - €

2.6. ud. False Ceiling Door


Making the door in the false ceiling made of water-repellent standard laminated
plasterboard for an air conditioning unit. Includes hidden perimeter profiles and a clip
opening system. 2,00 - €

ENTIRE PROPOSAL - €
Executive Project Nook Architects Measurements
www.nookarchitects.com
CHAPTER 3
LININGS Quantity Partial TOTAL

3.1. m2. Treatment of Existing Hydraulic Flooring


Treatment of existing hydraulic flooring, previously grouted with colored mortar decided
by the project manager. 12,00 - €

3.2. pa. Restoration of Vaults and Wooden Beams


Restoration of the plank formed by ceramic vaults and wooden beams. Includes the
reconstruction of specific ceramic pieces as well as the mortar filler in the setting
holes in the false ceiling, when necessary. 25,00 - €

3.3. m2. Re-Plastering the Existing Walls


Chipping, mortar removal, and re-plastering with a good view of the interior vertical
wall. See detail plan. 10,50 - €

3.4. m2. Porcelain Flooring in Wet Areas


Flooring with porcelain pieces, set with porcelain tile adhesive and rejoined with high-
quality waterproof grout. 7,50 - €

3.5. m2. Porcelain Tiling in Wet Areas


Interior vertical wall tiling with porcelain pieces according to the detail plans. Set with
porcelain tile adhesive and rejoined with high-quality waterproof grout. 70,00 - €

3.6. m2. Kitchen Counter


Acquisition and installation of marble counter top. Includes polished edges, creation of
space for sinks, socket insertion, and cutting according to the detail plans. 4,00 - €

ENTIRE PROPOSAL - €
Executive Project Nook Architects Measurements
www.nookarchitects.com
CHAPTER 4
INSTALLATIONS Quantity Partial TOTAL
All of the installations include the help of the corresponding pallets, openings,
passageways, etc.
All of the installations include possible repairs to existing walls such as covering holes
in old ducts or fixing new holes with mortar or putty, etc.

4.1. pa. Installation of Plumbing


Installation of plumbing for two bathrooms, the kitchen, and the laundry room, from the
current connection according to the distribution plan. 1,00 - €

4.2. pa. Installation of Bathroom Fixtures


Installation of bathroom fixtures, from the wet areas to the nearest drain. This includes
everything necessary for them to work correctly. This includes side work on the inner
courtyard to connect the drains. 1,00 - €

4.3. pa. Installation of Electrical and Phone Wiring


Electrical installation according to the plan. Item to be budgeted according to the plan
submitted in early estimations. 1,00 - €
Sockets
Simple light switches
Switchboards
Light points on the wall
TV signal points
Internet connection and network points
Telephone signal points

4.4. Meter and Electric Panel


Relocation of the electrical meter and supplying and placing the new electric panel.
Includes adapting the lines to the current regulations. 1,00 - €

4.5. ud. Supplying and Installing the Water Heater


Supplying and installing the water heater to produce clean hot water. It will be installed
vertically with wall mounts inside the cabinet. 1,00 - €

4.6. pa. Kitchen Vent Installation


Installation of the kitchen stove-top vent using a metal helical duct approximately 200
cm long. Includes connection with the existing community shunt in the inner courtyard. 1,00 - €

4.7. pa. Installation of Central Air Conditioning


Supply and installation of the air conditioning system with heat pump by rigid duct
hidden in the false ceiling, with an indoor unit located in the false ceiling in the
bathroom, and thermostats and the exterior unit located in the building’s community roof. 1,00 - €

4.8. pa. Forced Ventilation in Bathroom B1


Supply and installation of forced ventilation ducts in bathroom B1 by self-acting hidden
duct. 1,00 - €

4.9. pa. Light


Installation of lights according to the plan. Priced by unit. - €
LED lamps built into the false ceiling.
Wall lamps
Hanging lamps

ENTIRE PROPOSAL - €
Executive Project Nook Architects Measurements
www.nookarchitects.com
CHAPTER 5
BATHROOMS Quantity Partial TOTAL

5.1. ud. Toilets


Supply and installation of low-flow toilets. This includes everything necessary for them to
work correctly. 4,00 - €

5.2. ud. Sink with commode


Supply and installation of porcelain sink with commode. Oak finish painted white. 1,00 - €

5.3. ud. Shower Plates


Supply and installation of shower plates with off-center drain at one end. This includes
everything necessary for them to work correctly. Color and texture to be decided by the
project manager. - €
B1 measurements 120x80 cm 1,00
B2 measurements 100x70 cm 1,00

5.4. Shower Enclosure


Supply and installation of sliding panels for shower plates of different sizes. This includes
fittings and everything necessary for them to be installed correctly. - €
B1 measurements 120x190 cm 1,00
B2 measurements 100x190 cm 1,00

5.5. ud. Sink Faucets


Supply and installation of a single-handle faucet for the sink. This includes everything
necessary for it to work correctly. 3,00 - €

5.6. ud. Shower Faucet


Supply and installation of two-way single-handle shower faucet. This includes a fixed
shower head, wall bracket, removable shower head, and hose. This includes everything
necessary for it to work correctly. 4,00 - €

5.7. ud. Bathroom Accessories


Supply and installation of bathroom accessories. - €
-Round mirrors with polished edges 100 cm in diameter
4,00
-Stainless steel toilet paper holder 4,00
-Wall hooks 4,00

ENTIRE PROPOSAL - €
Executive Project Nook Architects Measurements
www.nookarchitects.com
CHAPTER 6
KITCHEN Quantity Partial TOTAL

6.1. ud. Kitchen Furniture


Supply and complete installation of kitchen furniture according to the detail plan.
Includes low cabinetry with drawer system, vertical columns, and an island with
storage. Lacquered doors with color to be chosen by the project manager. 1,00 - €
-Includes balls to have doors without handles.
-Includes shock-absorbing hinges and drawer brakes.
-Includes side panels or finishing strips in the same material as the lacquered doors.

6.2. ud. Kitchen Faucet


Supply and installation of single-handle kitchen faucet. This includes everything
necessary for it to work correctly. 1,00 - €

6.3. ud. Sink Embedded in the Counter Top


Supply and installation of stainless steel sink to be installed in the counter top.
Includes grid-style drainage valve. 1,00 - €

6.4. ud. Kitchen Appliances


Supply and installation of all kitchen appliances, including start-up and manufacturer
guarantee according to regulations. - €
Multipurpose oven 1,00
Integrated dishwasher 1,00
Stove top 1,00
Integrated combination refrigerator 1,00
Decorative ventilation hood 1,00

ENTIRE PROPOSAL - €
Executive Project Nook Architects Measurements
www.nookarchitects.com
CHAPTER 7
CARPENTRY AND METALWORK Quantity Partial TOTAL
All carpentry work including ironwork, with handles to be decided by the project manager,
and the necessary additional pieces for them to be installed and function correctly. All
measurements will be checked on the work site.

RESTORATION OF EXTERIOR CARPENTRY

7.1. ud. Restoration of Hinged Balconies


Restoration and replacement of windows on wooden balconies with two sides, measuring
approx. 110x220 cm. Includes the renovation of the drainpipes, replacement of side
covers, revision of imperfections, and replacement of ironwork if necessary.
2,00 - €
Measurements to be checked on the work site.
7.2. ud. Restoration of Hinged Windows
Restoration and replacement of windows in hinged wooden frames. Includes the
renovation of the drainpipes, replacement of side covers, and revision of imperfections
and varnish. Measurements to be checked on the work site. - €
Double-door window V-01 in H1 1,00
Single window V-02 in Hallway 1,00

7.3. ud. Restoration of Painted Shutters


Restoration and cleaning of painted shutters on the main facade. Replacement of
deteriorated pieces, ironwork, and mechanisms. 2,00 - €

NEW EXTERIOR CARPENTRY

7.4. ud. Balconies and Gallery Fixtures


Supply and installation of aluminum balcony with hidden sheet of two hinged frames.
Measurements according to detail plan. 1,00 - €
Room H3 measurements approx. 300x300 cm

7.5. ud. Casement Window


Supply and installation of aluminum balcony with hidden sheet of two hinged frames.
Exact measurements according to detail plan. 1,00 - €
Room H2 measurements approx. 130x95 cm

NEW INTERIOR CARPENTRY

7.6. ud. Swinging Doors


Supply and installation of single swinging door measuring 83x210 cm. Lacquered finish
with size and color to be determined by project manager. 4,00 - €
-Includes covers for jambs and upper lintel.

7.7. ud. Restoration of Front Door


Restoration and cleaning of front door. Replacement of deteriorated pieces and ironwork.
Includes safety lock mechanism. 1,00 - €

FURNITURE

7.8. ml. Desk M-01


Supply and installation of pine wood desk measuring 360x55 cm, including metal mounts.
See detail plan. 1,00 - €

7.9. ml. Furniture in Bathroom M-02


Supply and installation of 5 cm pine-wood toilet cover measuring approximately 170x55
cm, including side panel, 80 cm removable drawer, and hidden metal mounts. 1,00 - €

FINISHES

7.10. m2. Oak Parquet


Supply and installation of oak parquet. Installation according to plan. 55,00 - €

7.11. ml. Floor Molding


Supply and installation of floor molding in the entire dwelling, except the bathroom. Model
and color to be decided by the project manager. 112,00 - €

ENTIRE PROPOSAL - €
Executive Project Nook Architects Measurements
www.nookarchitects.com
CHAPTER 8
PAINT Quantity Partial TOTAL
The paint for the interior carpentry and entrance door to the dwelling is included in the
following items.

8.1. m2. Interior Vertical Wall Paint


Priming of interior walls and application of two coats of paint on vertical wall surfaces.
Colors to be decided by the project manager. 250,00 - €

8.2. m2. Enamel Paint in the Kitchen


Priming the interior walls and applying two coats of enamel paint to the vertical wall
surfaces in the kitchen. Colors to be decided by the project manager. 18,00 - €

8.3. m2. Paint for False Ceilings


Priming and painting new ceilings with smooth paint, including the corresponding parts of
the vertical walls. 90,00 - €

8.4. m2. Varnish on Ceramic Vaulting


Priming the vaults with two coats of matte varnish. Includes repair of any cracks there
may be. 25,00 - €

8.5. m2. Varnish for Wooden Beams


Priming wooden beams with two coats of matte varnish. Includes repair of any cracks
there may be. 36,00 - €

8.6. ml. Repair and Painting the Railings


Repair of exterior metal railings on the gallery and main facade, to later be painted with
varnish. Color to be decided by the project manager. 13,50 - €

ENTIRE PROPOSAL - €
Executive Project Nook Architects Measurements
www.nookarchitects.com
CHAPTER 9
MISCELLANEOUS Quantity Partial TOTAL

9.1. pa. Floor Cleaning


General cleaning of the entire work site when finished. 1,00 - €

9.2. pa. Cleaning of the Common Areas


General cleaning of the entryway and stairwell in the common areas once the work
is finished. 1,00 - €

ENTIRE PROPOSAL - €
Executive Project Nook Architects Measurements
www.nookarchitects.com

CHAPTER SUMMARY TOTAL

1. Demolitions and Prior Work - €


3. Linings - €
4. Installations - €
5. Bathrooms - €
6. Kitchen - €
7. Carpentry and Metalwork - €
8. Paint - €
9. Miscellaneous - €

ALL PROPOSALS - €

TOTAL PROJECT BUDGET - €