To : AKSHAY

From : LOUKSHA
Contract Package No : quotation
PROJECT - Villa
QUOTE FOR proving and fixing RCC works , finishes works including material and Labours for AKSHAY

Basic Price
Sl Local Description Unit / unit Qty Rate Amount

Providing, instaletion and handing over on unit as per below


Sft
items and specification as Slab Area rate basis
3000 1980 5940000
A Structural
Providing and fixing of subsoil Leveling, PCC( M10 & 15),
shuttering beam , colum , RC wall ,& Core wall with ply board
shuttering and slab area shuttering with MS plate joints to be
grind and ( no ceiling cement plastering , ceiling to be finish
with POP punning , reinforcement ( Fe 500), concreting( M20
& M25), dishuttering , Block works , internal & external
plastering
Sttel FE 500 ( Kamdhenu , Gopala, India Gold VRKP) Mt Rs 48000

Cement Birla , Ultra tech , penna , ramco, Maha Bags Rs 275


Block works 6" Block Masonry works Building & Parapet
4" Block Masonry works Building.
Ceiling plaster Ceiling plaster consider as POP finishes
B Flooring
Living & Dining Sft 150.00
Indian Marble Flooring
Sit out Premium Quality Anti skid ceramic tiles Sft 35.00
Masterbed
- Sft 120.00
room Laminated wooden flooring
Children bed
Sft 45.00
room Premium Quality vetrified Tiles 2feet x 2 feet
Kitchen Premium Quality vetrified Tiles Sft 45.00
Utility Premium Quality vetrified Tiles Sft 45.00
Toilet( flooring Premium Quality Anti skid ceramic tiles Sft 35.00
Tread & Riser - Sadarhalli Grey granites and landing premium
Staircase Sft 65.00
quality vetrified tiles
lift loby and
loby passages sft 45.00
flooring Premium Quality vetrified Tiles
Lift loby lift
door cladding
300 mm all
around Sadarhalli Grey granites Sft 65.00

C Wall Finishes
Exterior of
building Exterior grade paint(Apex paint for external wall)
Acrylic emulsion Paint(Oil Bound Distemper for Basement
ceiling,Plastic Emulsion paint for ceiling &
Internal wall Inside walls
Ceiling Synthetic Distemper
D Door , window & Ventilators
Second class teak wood main door frame with Both side teak
veneer finsh flush door , Internal door Sal wood door frame
with ready
made moulded doors shutters or Hardwood frame with
engineered wooden door shutter , premium quality door
All Door handle , lock , tower bolt, hinges
3 track UPVC windows with provision for mosquito mesh
Windows shutter
Ventilators UPVC frames with frosted glass
E Railing
MS railing (Enamel Paint for MS works &
Balcony Railing Doors)
To : AKSHAY
From : LOUKSHA
Contract Package No : quotation
PROJECT - Villa
F Kitchen Finishes
Two Feet band of ceramic tiles dedo above polished granite
counter top with stainless steel single bowl sink having drain
board
G Toilet Finishes
Master toilet & Common Toilet - Premium quality CP fitting &
sanitaryware

Toilet dedo - Premium quality ceramic Tiles up to lintel level

H Electricals

Adequate light and fan points with 6/16A switches / Socket-


Modular Switchs , provision of AC points in Living & bedrooms
. TV and Telephone Points in MBR and Living rooms , Provision
for electric Chimney , hob, Grinder, Fridge, Water Purifier &
microwave points in kitchen , Provision for washing machine
poin in utility
I Plumbing
water points in kitchen ,with RO provision Toilet - all CPVC pipe
and PVC pipe from Asirvad or equalavalent , Utility - Washing
machine outlet and one water points
Note Tax and GST will extra as per Government norm
Main Enrance Gate , Club House , Heated Swimming Pool ,
Yoga Pavilion, Walking Trail, Lily Pomd, Beach
Volleyball,Children's Play Area , Creicket Practice Nates ,
Tennis Court, Badminton Court, Half Basketball court & any
kind of landscape and hardscape Rate not included in this basic rate
Earth work and back filling is in client scope
1 Land provided by client Free of cost for labour camp , site office , and working place
2 water for labour camp and site work - one point to be provided from Client and distribution is in contractor scope
3 Manpower Supply For Miscellaneous Works chargeable
4 Measurement--Slab Area to be measure including Chhajja , balcony, podium) no deduction for cutout , shaft , lift pit
Running bill -- every month 25 th days bill to be submmited 50 % to be released with 7 days and balance
5 to be released 15 days of bill submission