You are on page 1of 7

Area 10’x10’=100 sft Rs.

2,00,000/-

Please find the following details of the deliverables

DESCRIPTION
DESIGN
1 Architectural Site Layout Plan
Design
Architectural Detailing
2 Elevation This Proposal includes basic elevation design for your home
Elevation is presented for client to choose

CIVILWORKS

1 Earth Work Excavation and backfilling with proper proctor density


2 FloorHeight 10 feet
3 Form Work Slab, Column(9”X9”) and Beams (9”X12”):Plywood sheets
4 Brands Magna 550 ,Kamdhenu,or Equivalent
Reinforcement MS binding wire
Steel 550 PVC cover blocks
Grade
M20Nominal Mix,columns,beam and slab.
5 Concrete
All concrete works will be of site mix.
PPC(Portland Pozzolana Cement)for masonry,Plaster,forTiling
Brands:JK Super Cement , Shree Jung rodhak
6 Cement
Clay blocks (Red
Bricks)Internalwalls-
100mm/4”
7 Masonry Externalwalls-230mm/9”
8 Sand
River sand for jointing mortar or adhesive

External plaster-Cement&River sand using water proofing


8 ExternalPlaster chemical wherever necessary
Internal plaster (wetareas) Cement and River sand
Internal plaster (dry areas
9 InternalPlaster

Ceiling-Whitecement/GypsumbasedputtyorCementandRiversand
10 CeilingFinishing if required.

PLUMBINGANDBATHROOM

External and Internal water supply system


1 Concealed Wall concealed pipes wherever required:Chlorinated
polyvinylchloride(CPVC)
Brands :Finolex,Ashirvad , or Equivalent
Wall tiles-Ceramic highlighting tilesup to 7ft.height(Fixed
over plastered area with cement fixed with SBR Bonding
2 Wall Tiles agent) (Only For Bathrooms)

(Ground Floor ) Floortiles- 2’X2’ Vetrified Tile


3 Floor Tiles (First Floor ) Floortiles- 2’X2’Vetrified Tile

4 Over HeadTank OHT of 1000 ltrs will be provided


ELECTRICALS

Sufficient light and Power Points as per requirement and electrical design
Wires-Flame Retardant copper wires as per requirement
1 Wires&Cables from1sqmm to 4 sqmm.

BrandsA-Guard ,Flexo Flex ,


2 Switchesand Brands:GM,Hifi,orEquivalent
Sockets Earthing and main connection will be charged additionally

DOORSANDWINDOWS

1 MainDoor Teak Wood Frame 6”x4” &Engineered Door Shutters 35mm


(Factory Finished) or Made in site include door hardware,
Hardware Include eye piece, lock body, aldrop, tower bolt etc

Neem wood frame of 5” x 3” size & Shutter fiber readymade


2 Bed room Doors doors including hardwre , Hardware like mortise lock , aldrop,
tower bolt, door stoper etc.

PVC Frame & Door Shutter including hardwre , Hardware like


3 ToiletDoor Baby latch, tower bolt, etc
Door Kit-Brass alloy
4 DoorKit All Hinges are SS except Main door

5 Windows
Aluminium Powder Coated Two Track Sliding Windows

KITCHEN

1 Counter top(Ota) Countertop-Blackgranite

2 KitchenSinkanda Stainless Steel Wash Basin


ccessories
PAINTING
Internal paint –
2coat putty+1coat primer+2coat Paint for all plastered area.
1 Painting
Externalpaint-1Coat Primer + 2 Coat Paint –

Asian
Brand
ADDONFEATURES
1 Fabrication MS Railing is provided for the external balcony staircase and
balcony (if any). ( Main gate not consider for First Floor )
TERMSANDCONDITIONS

Price may vary depending upon city (location),plot/siteconditions,applicable structural design


and final chosen finishing items/features/add-ons

IncludedinPackage
 The home package price completes turnkey construction (Design+Build) solutions
whichin clude architectural, structural & Services drawings, procurement of
materials as per individual packages pecifications/brands and laborcost for the
entire construction.
 External development like CompoundWall,Driveways,BuildingGate,UnderGroundwater tank,
water tank connection, and External beautification. Shall be quoted separately as the design
fexternal development is frozen and agreed upon.
 Compoundwall at Rs.1400 per Running feet
 Compound wall as needed with solid blockof4”thick
 Foundation for compound wall with excavation,PCC and Size stone masonry(SSM).
 5’Feet height wall above DPC.Wall will be plastered and Painted on the both side as needed.
 Compound wall may be choosen depending on elevation.
Exclusion sand Incidental sin thePackage

 Borewell,Water inlet from corporation,sewage


connectionManhole,Lift,Earthing,Electrical fittings (Fans, blubs, etc.) and State
Electricity Board Meter are not include inpackage.
 All watersupply and Electricity connection upto mater board will be in clients cope.
 Curing will be inclient scope
 Aspecific area to construct labour shed and Storage room need tobe provided by the client
which is within 50feet from the construction place.
 Submersible pump and auto level controller for tanks are in clients cope.
 If the client needs other material which is not specified in the list, then the difference
amount need to be paid by the client.
 Individual Items shall be quoted.

Note:
1.Exclusion quote would be extra above package cost.

Duration of the Project


The averaget ime Is 6-8months.
PaymentScheduleExample
Payments terms are linked to progress of construction, evenly spread across
constructionperiod.
Illustratedfor G+1 (Structure)
 On signing of contract (asadvance):25%
 Up to Lintle Level :25%
 Upon completion of Slab:25%
 Finishing Level :20%

Note – Project completion or hand over of the building shallbe 6-8 months for Singlefloor
or 8 to 10 months for G+1 or 12 – 15 Months for G+2, from the date commencement of
construction., any delay to complete the building by the party,

Responsibilities of Customer

 Setup Water and Electricity :Single point water and electricity supply to be provided
at Plot.

Thanking you ,Owner