Professional Documents
Culture Documents
Material
A+ Grade Building Material
Ultratech Cement for Slab and Columns
JK Super Cement for brickwork & Plaster work
Steel Brands will be Rathi & Kamdhenu
Electrical Conduiting(polypack heavy) inside roof slabs and walls included
Plumbing conduiting (Astral/Supreme) inside walls included
Split AC conduiting(godrej) is included
Pest Control at ground level is included with 5 yrs warranty
Floor to Floor Height – mainly 10 ft
Page 1
Construction
Side- Length-Foot
78.1660106175
length Width
17.825-Buildable zone 3-Front 3-Back Is 23.825 10.6
Total Cost
7873600
142500
155000
8171100
1470798
9641898
Page 2
work
Plumbing Work
Electrical Work
Page 3
work
Flooring
Page 4
work
Bathrooms
Kitchen
Finishing
Page 5
work
Tiles on roof
Page 6