AGREEMENT
BETWEEN
Mr. Anand raj (S/O Mr. ----------------------- ) , aged about ----------- Years ,
1
residing at ---------------------------------------------------------------------, Chennai – 600 .
2
herein after called the ‘OWNER’ which term wherever it occurs herein and the
context so permits, shall mean and include the said owner, his respective heirs,
AND
here in after called ‘CONTRACTOR’ which term wherever it occurs here in and the context
so permits, shall mean and include the said contractor , his respective heirs, legal
3
The details of agreement are given as below.
1. Building Area Details:
Total Rs.44,57,600
4
Residential Building
Ground floor Specification
1. BUILDING PLANS
a. Working Drawings
b. Structural Drawings
c. Electrical Drawings
d. Plumbing Drawings
e. Journey details
2. TESTS
a) Soil Test
b) Water Test
3. EARTH EXCAVATION
a) As per Client structural Drawing
5. Reinforcements
a) Footings (As per Client structural drawings)
b) Columns (As perClient structural drawings)
c) Beams (As perClient structural drawings)
d) Slabs (As per Client structural drawings)
5
6. Concrete
a) Ratio 1 : 1 ½ : 3 (M25)
b) Cement
Coramandel,ultratech,Ramco,
c) Steel(TMT Bars Fe 500) -- ARS,
d) Mixer – Using Mixer Machine.
e) Water proof liquid mixed with concrete in roof area.
f) For concrete Curing 15 days
8. Roof
a) Ten Feet Height
b) Slab thickness as per structural drawing
c) Centring work with Jacky & span
d) Curing Time – 15 days
6
11.Plastering ceiling & Beams
a) Proper hacking
b) Ratio 1 : 4
c) Thickness 20mm
d) Curing 10 days
12.Plastering walls
a) Chicken mess between beam & brickwork
b) Ratio 1 : 4
c) Thickness 20mm
d) Curing 10 days
14.Doors
a) Main Door
First quality sudan Teak wood door size 7’0” x 3’6” and Frame size 5’x 3” will be
provided with brass fittings and fully varnishing
b) Bedroom Doors
Padak wood frame size 4 x 2½ ” with 32mm thickness solid membrane doors
shutters.
c) Bath Doors
First quality fully PVC Doors
d) Anti-terminate oil will be applied for all wooden frames.
15. Windows
a) Padak wood frame & shutter with glass
b) Frame size 4’x2½” & shutter3’x1½ ”
c) Window size for kitchen(as per drawing)
d) Window size for Bedroom(as per drawing)
e) Window size for Hall(as per drawing)
f) Number of windows (as per drawing)
7
16. Ventilators
a) Bathroom Aluminium ventilator size 2 x 2
b) Kitchen – Exhaust fan provision concrete ring size 9” dia.
17. Electricals
a) Wiring – Orbit,finolex,poly cab(fire Resistance) wire fully concealed
b) Switches – Anchor Roma or GM Switches
c) Points – Five Points each Rooms
d) Tv points – In the hall only
e) A/C points – In all Bedrooms
f) Geyser points – In all the bath rooms
g) Two way switches – In all Bedroom.
h) Electrical drawing and switch points will be revised after signing the contract or
during constructing.
18. Plumbing
a) Pipelines – Outer pipe lines will be 15kg PVC pipes. Inner pipe lines will be CPVC
pipes fully concealed
b) Stop value – Each house has a separate stop value for bore water near the tank.
c) Metro water line – Separate metro water line for all the kitchens only.
8
21. Tiles
10
PAYMENT TERMS
1. 7% of the agreed contract amount paid as advance along with Agreement
2. 6% of the agreed amount paid after the completion of footing & column till
ground level.
3. 5% of the agreed contract amount paid after the completion of plinth Beam.
4. 4% of the agreed contract amount paid after the completion of Basement.
5. 5% for procurement of wood work.
6. 10% for ground floor column, roof steel &cement.
7. 3% for ground floor, on the day of concreting
8. 10%for ground floor brick work
9. 5% for ground floor lintel loft & sunshade
10.5% for parapet wall.
11.5% for inner plastering
12. 5% for outer plastering
13. 5% for plumbing and electrical pipe lines.
14.5% for completion of outer plastering
15.5% for completion of inner plastering
16.5% for procurement of tiles
17.5% for electrical & plumbing fittings
18.5% for completion of painting
11
In witnesses whereof the owner and the contractor herein have
Set their respective hands and seal to this Agreement on the day month
and year first above written in the presence of the following witnesses:
Owner Contractor
Witnesses:
1.
2.
12