Vaibhav Construction

Phone:9444339583.Mail.jayakandanr@gmail.com

04/07/22

To,
Mr.V.Chandrasekar,
Bhavani Nagar,
Pozhichalur,
Chennai.
Sub: Quotation for the construction of the residential house
Located at Pozhichalur,Chennai .
Dear Sir,
Please find the details of the cost of construction along with specifications
S.no Description Qty Rate per sft Amount
1. Construction Area
Ground floor 999sq.ft Rs.2100 20,97,900
First floor 999sq.ft Rs.2000 19,98,000
Head Room 125sq.ft Rs.2000 2,50,000
2 Weathering course 999sq.ft Rs. 190 1,89,810
3 RCC Sump 5000 lit Rs.25 1,25,000
4 Septic tank (9inch brick 10000 lit Rs.22 2,20,000
wall)
5 Compound wall -6 ft from 110 Rft Rs.1800 1,98,000
Ground lvl with hollow
block
6 SS Handrail LS 50,000
7 Steps -12*12 ceramic tile LS 40,000
8 Platform & Ramp LS 35,000
9 Additional basement height 1ft Rs.75

TOTAL 52,03,710
Specification:
1.RCC Framed structure.
2.Brick work in superstructure
3.Basement height -4 ft from existing ground level and Parapet
wall height-3.5ft.(4.5”Thick wall)
4.Roof height 10’0”(floor to floor).
5.7’ft height lintel level:
a.Cut lintel for 9”wall.
b.Continued lintel for 4.5”wall.
6.Wall thickness:
a.Outer wall 9” thick, inner wall 4.5”thick.
7.Painting:
a.Varnish for Maindoor.
b.Asian brand Enamel paint for all other door, windows & grill.
c.Interior wall-2 coat of putty with emulsion (Asian tractor
emulsion)
d.Exterior wall-one coat of primer paint &2 coat of ACE emulsion.
8.Doors & Windows:
a.Main Door-1st quality teak wood frame and door.
b.Bedroom door-2nd quality teak wood frame with flush door.
c.Bathroom door-Pvc door.Window-upvc windows(or)wooden
window (2nd quality teak frame &shutter with glass)

9.Tile:
a.Floor-2x2 Vitrified tile ₹52/sft .
b.Bathroom & kitchen -Ceramic tile Rs.47/sft.

2
10.Electrical:
a.Wire -Orbit brand.
b.Switches-Modular (white colour)Basic model Norwood or any
Standard make.

11.Plumbing & Sanitary:


a.Parryware closet,wash basin(basic model,white color)& fittings
b.ISI Branded Pvc & cpvc pipe material.

13.kitchen platform:
a.Black or Red granite with 1.5” x 2’ ss sink.

14.loft&Cupboard:
a.Every Bedroom & kitchen should have one loft(2’ width),one
Cupboard with Kadapa slab (4’x7’)

15.Doors &Windows size:


a.Main door-3’6” x7’,Bedroom door-3’x7’,Bathroom door-2’6”x7’.
b.Window:Hall-5’x4’-1no,kitchen-4’x3’-1no, bed-5’x4’- 1no ,
ventilator-2’x2’-1no
16.Plastering:
a.Ceiling and wall plastering will be smooth finish.
b.External plastering will be rough finish.
17.Concrete:
a.Footing,coloumn,Roof slab and beam-M20grade manual
Concrete,

3
Material quality ,Brand & Cost.
1.Cement-Ramco,zuari,Ultratech
2.Steel-ISI Make.(Fe500).ex-Kamatchi
3.Bricks-Good quality.
4.Sand-Msand,Plastering (P sand).
5.Wire-orbit.
6.Paint-Asian brand.
7.Tile Cost:
Floor Vitrified -₹52/sft.
Bath tile,step tile,kitchen tile,parking tile -₹45/sft
8.Bathroom fittings-Parry ware (Claret model ).
9.Sink-SS sink₹ 1800/no.
10.kitchen granite -Black granite(₹110/sft).
11.Cupboard slab-Kadapa slab
12.Main door-Teak door-₹12000/door
13.Bedroom door -flushdoor-2000/door
14.Toilet door (Pvc door)-2000/door
15.Step handrail-MS Pipe rail or3” brick wall with plastering.
16.Parryware washbasin (₹1000/no)
17.Maindoor lock with handle -₹3000/door,
Bedroom door lock-₹750/door.
18.Door fittings-Main door -Brass hinges,Bedroom door-SS hinges.
19.Roof concrete-Ready mix concrete (RMC)-M25.
20.Compound wall gate Maximum cost will be₹15000.00/no(10’x5’6”)
21.Western closet -Parryware (white basic model).

4
Additional work at extra cost:
1.SS Hndrail,step granite or kotta stone.
2.Balcony grill,Tank steel ladder.
3.Interior work,false ceiling.
4.Water source for construction work.
5.Building around soil filling and platform.
6.Pest control.
7.Additional basement Height.
8.Eb Mainboard, cable .
Note:
1. The Cost of Boring for Water & Electricity Board has to be borne
bone by owner.
2. Our Cost of construction is adhere to our specification if any
deviation from the specification will be done at extra cost.
3. Deviation from the existing drawing will be at extra cost.

Thanks

(R.jayakandan)
For Vaibhav construction