SMARTHOME CONSTRUCTIONS

Building contractor:

Mohideen Meeran Yousuf


110A, 6th Street,
Eruvadi.

Owner Name:
Mr. Hameed Sha
Eruvadi.
Date:14/09/2023

AREA AND STRUCTURAL DESIGN

AREA:

House: A

 Ground Floor = 945.00 SQFT


 First Floor = 467.00 SQFT

STRUCTURALDATAFORGROUNDFLOOR:
Pillar:

Number of pillars based on the structural design -14 no.s

Pillar Earth Excavation:

Length 4’0”
Breadth 4’0”
Depth 6’0”

40mm PCC concrete (1:4:8)

Length4’0”
Breadth4’0”
Depth0’6”

Pillar bed 20mm RCC concrete(1:2:4)

Length 4’0”
Breadth 4’0”
Depth 1’3”(Steelbar10mm) 6”c/c
Pillar rising 20mm RCC concrete (from PCC level to road level):

Length - 1’00”
Breadth - 9”

Pillar Specification (Ø):

16mm - 4numbers & 12mm - 2numbers


8mm stirrups between 8” c/c

Earth preparation for Plinth Beam : (1:2:4)


 Beam bed preparation width - 1’3” depth - 1’0”.
 40mm PCC Concrete width - 1’3”,depth - 0’6”.
 Plinth structural beam size - 9”x1’0” for complete structural area
 Steel bar specification(Ø)
12mm – 5 numbers
Necessary additional steel will be used for load balancing

Basement level:

 Height 3 feet from road level to basement level


 9” Brick wall from plinth beam to damp proof course (DPC)
 DPC concrete (1:2:4) with waterproofing mechanism
 Basement level refilling by gravel or crusher waste.
 Earth embankment
 40mm PCC concrete 1:4:8

Basement level to roof level:

 Pillar shoe marking.


 Pillar rising from plinth beam to roof level.
 Brick wall construction till lintel level
Specification
Width-9”,
Height- 7’0”
 Lintel level concrete
Specification
Width-9”
Height-6”
Steel bar specification (Ø)-10mm/8mm
 Brick wall construction from lintel level to roof beam (1:7)
Specification
Width-9"
Height- 1’6”
 4½” brick wall in required places.

Roofand beam:
Beam specification

Width-9”
Height – 1’0”
16mm/12mm
8mm stirrups between 8” c/c
Necessary additional steel–16mm(Ø) Roof
RCC Concrete (1:2:4):

 Depth 4½” 10mm/8mm 6”c/c.


 Concealed beam 12mm or 16mm(Ø) stirrups-8mm 8”c/c.
 Staircase concrete -12mm(or)10mmØ

Brickwall:

 Parapet wall width 4½”,height3,0”

Plastering work:

 Inner wall (1:5)


 Ceiling(1:3)
 Outer wall
 Staircase bottom and side
 Parapet wall
 Other necessary places
 Cement plastering thickness 12mm/ 18mm.
Flooring work:-
 Ground floor, First floor inner flooring area tile specification
Type - Marbonite
Size-2*2(OR)4*2
Price Range -Rs.45to 50
 Rest room wall
tile
Height - 7 feet
Size-10”/15” (OR)12”/ 18”
Price range– Rs.35toRs.40
 Rest room flooring grip
tiles Size - 1/1.
 Staircase steps grip tile

Shelf and lintel slab:

 RCC lintel slab (Loft) with inner shelves width 1’6”x3”.


Lintel slabs will be constructed based on client requirements.

Wood and Grill:

 Main door 1numbers 7’0”*3’6”


 Inner door 4numbers 7’0”*3’0”
 PVC door 2numbers 7’0”*2’6”
 Window wood or UPVC 6numbers 4’6”*3’3”
 Kitchen(W) wood door UPVC 1numbers 3’0”*3’3”
 Ventilation 2numbers 1’6”*2’0”
 Head Room Steel Door 1Numbers 7’0”*3’0”

Kitchen:
 Kitchen slab-Granite stone
 Kitchen shelves-RCC slab or kadapa stone
 Stainless steel (ss) sink 24”*18”
 Storage shelf –RCC Slab or Kadapa stone
Electrical Details:
 Hall
Light and fan–3 points
Plug point (Including TV point)–2points
Inverter – 1 point
 Bedroom
Light and fan–2points
Plug point – 1 points
AC point – 1 point
 Restroom
Light and exhaust–1points Heater
– 1 point
 Kitchen
Light and fan–4points
Plug point – 4 points
 Portico
Light and fan–3points
Plug point – 1 points

Plumbing and Sanitary ware Details:


 Kitchen
Tap–1
Water purifier–1
 Restroom
Tap–2
Health faucet–1
Shower – 1
Western or Indian closet –1
 Dining
Washbasin–1
 Over head tank
PVC tank – 1
Capacity–1000liters
Material Specifications:
 Cement (ISI Standard) – Sankar brand
 Steel - (ISI Standard)
 Vitrified & Bathroom Tile ISI Standard
 Electrical Switches - (ISI Standard)
 M.Sand First Quality
 Lime First Quality
 Aggregate 40Mm First Quality
 Aggregate 20Mm First Quality
 Wood

Notes:-

 Measurement roof outer/outer will be taken after project


is completed
 The material amount has been increased than the
previous estimation so you will be paying extra
amount.
 Quotation and price validity only 6month only
AMOUNT FOR TOTAL BUILDING

FLOOR SQFT RATE AMOUNT

GROUNDFLOOR 945 2000 18,90,000/-

FIRST FLOOT 467 1700 7,93,900/-

STAIRCASE ---- ---- ----

ELEVATION WORK ---- 650 ----

OLD BUILDING

DEMOLISIH AND DISPOSE ----

SUMP (per liter – 25/-) ----

TOTAL 26,83,900/-

BuildingOwner: BuildingContractor
TERMSANDCONDITIONS:

Dear customers, our company will get the amount


based on the below conditions with part by part. If any changes in your
completed quotations (change in plan and accessories) you have the full
th
responsibility for the extra amount. This price for 6 month only

(15/07/2022 to 14/01/2023).

PARTS AREA PERCENTAGE AMOUNT SIGNATURE

OFAMOUNT

Part1 Basement level 30% 8,05,170/-

Part2 Basement level to roof 20% 5,36,780/-


level Brick wall

Part3 Roof Concrete to first 25% 6,70,975/-


floor brick wall and
parapet brick wall

Part4 Inner, outer plastering 20% /-5,36,780


, Inner flooring and
electrical, plumping

Part5 (Paintingwork) 5% 1,34,195/-

BuildingOwner: BuildingContractor: