You are on page 1of 2

SPECIFICATION OF BUILDER FLOOR

SCHEDULE-D
1 Flooring - Drawing Room, Dining Room, One Master Vitrifies Tiles
Bedroom
2 Flooring - Three Bedroom Imported Tiles & Vitrifies Tiles
3 Flooring - Driveway, Staircase, Front and Rear Vitrified Tiles/Granite
Courtyard and Kitchen and rest areas.
4 Wall Finishing:- Vitrifies tiles in bathrooms with the
combination of highlighter
 Bathroom
 Kitchen (2ft above counter slab)
5 Wall Finishes :- Internal Rooms, Drawing Room, Lobby Plastic Emulsion on wall and ceiling
and other Internal Area.
6 Wall Finishes :- Kitchen, Bathroom, Staircase and OBD
other Common Area
7 Wall Finishes :- External Area - Rear Apex on wall and Texture on Brick Railing

8 Wall Finishes :- External - Elevation (with the Combination of Apex paint/designer tiles/
consultation with latest trends) as per requirement and ongoing trends.

9 Wood Finishes :- All Window along - with Frames ( UPVC Windows & Wooden Doors
Internal)
10 Bathrooms :- C.P fitting / Faucets/ Taps/ WC. Jaguar, Hindware (W.C)/Equivalent

11 Doors height:- Flush Door with veneer on both sides and


placed with teak margins on all the edges.

12 Hardware :- Door Bedroom locks of Doorset make or


equivalent
13 Almirah/Cupboards:- Internal Cabinets and frame The Frame and internal cabinet to be made
of commercial ply with laminate/mica
pasting
14 Almirah/ Cupboards :- Shutters Shutter will be claded with PU Finish
15 Electrical Wiring KEI, PLAZA
16 Kitchen :- Modular Kitchen cabinets with all hardware Modular Kitchen with Chimney and hob,
including baskets, Channels, handles, glass fittings, Microwave and Micro Oven (Faber Brand)
sink and faucet along with granite counter top.

17 Glass work :- External 6mm thick float glass in all window


18 POP :- Ceiling Drawing, Dining, Bedroom Four Side False Ceiling as per design

19 POP :- Wall Punning to be done with S.S in accordance


with elevation design
20 Balcony railing (Front Balcony) and staircase railing To be done with S.S with Glass in
would be done with S.S with glass accordance with elevation design
21 Balcony railing (Rear Balcony) To be done with M.S in accordance with
elevation design
22 Front Gate:- In M.S with combination of Glass & HPL

23 Water Storage tanks - Underground 4 No. Individual tanks 2000 ltrs capacity for
each floor.
24 Water Storage tanks - Overhead 4 No. Individual PVC Water tanks of
Capacity 1000 ltrs each floor with necessary
fittings and over flow pipes
25 Electrical Switches Modular Switches of make - Fybros
26 Electrical light and fitting (Fancy lights to be provided All cove lights along with concealed lights in
in drawing and dining Room POP to be provided in Lobby drawing room

27 Water pumping motor A separate pumping motor capacity 1 hp


would be given for each Floor
28 Wall Paper In Drawing Room Wall and One Master
Bedroom Wall
29 A.C Provided 2 A.C in the capacity of 1.5 ltr.
Brand-Voltas
30 Jhoomer 2 Designer jhoomer will be provided in
drawing & dining room
31 Vanity Vanity will be provided in all bathrooms

32 Fan Provided Fan in each room Brand-Orient

33 Lift Spire
34 Staircase S.S Railing will be provided in Staircase

You might also like