SCHEDULE-D
1 Flooring - Drawing Room, Dining Room, One Master Vitrifies Tiles
Bedroom
2 Flooring - Three Bedroom Imported Tiles & Vitrifies Tiles
3 Flooring - Driveway, Staircase, Front and Rear Vitrified Tiles/Granite
Courtyard and Kitchen and rest areas.
4 Wall Finishing:- Vitrifies tiles in bathrooms with the
combination of highlighter
Bathroom
Kitchen (2ft above counter slab)
5 Wall Finishes :- Internal Rooms, Drawing Room, Lobby Plastic Emulsion on wall and ceiling
and other Internal Area.
6 Wall Finishes :- Kitchen, Bathroom, Staircase and OBD
other Common Area
7 Wall Finishes :- External Area - Rear Apex on wall and Texture on Brick Railing
8 Wall Finishes :- External - Elevation (with the Combination of Apex paint/designer tiles/
consultation with latest trends) as per requirement and ongoing trends.
9 Wood Finishes :- All Window along - with Frames ( UPVC Windows & Wooden Doors
Internal)
10 Bathrooms :- C.P fitting / Faucets/ Taps/ WC. Jaguar, Hindware (W.C)/Equivalent
23 Water Storage tanks - Underground 4 No. Individual tanks 2000 ltrs capacity for
each floor.
24 Water Storage tanks - Overhead 4 No. Individual PVC Water tanks of
Capacity 1000 ltrs each floor with necessary
fittings and over flow pipes
25 Electrical Switches Modular Switches of make - Fybros
26 Electrical light and fitting (Fancy lights to be provided All cove lights along with concealed lights in
in drawing and dining Room POP to be provided in Lobby drawing room
33 Lift Spire
34 Staircase S.S Railing will be provided in Staircase