PMG BUILDING VACUUM PLANT ROOM SNAGS LIST

S.NO DESCRIPTION ATTENDED BY CIVIL INSPECTED BY CIVIL QC INSPECTED BY RE REMARKS


completed completed after external painting completed completed completed completed completed completed MEP after complete cable pulling MEP 1 Wall touchap to be done 2 Unwanted holes to be closed for wall and ceiling 3 Door frame and shutter to be painted 4 Ceiling area gas welded to be painted 5 Floor to be painted 6 Shaft cutout and pipe cutout to be close with master board 7 Floor skirting to be painted with approval paint 8 Wall area unwanted holes to be fill and painted 9 Make house keeping to be properly 10 Ceiling area unwanted hanging rod to be removed Trunking shaft to be closed with master board

Fire wall ducting around fire sealant to be filled AHU138/SAD/P25 duct supporting chennal nut & bolt rusting to be painted Ceiling level drain pipe to be painted

MEP

MEP

Prepared By MINOJ/HARI QA&QC ENG