MANTRA PROPERTIES

• CHECKLIST: POP/ GYPSUM WORK

Project Name:
Building No:

Drawing Reference:

Start Date:

Contractor:

Fiat No / Slab No:


Checking Date:
Completion Date:

PRE EXECUTION CHECK


1 Cleaning of entire floor is done
2 Surface preparation is satisfactory
3 Hacking of concrete surface (60 to 70 hacks per Sq ft)
4 Removal of projection, nails, wooden pieces etc
5 Leakage/seepage is observed
6 Electrical conduits are properly embedded in slab.
7 Thick dots done checked & found ok for level.
8 Dimensions checked & are as per Drawing.
9 Diagonal distances of rooms checked.

EXECUTION CHECK
1 Thickness of gypsum plaster maximum 15 mm, if thicknees is more base coat plaster to be done.
2 Right angle all corners.
3 Top finishing should be smooth.
4 Cleaning of all floor including corners up to virgin slab

POST EXECUTION CHECK


1 Undulations in the ceiling surface is observed
2 Right angle of the plaster found satisfactory
3 Cleaning of all floor including corners up to virgin slab
4 Proper groove to be maintained at the top of skirting.

COMPLIANCE REPORT:

Supervisor /Jr. Engineer / Sr. Engineer Project Manager


Name: Name:

QA/QC Engineer

Name: