PCC Checklist
Job Description Satisfactory ? Not Satisfactory ? Remarks
Formwork System
Cleanliness/Dressing
Rain Protection
Formwork Checklist
Job Description Satisfactory ? Not Satisfactory ? Remarks
Architectural Details
Formwork Dimensions
Formwork Alignment
Formwork Level
Plywood Surface:
→ Holes/Gaps Sealed
→ Cleanliness
Verticality
Bracing In Position
Scaffolding/Props/Spans
Pre-pour Checklist
Job Description Satisfactory ? Not Satisfactory ? Remarks
Architectural Details
Formwork Dimensions
Formwork Alignment
Formwork Level
Plywood Surface:
→ Holes/Gaps Sealed
→ Cleanliness
Verticality
Bracing In Position
Scaffolding/Props/Spans
Reinforcement Checklist
Job Description Satisfactory ? Not Satisfactory ? Remarks
"Inserts and embedments are in proper position as per drg and securely
tighed”
Cleanliness
Adequate Cover
Proper Anchorages
Rigidity
Possible To Vibrate
Job Description Satisfactory ? Not Satisfactory ? Remarks
Formwork System
Cleanliness
Rain Protection
→ Survey and setting out work checked. Plumb bob,line string, brick
axe,masons square available with masons
→ Horizontal and vertical joints for each layer filled fully and neatly with
cement mortar,Respected bond maintained through out the works.
→ Joint thickness is not more than specified limits and racked back up to
10mm on both side
→ Bricks laid with frog up and filled properly with cement mortar
→ The walls taken up truly in line level and plumb and the openings kept
as per drawing
→ All pipe fittings and specials, spouts,holdfasts and other fixtures which
are required to be built into the walls embeded properly.
→ Height of the lift for each days work was checked and maintained.
Plastering Checklist
Job Description Satisfactory ? Not Satisfactory ? Remarks
→ All the surfaces were sprinkled with water before plastering and
approved bonding agent applied on concrete surface.