PCC Checklist
Job Description Satisfactory ? Not Satisfactory ? Remarks

P.C.C. Invert Level

Formwork System

Construction/Expansion Joint Location

Cleanliness/Dressing

Lighting Arrangement at night

Rain Protection

Concrete Pouring Sequence

Concreting Manpower Availability

Equipment In Working Condition

Concrete Ordered In Advance (For RMC)

Access To Concreting Site Proper

Slump cone available?

Grade of Concrete ( N/mm2)


Job Description Satisfactory ? Not Satisfactory ? Remarks

Slump Required ( mm)

Others (Pls Specify)

Formwork Checklist
Job Description Satisfactory ? Not Satisfactory ? Remarks

Architectural Details

Formwork Dimensions

Formwork Alignment

Formwork Level

Plywood Surface:

→ Mold Oil Applied

→ Holes/Gaps Sealed

→ Cleanliness

Verticality

Form Ties In Position

Form Ties Fastened

Bracing In Position

Rigidity Of Joints Between Panels

Timber Members In Good Condition

Steel Members Properly Welded/Bolted

Member Sizes And Positions According To Design


Job Description Satisfactory ? Not Satisfactory ? Remarks

Scaffolding/Props/Spans

Construction/Expansion Joint Details

Electrical Conduits In Place

Openings For Services In Place

Pre-pour Checklist
Job Description Satisfactory ? Not Satisfactory ? Remarks

Architectural Details

Formwork Dimensions

Formwork Alignment

Formwork Level

Plywood Surface:

→ Mold Oil Applied

→ Holes/Gaps Sealed

→ Cleanliness

Verticality

Form Ties In Position

Form Ties Fastened

Bracing In Position

Rigidity Of Joints Between Panels

Timber Members In Good Condition

Steel Members Properly Welded/Bolted


Job Description Satisfactory ? Not Satisfactory ? Remarks

Member Sizes And Positions According To Design

Scaffolding/Props/Spans

Construction/Expansion Joint Details

Electrical Conduits In Place

Openings For Services In Place

Reinforcement Checklist
Job Description Satisfactory ? Not Satisfactory ? Remarks

Rebar Type Correct

Rebar Diameter Correct

Rebar Numbers And Spacing Correct

Bars Tied Properly/Welded

"Inserts and embedments are in proper position as per drg and securely
tighed”

Cleanliness

Adequate Cover

Proper Anchorages

Lap Lengths Correct

Location Of Laps Correct

Proper Links And Stirrups

Binding wire not in cover zone

Rigidity

Possible To Vibrate
Job Description Satisfactory ? Not Satisfactory ? Remarks

Extra / Additional Bars Provided ( If Yes, Provide Details)

Plum Concrete Checklist


Job Description Satisfactory ? Not Satisfactory ? Remarks

Plum Invert Level

Formwork System

Construction/Expansion Joint Location

Cleanliness

Lighting Arrangement at night

Rain Protection

Concrete Pouring Sequence

Concreting Manpower Availability

Equipment In Working Condition

"Concrete Ordered In Advance (For RMC)”

Access To Concreting Site Proper Slump cone available

Slump cone available

Grade of Concrete ( N/mm2)

Slump Required ( mm)

Others (Pls Specify)

Brick Work Checklist


Job Description Satisfactory ? Not Satisfactory ? Remarks
Job Description Satisfactory ? Not Satisfactory ? Remarks

Checks Before Start Of Brick Work

→ Was the Materials to be used in Brick/Block Work was Tested and


Approved

→ All the bricks are fully socked in water before use.

→ Survey and setting out work checked. Plumb bob,line string, brick
axe,masons square available with masons

→ Mechanical Mixer and Marked Measuring Boxes avilable.

→ Surface over which brickwork is to be done has been cleaned,Bed of


cement mortar for first layer was prepared.

→ Horizontal and vertical joints for each layer filled fully and neatly with
cement mortar,Respected bond maintained through out the works.

→ Joint thickness is not more than specified limits and racked back up to
10mm on both side

→ Bricks laid with frog up and filled properly with cement mortar

→ Continuity of vertical joints in the masonary avoided

→ Proportion of cement mortar,bulkage of sand checked ,adjusted &


recorded.

→ The walls taken up truly in line level and plumb and the openings kept
as per drawing

→ All pipe fittings and specials, spouts,holdfasts and other fixtures which
are required to be built into the walls embeded properly.

→ Height of the lift for each days work was checked and maintained.

→ Curing Done for 7 days and satisfactory

Plastering Checklist
Job Description Satisfactory ? Not Satisfactory ? Remarks

Checks Before Start Of Brick Work

→ Was the Materials to be used in plastering Tested and Approved

→ Surface over which plastering is to be done has been cleaned.

→ All concrete surfaces were hacked properly before plastering

→ All the surfaces were sprinkled with water before plastering and
approved bonding agent applied on concrete surface.

Checks ( During Plastering )

→ Scaffolding work checked.

→ Thiyyas / level dots were checked for thickness.

→ Proportion of cement mortar,bulkage of sand checked.

→ Thickness, line,level and plumb of plastered surface were checked.

→ Adhesives if any were checked for proportion

→ Chicken mesh at vertical and horizontal joints of R.C.C. and masonary


were checked.

→ Scaffolding holes were filled properly and checked.

→ Curing work after sufficient hardening of plastered surface were done


and checked.