STONE Stockyard (m3) ROAD WITHOUT STONE DAILY PROGRESS Resheeting (m3)
SHEETING
Other
NEXT DELIVERY
DATE Road ready Metres road Stone delivery (m3) Metres sheeting Weather/ Rainfall Volume Needs REMARK
Total required (m3) On site Remain Volume Metres Tawan Port (from Dump to (est.)/m3
Sikui not ready Location (m3)
by design (m3) (m3) (m3) (m) Jaya LCT) Stockyard
Metres Location (m) By LCT By Truck Target Actual Location (m3)
44,880 2,934
05/07/2023 25,070 19,810 3,014 1,224
06/07/2023 25,070 19,810 20,391 3,014 1,224
07/07/2023 25,236 19,644 19,925 20,530 3,041 1,224 3,000 21,470 166 139 27 1,046 maintain village road
08/07/2023 25,543 19,337 19,925 20,530 3,348 1,224 3,000 STA 06+500 to 08+930; STA 30+300 to 30+870 21,470 307 - - 307 500 -
STA 30+300 to 30+500;
09/07/2023 26,044 18,836 20,343 20,900 3,431 1,224 2,630 STA0 6+500 to 08+930; STA 30+500 to 30+700 21,470 501 500 370 83 - -
STA 30+700 to 30+870
10/07/2023 26,044 18,836 20,343 20,900 3,431 1,224 2,630 STA 06+500 to 08+930; STA 30+500 to 30+700 21,470 - - - - - 200 -
STA 06+500 to 08+000;
11/07/2023 26,763 18,117 21,896 22,700 3,431 - 390 2,030 STA 08+000 to 09+830; STA 30+500 to 30+700 20,270 390 330 500 1,800 390 -
STA 30+000 to 30+300
12/07/2023 26,934 17,946 21,994 22,800 3,505 - 390 2,030 STA 08+000 to 09+830; STA 30+500 to 30+700 20,170 - 171 500 100 STA 29+900 to 30+000 74 - -
STA 08+000 to 09+830; STA 29+400 to 29+900;
13/07/2023 26,934 17,946 21,994 22,800 3,505 - 390 2,530 19,670 - - 500 - - - - -
STA 30+500 to 30+700
STA 08+000 to 10+500; STA 11+650 to 11+800; Rain: 08.30-09:00 ; 20:30-
14/07/2023 27,171 17,709 21,994 22,800 3,505 237 390 3,350 18,850 - 237 500 - - 237 -
STA 29+400 to 29+900; STA 30+500 to 30+700 24:00 ; R/F:= 98mm
STA 09+200 to 10+500; STA 21+300 to 21+400; STA 08+250 to 08+300; 132 m3 Stockyard Sikui,
22/07/2023 29,493 15,387 22,989 24,800 3,305 163 - 3,970 STA 22+600 to 23+200; STA 26+000 to 27+050; 16,230 - 487 500 750 STA 08+900 to 09+200; 163 good 132.80 ReSheeting at STA 29+900
STA 29+400 to 29+900; STA 30+500 to 30+920 STA 12+000 to 12+400 to STA 37+900
Total Progress Surfacing AGU existing with stone PLAN STONE SHEETING
STA Panjang Jalan STA Panjang Jalan 30-Jul 13+100 -13+800
00+000 s/d 11+075 11,075 m 22+600 to 22+750 150 m 31-Jul 13+800 - 14+500
11+100 s/d 13+100 2,000 m 24+000 to 24+100 100 m 1-Aug 20+000 -20+700
27+200 s/d 28+550 1,350 m 2-Aug 20+700 - 21+400
29+200 s/d 29+300 100 m 3-Aug 21+400 - 22+100
29+500 s/d 29+700 200 m Total 250 m 4-Aug 22+100 - 22+800
29+900 S/d 30+870 970 m Tawan Jaya Sikui
30+920 s/d 35+550 4,630 m
35+800 s/d 45+000 9,200 m
TOTAL 29,525 m