You are on page 1of 1

STONE

STONE Stockyard (m3) ROAD WITHOUT STONE DAILY PROGRESS Resheeting (m3)
SHEETING
Other
NEXT DELIVERY
DATE Road ready Metres road Stone delivery (m3) Metres sheeting Weather/ Rainfall Volume Needs REMARK
Total required (m3) On site Remain Volume Metres Tawan Port (from Dump to (est.)/m3
Sikui not ready Location (m3)
by design (m3) (m3) (m3) (m) Jaya LCT) Stockyard
Metres Location (m) By LCT By Truck Target Actual Location (m3)

44,880 2,934
05/07/2023 25,070 19,810 3,014 1,224
06/07/2023 25,070 19,810 20,391 3,014 1,224
07/07/2023 25,236 19,644 19,925 20,530 3,041 1,224 3,000 21,470 166 139 27 1,046 maintain village road
08/07/2023 25,543 19,337 19,925 20,530 3,348 1,224 3,000 STA 06+500 to 08+930; STA 30+300 to 30+870 21,470 307 - - 307 500 -
STA 30+300 to 30+500;
09/07/2023 26,044 18,836 20,343 20,900 3,431 1,224 2,630 STA0 6+500 to 08+930; STA 30+500 to 30+700 21,470 501 500 370 83 - -
STA 30+700 to 30+870
10/07/2023 26,044 18,836 20,343 20,900 3,431 1,224 2,630 STA 06+500 to 08+930; STA 30+500 to 30+700 21,470 - - - - - 200 -
STA 06+500 to 08+000;
11/07/2023 26,763 18,117 21,896 22,700 3,431 - 390 2,030 STA 08+000 to 09+830; STA 30+500 to 30+700 20,270 390 330 500 1,800 390 -
STA 30+000 to 30+300
12/07/2023 26,934 17,946 21,994 22,800 3,505 - 390 2,030 STA 08+000 to 09+830; STA 30+500 to 30+700 20,170 - 171 500 100 STA 29+900 to 30+000 74 - -
STA 08+000 to 09+830; STA 29+400 to 29+900;
13/07/2023 26,934 17,946 21,994 22,800 3,505 - 390 2,530 19,670 - - 500 - - - - -
STA 30+500 to 30+700
STA 08+000 to 10+500; STA 11+650 to 11+800; Rain: 08.30-09:00 ; 20:30-
14/07/2023 27,171 17,709 21,994 22,800 3,505 237 390 3,350 18,850 - 237 500 - - 237 -
STA 29+400 to 29+900; STA 30+500 to 30+700 24:00 ; R/F:= 98mm

STA 08+000 to 08+575; STA 08+775 to 10+500;


Rain: 03.25-04:00 ;
15/07/2023 27,477 17,403 22,157 23,000 3,505 142 390 3,150 STA 11+650 to 11+800; STA 29+400 to 29+900; 18,850 - 306 800 200 STA 08+575 to 08+775 142 -
R/F:= 12mm
STA 30+500 to 30+700

STA 08+000 to 08+575; STA 08+775 to 10+500;


STA 11+650 to 11+700; STA 21+300 to 21+400; STA 08+450 to 08+575
16/07/2023 27,743 17,137 22,207 23,325 3,721 - - 5,020 16,655 - 266 325 216 257 good -
STA 22+600 to 23+200; STA 26+000 to 27+050; STA 11+700 to 11+900
STA 29+400 to 29+900; STA 30+500 to 30+920

STA 08+000 to 08+575; STA 08+775 to 10+500;


STA 21+300 to 21+400; STA 22+600 to 23+200; 102.1 m3 ReSheeting
17/07/2023 28,142 16,738 22,440 23,425 3,721 166 - 4,970 16,605 - 399 500 100 STA 11+600 to 11+700 166 good 102.10
STA 26+000 to 27+050; STA 29+400 to 29+900; STA 32
STA 30+500 to 30+920
STA 08+000 to 08+575; STA 08+775 to 10+500;
STA 21+300 to 21+400; STA 22+600 to 23+200; 41 V19m3 ReSheeting at
18/07/2023 28,196 16,684 22,493 23,525 3,721 166 - 4,970 16,505 - 54 500 100 STA 11+900 to 12+000 - 504 good 41.03
STA 26+000 to 27+050; STA 29+400 to 29+900; STA 32
STA 30+500 to 30+920

STA 08+000 to 08+300; STA 08+775 to 10+500;


STA 21+300 to 21+400; STA 22+600 to 23+200; 61 m3 Stockyard sikui , at
19/07/2023 28,368 16,512 22,666 23,675 3,660 60 - 4,695 16,630 - 172 500 150 STA 08+300 to 08+450 - good 61.60
STA 26+000 to 27+050; STA 29+400 to 29+900; STA 32 & STA 42
STA 30+500 to 30+920

STA 08+125 to 08+300; STA 08+900 to 10+500; 162 m3 Stockyard Sikui,


STA 21+300 to 21+400; STA 22+600 to 23+200; STA 08+000 to 08+125; rain 11.00 pm - 02.00 ReSheeting at STA 32,
20/07/2023 28,693 16,187 22,666 23,925 3,497 325 - 4,445 16,630 - 325 500 250 325 162.40
STA 26+000 to 27+050; STA 29+400 to 29+900; STA 08+775 to 08+900 am STA 42 and STA 44. R/F=
STA 30+500 to 30+920 26

STA 08+250 to 08+300; STA 08+900 to 10+500;


67 m3 Stockyard Sikui,
STA 21+300 to 21+400; STA 22+600 to 23+200; rain 02.17-03.00 pm ;
21/07/2023 29,006 15,874 22,666 24,050 3,430 - - 4,320 16,630 - 314 500 125 STA 08+125 to 08+250 314 67.20 ReSheeting at STA 39 to
STA 26+000 to 27+050; STA 29+400 to 29+900; 09.00 pm-02.00 am
STA 43. R/F = 20mm
STA 30+500 to 30+920

STA 09+200 to 10+500; STA 21+300 to 21+400; STA 08+250 to 08+300; 132 m3 Stockyard Sikui,
22/07/2023 29,493 15,387 22,989 24,800 3,305 163 - 3,970 STA 22+600 to 23+200; STA 26+000 to 27+050; 16,230 - 487 500 750 STA 08+900 to 09+200; 163 good 132.80 ReSheeting at STA 29+900
STA 29+400 to 29+900; STA 30+500 to 30+920 STA 12+000 to 12+400 to STA 37+900

STA 10+000 to 10+500; STA 21+300 to 21+400; 53 m3 Stockyard Sikui,


23/07/2023 29,991 14,889 23,487 25,600 3,251 - - 3,170 STA 22+600 to 23+200; STA 26+000 to 27+050; 16,230 - 498 500 800 STA 09+200 to 10+000 - good 53.76 ReSheeting at STA 42 to
STA 29+400 to 29+900; STA 30+500 to 30+920 STA 43

STA 10+075 to 10+500; STA 21+300 to 21+400; 13 m3 Stockyard Sikui,


STA 10+000 to 10+075;
24/07/2023 30,729 14,151 23,515 25,775 3,220 - 355 3,095 STA 22+600 to 23+200; STA 26+000 to 27+050; 16,130 355 383 500 175 355 good 13.44 ReSheeting at STA 36 to
STA 29+200 to 29+300
STA 29+400 to 29+900; STA 30+500 to 30+920 STA 38

STA 21+300 to 21+400; STA 22+750 to 23+200; 116 m3 Stockyard Sikui,


25/07/2023 30,992 13,888 23,778 26,775 3,103 - - 2,520 STA 26+000 to 27+050; STA 29+400 to 29+900; 15,455 - 263 500 1,000 STA 10+075 to 11+075 - good 116.48 ReSheeting at STA 36 to
STA 30+500 to 30+920 STA 38

STA 21+300 to 21+400; STA 22+750 to 23+200; 76 m3 Stockyard Sikui,


STA 12+400 to 12+600;
26/07/2023 31,119 13,761 23,867 27,175 3,027 38 - 3,270 STA 26+000 to 28+000; STA 29+400 to 29+500; 14,555 - 127 500 400 38 good 76.16 ReSheeting at STA 38 to
STA 29+500 to 29+700
STA 29+700 to 29+900; STA 30+500 to 30+920 STA 40
STA 21+300 to 21+400; STA 22+750 to 23+200;
STA 26+000 to 28+000; STA29+000 to 29+200;
27/07/2023 31,456 13,424 23,950 27,475 3,275 5 - 3,570 13,955 - 337 500 300 STA 11+100 to 11+400 254 good - - -
STA 29+300 to 29+500; STA 29+700 to 29+900;
STA 30+500 to 30+920
STA 12+600 to 13+000;STA 20+000 to 21+400;
STA 22+750 to 23+200; STA 26+000 to 28+000; 80 m3 Stockyard Sikui,
28/07/2023 31,745 13,135 23,950 27,475 3,339 145 - 5,470 12,055 289 500 - - 289 good 81 -
STA29+000 to 29+200; STA 29+300 to 29+500; ReSheeting at STA 37
STA 29+700 to 29+900; STA 30+500 to 30+920
58 m3 H.Heru, Sheeting
STA 20+000 to 21+400; STA 22+750 to 23+200;
Emergency Bridge at STA
STA 26+000 to 28+000; STA29+000 to 29+200; STA 12+600 to 13+100;
29/07/2023 32,533 12,347 24,298 28,175 3,780 - - 4,870 11,955 - 788 500 700 440 good 205 43+200; 146 m3 H. Heru -
STA 29+300 to 29+500; STA 29+700 to 29+900; STA 28+350 to 28+550
ReSheeting at STA 43 to
STA 30+500 to 30+920
45
STA 20+000 to 21+400; STA 22+750 to 23+200; 56 m3 H.Heru, Sheeting
STA 26+000 to 28+000; STA28+550 to 29+200; STA 11+400 to 11+600; Emergency Bridge at STA
30/07/2023 33,097 11,783 24,833 28,725 3,808 - - 4,950 11,075 564 550 29 good 92 -
STA 29+300 to 29+500; STA 29+700 to 29+900; STA 28+000 to 28+350 43+200; 35 m3 H. Heru
STA 30+870 to 30+920 ReSheeting at STA 40
STA 20+000 to 21+400; STA 22+750 to 23+200;
STA 26+000 to 27+200; STA28+550 to 29+200; 29 m3 H.Heru,
31/07/2023 33,686 11,194 25,415 29,525 3,816 - - 4,150 11,075 590 800 STA 27+200 to 28+000 7 good 248 -
STA 29+300 to 29+500; STA 29+700 to 29+900; reSheeting STA 38 to 40;
STA 30+870 to 30+920

Total Progress Surfacing AGU existing with stone PLAN STONE SHEETING
STA Panjang Jalan STA Panjang Jalan 30-Jul 13+100 -13+800
00+000 s/d 11+075 11,075 m 22+600 to 22+750 150 m 31-Jul 13+800 - 14+500
11+100 s/d 13+100 2,000 m 24+000 to 24+100 100 m 1-Aug 20+000 -20+700
27+200 s/d 28+550 1,350 m 2-Aug 20+700 - 21+400
29+200 s/d 29+300 100 m 3-Aug 21+400 - 22+100
29+500 s/d 29+700 200 m Total 250 m 4-Aug 22+100 - 22+800
29+900 S/d 30+870 970 m Tawan Jaya Sikui
30+920 s/d 35+550 4,630 m
35+800 s/d 45+000 9,200 m
TOTAL 29,525 m