CONSTRUCTION SCHEDULE AND S-CURVE

Project : Proposed Two-Storey Residential Building


Location :
150 CALENDAR DAYS
1st Month 2nd Month 3rd month 4th Month 5th Month
Item DESCRIPTION
1 6 12 18 24 30 36 42 48 54 60 66 72 78 84 90 96 102 108 114 120 126 132 138 144 150
I. MOBILIZATION
II. CLEAN and GRUBBING
III. EARTHWORKS ( FOUNDATION)
IV. CONCRETE WORKS/FORMWORKS/RSB
A. FOUNDATION
B. COLUMN
C. 2F SLAB,STAIRS
D. 2F COLUMN
E. ROOF BEAM
V. MASONRY WORKS
A. CHB LAYING (GF)
B. CHB LAYING (2F)
C. PLASTERING (INTERIOR & EXTERIOR)
D. TILNG
VI. STEEL WORKS
A. ROOF FRAMINGS
B. ROOFING
VII. CARPENTRY WORKS
A. DOOR and DOOR JAMBS
B. CEILING
C. CABINETS
VIII. ELECTRICAL WORKS
IX. PLUMBING WORKS
X. PAINTING WORKS
XI. DEMOBILIZATION/GENERAL CLEANING

Submitted By:

Daniela G. Sales