PERSPECTIVE
TABLE OF CONTENTS
CROSS SECTION
LONGITUDINAL SECTION
FRONT ELEVATION
LAND USE AND ZONING
RIGHT SIDE ELEVATION
REAR ELEVATION
STRUCTURAL
1 VICINITY MAP LINE AND GRADE
A-1 SCALE NTS
S-1 GROUND FLOOR FRAMING PLAN
WM
LAUNDRY POWDER
ROOM ROOM ELECTRICAL
KITCHEN
UP
MW
E-1 GF LIGHTING LAYOUT PLAN
REF
DINING
AREA GF POWER LAYOUT PLAN STRUCTURAL
UP
GENERAL NOTES & LEGENDS
PORCH
UP SANITARY
PLUMBING
RAMP UP
SIDEWALK
3 PERSPECTIVE
A-1 SCALE NTS
P-1 GF SEWER LINE LAYOUT PLAN
REG. NO. :
TIN :
UNIT 106 RENOVATION
106 CRYSTAL HOMES 2, GUITNANG BAYAN II, SAN MATEO, RIZAL
AS SHOWN CHECKED BY:
DATE:
ELSA LIEZL G. ONITA
A-1
FD MOP FD
SINK
WM
LAUNDRY POWDER
ROOM ROOM
KITCHEN
MW
UP FD
FD
REF
COMMON T&B TOP OF FIRE WALL 7.20 M TOP OF FIRE WALL 7.20 M
GUEST ROOM
LANAI UP ROOF APEX 6.90 M ROOF APEX 6.90 M
DINING
AREA A ROOF BEAM FINISH LINE 5.90 M ROOF BEAM FINISH LINE 5.90 M
HALLWAY
FD
TERRACE MASTER'S DN
T&B COMMON T&B GUEST ROOM
TERRACE
LIVING AREA
2F FINISHED FLOOR LINE 3.20 M 2F FINISHED FLOOR LINE 3.20 M
ROOF LINE
CARPORT ENTRY
MASTER'S
WALK- BEDROOM
IN
GF FINISHED CEILING LINE 2.90 M GF FINISHED CEILING LINE 2.90 M
UP
CLOSET
PORCH
FD LAUNDRY DINING
SECOND FLOOR LINE
UP
ROOM AREA
ROOF LINE
RAMP UP
TOP OF FIRE WALL 7.20 M TOP OF FIRE WALL 7.20 M TOP OF FIRE WALL 7.20 M TOP OF FIRE WALL 7.20 M
ROOF APEX 6.90 M ROOF APEX 6.90 M ROOF APEX 6.90 M ROOF APEX 6.90 M
ROOF BEAM FINISH LINE 5.90 M ROOF BEAM FINISH LINE 5.90 M ROOF BEAM FINISH LINE 5.90 M ROOF BEAM FINISH LINE 5.90 M
2F FINISHED FLOOR LINE 3.20 M 2F FINISHED FLOOR LINE 3.20 M 2F FINISHED FLOOR LINE 3.20 M 2F FINISHED FLOOR LINE 3.20 M
GF FINISHED CEILING LINE 2.90 M GF FINISHED CEILING LINE 2.90 M GF FINISHED CEILING LINE 2.90 M GF FINISHED CEILING LINE 2.90 M
GF FINISHED FLOOR LINE 0.20 M GF FINISHED FLOOR LINE 0.20 M GF FINISHED FLOOR LINE 0.20 M GF FINISHED FLOOR LINE 0.20 M
5 FRONT ELEVATION 6 RIGHT SIDE ELEVATION 7 REAR ELEVATION 8 LEFT SIDE ELEVATION
A-2 SCALE 1:100 A-2 SCALE 1:100 A-2 SCALE 1:100 A-2 SCALE 1:100
PROJECT TITLE & LOCATION: SHEET CONTENTS : DESIGNED BY: REVISIONS: PROJECT OWNER: SHEET NO. :
DRAWN BY:
REG. NO. :
TIN :
UNIT 106 RENOVATION
106 CRYSTAL HOMES 2, GUITNANG BAYAN II, SAN MATEO, RIZAL
AS SHOWN CHECKED BY:
DATE:
ELSA LIEZL G. ONITA A-2
2 X 3 PURLINS
SPACED @ 0.60m O.C.
W/ 10mm Ø SAGROD
B2
RB RB RB
SLAB SLAB SLAB
B2
B2
B2
B2
RB
RB
RB
RB
ON FILL ON FILL ON FILL
B1 B1 B1 RAFTER
B2 B2 RB
B2
S-2 S-2
SLAB
B1
B1
ON FILL SLAB ON FILL
RB
B1 B1
B1 B1
RB
B1
B2
B2
S-2 S-2
RAFTER
B1
B1
SLAB ON FILL SLAB ON FILL B1
RB
B1 S-2
B2
B1 S-2
S-2
B2 B2 RB
RAFTER
1 GROUND FLOOR FRAMING PLAN 2 SECOND FLOOR FRAMING PLAN 3 ROOF FRAMING PLAN
S-1 SCALE 1:100 S-2 SCALE 1:100 S-3 SCALE 1:100
3 - 16mm Ø 2 - 16mm Ø
2 - 16mm Ø 2 - 16mm Ø
4 - 16mm Ø 2 - 16mm Ø
4 - 16mm Ø
2 - 16mm Ø 10mm Ø MAIN BARS
@ 120mm O.C.
@ SUPPORT @ MIDSPAN
TWO WAY S-2
4 BEAM DETAIL SCHEDULE 5 CONCRETE SLAB DETAIL
S-1 SCALE 1:10 S-1 SCALE 1:10
PROJECT TITLE & LOCATION: SHEET CONTENTS : DESIGNED BY: REVISIONS: PROJECT OWNER: SHEET NO. :
DRAWN BY:
REG. NO. :
TIN :
UNIT 106 RENOVATION
106 CRYSTAL HOMES 2, GUITNANG BAYAN II, SAN MATEO, RIZAL
AS SHOWN CHECKED BY:
DATE:
ELSA LIEZL G. ONITA
S-1
MOP
SINK
MOP
SINK
LEGEND AND SYMBOL
WM WM
Si 100mm dia. PLASTIC RECEPTACLE WITH 11WATTS
j 3
i
h WP COMPACT FLUORESCENT LAMP 240V
s
Sghk 6
LPP 4
Ss r DITTO, BUT WEATHER PROOF
k f UP UP
WP
ONE SINGLE POLE SWITCH IN ONE GANG PLATE 16A,
t q Sr
Sa 240V WITH MOUNTING BRACKET & PLATE COVER,
ROYU
Sdef
Stu
m
5 Sb,c TWO SINGLE POLE SWITCH IN TWO GANG PLATE
16A, 240V, ROYU
DN l DN LPP
1
p
Slmq LIGHTING AND POWER PANEL BOARD
e
Sno
a b Sp
u CIRCUIT HOMERUN
d
WP
Sabc 2 n
c
o
7
M KILOWATT HOUR METER
CIRCUIT BREAKER
SERVICE ENTRANCE
GENERAL NOTES:
ALL ELECTRICAL WORKS HEREIN INCLUDED SHALL BE EXECUTED IN
2 - 22mm2 THHN WIRE
ACCORDANCE WITH THE PROVISION OF THE LATEST EDITION OF
IN RSC PIPE # 25mm Ø
THE PHILIPPINE ELECTRICAL CODE, THE RULES AND REGULATIONS
OF THE LOCALITY AND THE REQUIREMENTS OF THE UTILITY POWER
CKT LOAD
VOLTS WATTS AMPS
CIRCUIT HOME RUN BREAKER RATING M COMPANY.
NO. DESCRIPTION SIZE OF WIRE SIZE OF CONDUIT AF AT POLE
ALL ELECTRICAL WORKS HEREIN INCLUDES SHALL BE EXECUTED
2
1 11 LIGHT OUTLET 230 700 3.04 2 - 3.5mm THW 15mm Ø PVC 50 15AT 2P BY EXPERIENCED MEN UNDER THE DIRECT SUPERVISION OF A FULL
2 10 LIGHT OUTLET 230 800 3.48 2 - 3.5mm2 THW 15mm Ø PVC 50 15AT 2P TIME LICENSED ELECTRICAL ENGINEER. WORKS SHALL BE NEATLY
PLACED, SECURELY FASTENED AND PROPERLY FINISHED.
3 6 CONV. OUTLET 230 1200 5.22 2 - 3.5mm2 THW 15mm Ø PVC 50 15AT 2P
4 8 CONV. OUTLET 230 1400 6.09 2 - 3.5mm2 THW 15mm Ø PVC 50 15AT 2P POWER SERVICE SHALL BE 230VAC, THREE PHASE,
3-WIRE+GROUND 50HZ VIA NEAREST DISTRIBUTION TRANSFORMER.
5 2 HEATER - SHOWER 230 13800 60.0 2 - 8.0mm2 THW 25mm Ø PVC 150 60AT 2P
6 REFRIGERATOR 230 200 0.87 2 - 3.5mm2 THW 15mm Ø PVC 50 15AT 2P MATERIALS SHALL BE NEW AND SHALL CONFORM WITH THE
1 2 STANDARD AMERICAN UNDERWRITE'S LABORATORIES. INC., AND
2 2P
7 1 HP - ACU 230 950 4.13 2 - 3.5mm THW 15mm Ø PVC 50 15AT
EVERY CASE WERE SUCH STANDARDS HAS BEEN ESTABLISHED
3 4
8 SPARE 230 800 3.48 2 - 3.5mm2 THW 15mm Ø PVC 50 15AT 2P FOR THE PARTICULAR TYPE OF MATERIAL IN QUESTION.
19850 86.31 5 6
ALL CONDUITS, INCLUDING FEEDER LINES AND SERVICE ENTRANCE
7 8 SHALL BE OF INTERMEDIATE METALLIC CONDUIT OF HIGH
USED: 2 - 22mm2 THHN IN 25mm Ø RSC PIPE
I TOTAL = 86.31 (0.80) D.F. = 69.05 AMPS MAIN: 100AT
STRENGTH AND GALVANIZED WITH AN ADDITIONAL INTERIOR
PROTECTIVE COATING SHALL BE USED OR AS INDICATED IN THE
PLANS.
5 SCHEDULE OF LOAD AND COMPUTATION 6 RISER DIAGRAM ELECTRICAL TRADE SIZE SHALL BE USED, A MINIMUM OF 15mm
E-1 E-1 diameter FOR CONDUITS AND IN NO CASE SHALL THERE BE MORE
THAN THE EQUIVALENT OF FOUR QUARTER BENDS IN ANY ONE RUN.
PROJECT TITLE & LOCATION: SHEET CONTENTS : DESIGNED BY: REVISIONS: PROJECT OWNER: SHEET NO. :
DRAWN BY:
REG. NO. :
TIN :
UNIT 106 RENOVATION
106 CRYSTAL HOMES 2, GUITNANG BAYAN II, SAN MATEO, RIZAL
AS SHOWN CHECKED BY:
DATE:
ELSA LIEZL G. ONITA E-1
MOP CO FD MOP
FD
CO
SINK CO
SINK F F
WM WM
12.50mm Ø PVC
DOWN TO
FIRST CO SHO
DOWN TO FLOOR
FD DOWNSPOUT FD
100mm Ø PVC WP
UP UP
12.50mm Ø PVC
DOWN TO
FIRST FLOOR
F
SHO
FD
DN DN
CO
CWL
SEPTIC
TANK
DOWN TO
FD DOWNSPOUT
GV
WM
LEGEND
WATER CLOSET WP WATER CLOSET
WM
LAVATORY WATER METER
GV
KITCHEN SINK GATE VALVE
FD FLOOR DRAIN CO CLEAN OUT
LAUNDRY POWDER
ROOM ROOM SHO SHOWER CATCH BASIN
KITCHEN
DS DS
F FAUCET MH MANHOLE
DS
CB
COMMON T&B
LANAI UP
GUEST ROOM DP DRAINAGE PIPE CWL COLD WATER LINE
DINING
AREA
DP
CB
CARPORT DS MASTER'S
OF THE LOCAL WATERWORKS AUTHORITY.
DS
WALK- BEDROOM
DS
IN
CLOSET
PORCH
PIPES SHALL BE INSTALLED AS LOCATED IN THE WORKING DRAWING. ANY
ROOF LINE
RELOCATION REQUIRED FOR PROPER EXECUTION OF OTHER TRADES
SHALL BE UPON THE APPROVAL OF THE MASTER PLUMBER.
PROJECT TITLE & LOCATION: SHEET CONTENTS : DESIGNED BY: REVISIONS: PROJECT OWNER: SHEET NO. :
DRAWN BY:
UNIT 106 RENOVATION
REG. NO. :
TIN :
106 CRYSTAL HOMES 2, GUITNANG BAYAN II, SAN MATEO, RIZAL
AS SHOWN CHECKED BY:
DATE:
ELSA LIEZL G. ONITA
P-1