You are on page 1of 5

REPUBLIC OF THE PHILIPPINES

TABLE OF CONTENTS DEPARTMENT OF PUBLIC WORKS


ARCHITECTURAL TRANSPORTATION AND COMMUNICATION

A-1 VICINITY MAP OFFICE OF THE BUILDING OFFICIAL

SITE SITE DEVELOPMENT PLAN

PERSPECTIVE

TABLE OF CONTENTS

DISTRICT / MUNICIPAL / CITY


A-2 GROUND FLOOR PLAN

SECOND FLOOR PLAN

CROSS SECTION

LONGITUDINAL SECTION

FRONT ELEVATION
LAND USE AND ZONING
RIGHT SIDE ELEVATION

REAR ELEVATION

LEFT SIDE ELEVATION

STRUCTURAL
1 VICINITY MAP LINE AND GRADE
A-1 SCALE NTS
S-1 GROUND FLOOR FRAMING PLAN

SECOND FLOOR FRAMING PLAN

ROOF FRAMING PLAN

BEAM DETAIL SCHEDULE

CONCRETE SLAB DETAIL ARCHITECTURAL


FD MOP FD
SINK

WM
LAUNDRY POWDER
ROOM ROOM ELECTRICAL
KITCHEN
UP
MW
E-1 GF LIGHTING LAYOUT PLAN
REF

2F LIGHTING LAYOUT PLAN


LANAI UP

DINING
AREA GF POWER LAYOUT PLAN STRUCTURAL

2F POWER LAYOUT PLAN

SCHEDULE OF LOAD & COMPUTATION


LIVING AREA
RISER DIAGRAM
CARPORT ENTRY

UP
GENERAL NOTES & LEGENDS
PORCH
UP SANITARY

PLUMBING
RAMP UP
SIDEWALK

3 PERSPECTIVE
A-1 SCALE NTS
P-1 GF SEWER LINE LAYOUT PLAN

2F SEWER LINE LAYOUT PLAN

GF WATER LINE LAYOUT PLAN


6.5 M RROW ELECTRICAL
2F WATER LINE LAYOUT PLAN

GF STORM DRAINAGE LAYOUT

2F STORM DRAINAGE LAYOUT

ROOF STORM DRAINAGE LAYOUT

2 SITE DEVELOPMENT PLAN GENERAL NOTES & LEGENDS


A-1 SCALE 1:100
MECHANICAL
PROJECT TITLE & LOCATION: SHEET CONTENTS : DESIGNED BY: REVISIONS: PROJECT OWNER: SHEET NO. :
DRAWN BY:

REG. NO. :
TIN :
UNIT 106 RENOVATION
106 CRYSTAL HOMES 2, GUITNANG BAYAN II, SAN MATEO, RIZAL
AS SHOWN CHECKED BY:
DATE:
ELSA LIEZL G. ONITA
A-1
FD MOP FD
SINK

WM
LAUNDRY POWDER
ROOM ROOM
KITCHEN
MW
UP FD
FD

REF
COMMON T&B TOP OF FIRE WALL 7.20 M TOP OF FIRE WALL 7.20 M
GUEST ROOM
LANAI UP ROOF APEX 6.90 M ROOF APEX 6.90 M
DINING
AREA A ROOF BEAM FINISH LINE 5.90 M ROOF BEAM FINISH LINE 5.90 M

HALLWAY
FD

TERRACE MASTER'S DN
T&B COMMON T&B GUEST ROOM
TERRACE
LIVING AREA
2F FINISHED FLOOR LINE 3.20 M 2F FINISHED FLOOR LINE 3.20 M

ROOF LINE
CARPORT ENTRY
MASTER'S
WALK- BEDROOM
IN
GF FINISHED CEILING LINE 2.90 M GF FINISHED CEILING LINE 2.90 M
UP

CLOSET
PORCH
FD LAUNDRY DINING
SECOND FLOOR LINE
UP
ROOM AREA
ROOF LINE

GF FINISHED FLOOR LINE 0.20 M GF FINISHED FLOOR LINE 0.20 M

RAMP UP

NGL 0.00 M NGL 0.00 M


B

3 CROSS SECTION THRU A 4 LONGITUDINAL SECTION THRU B


A-2 SCALE 1:100 A-2 SCALE 1:100
1 GROUND FLOOR PLAN 2 SECOND FLOOR PLAN
A-2 SCALE 1:100 A-2 SCALE 1:100

TOP OF FIRE WALL 7.20 M TOP OF FIRE WALL 7.20 M TOP OF FIRE WALL 7.20 M TOP OF FIRE WALL 7.20 M

ROOF APEX 6.90 M ROOF APEX 6.90 M ROOF APEX 6.90 M ROOF APEX 6.90 M

ROOF BEAM FINISH LINE 5.90 M ROOF BEAM FINISH LINE 5.90 M ROOF BEAM FINISH LINE 5.90 M ROOF BEAM FINISH LINE 5.90 M

2F FINISHED FLOOR LINE 3.20 M 2F FINISHED FLOOR LINE 3.20 M 2F FINISHED FLOOR LINE 3.20 M 2F FINISHED FLOOR LINE 3.20 M

GF FINISHED CEILING LINE 2.90 M GF FINISHED CEILING LINE 2.90 M GF FINISHED CEILING LINE 2.90 M GF FINISHED CEILING LINE 2.90 M

GF FINISHED FLOOR LINE 0.20 M GF FINISHED FLOOR LINE 0.20 M GF FINISHED FLOOR LINE 0.20 M GF FINISHED FLOOR LINE 0.20 M

NGL 0.00 M NGL 0.00 M NGL 0.00 M NGL 0.00 M

5 FRONT ELEVATION 6 RIGHT SIDE ELEVATION 7 REAR ELEVATION 8 LEFT SIDE ELEVATION
A-2 SCALE 1:100 A-2 SCALE 1:100 A-2 SCALE 1:100 A-2 SCALE 1:100

PROJECT TITLE & LOCATION: SHEET CONTENTS : DESIGNED BY: REVISIONS: PROJECT OWNER: SHEET NO. :
DRAWN BY:

REG. NO. :
TIN :
UNIT 106 RENOVATION
106 CRYSTAL HOMES 2, GUITNANG BAYAN II, SAN MATEO, RIZAL
AS SHOWN CHECKED BY:
DATE:
ELSA LIEZL G. ONITA A-2
2 X 3 PURLINS
SPACED @ 0.60m O.C.
W/ 10mm Ø SAGROD

B2
RB RB RB
SLAB SLAB SLAB

B2

B2

B2

B2

RB

RB

RB

RB
ON FILL ON FILL ON FILL

B1 B1 B1 RAFTER
B2 B2 RB

B2
S-2 S-2
SLAB

B1

B1
ON FILL SLAB ON FILL

RB
B1 B1

B1 B1
RB

B1

B2
B2
S-2 S-2
RAFTER

B1

B1
SLAB ON FILL SLAB ON FILL B1

RB
B1 S-2

B2
B1 S-2

S-2
B2 B2 RB
RAFTER

1 GROUND FLOOR FRAMING PLAN 2 SECOND FLOOR FRAMING PLAN 3 ROOF FRAMING PLAN
S-1 SCALE 1:100 S-2 SCALE 1:100 S-3 SCALE 1:100

10mm Ø TEMPERATURE BARS


B1
@ 350mm O.C.

3 - 16mm Ø 2 - 16mm Ø

2 - 16mm Ø 2 - 16mm Ø

2 - 16mm Ø 3 - 16mm Ø 10mm Ø MAIN BARS


@ 120mm O.C.
@ SUPPORT @ MIDSPAN
ONE WAY S-1
B2 & RB
10mm Ø BARS @ 120mm O.C.

4 - 16mm Ø 2 - 16mm Ø

4 - 16mm Ø
2 - 16mm Ø 10mm Ø MAIN BARS
@ 120mm O.C.
@ SUPPORT @ MIDSPAN
TWO WAY S-2
4 BEAM DETAIL SCHEDULE 5 CONCRETE SLAB DETAIL
S-1 SCALE 1:10 S-1 SCALE 1:10

PROJECT TITLE & LOCATION: SHEET CONTENTS : DESIGNED BY: REVISIONS: PROJECT OWNER: SHEET NO. :
DRAWN BY:

REG. NO. :
TIN :
UNIT 106 RENOVATION
106 CRYSTAL HOMES 2, GUITNANG BAYAN II, SAN MATEO, RIZAL
AS SHOWN CHECKED BY:
DATE:
ELSA LIEZL G. ONITA
S-1
MOP
SINK
MOP
SINK
LEGEND AND SYMBOL
WM WM
Si 100mm dia. PLASTIC RECEPTACLE WITH 11WATTS
j 3
i
h WP COMPACT FLUORESCENT LAMP 240V

Sj DUPLEX CONV. OUTLET, PARALLEL SLOT,


GROUNDING TYPE, 16A, 240V, CLASSIC, ROYU
g

s
Sghk 6
LPP 4
Ss r DITTO, BUT WEATHER PROOF
k f UP UP
WP
ONE SINGLE POLE SWITCH IN ONE GANG PLATE 16A,
t q Sr
Sa 240V WITH MOUNTING BRACKET & PLATE COVER,
ROYU

Sdef
Stu

m
5 Sb,c TWO SINGLE POLE SWITCH IN TWO GANG PLATE
16A, 240V, ROYU

DN l DN LPP
1
p
Slmq LIGHTING AND POWER PANEL BOARD
e

Sno
a b Sp
u CIRCUIT HOMERUN
d

WP

Sabc 2 n

c
o

7
M KILOWATT HOUR METER

SECOND FLOOR LINE

CIRCUIT BREAKER

SERVICE ENTRANCE

GROUND FLOOR SECOND FLOOR GROUND FLOOR SECOND FLOOR


1 LIGHTING LAYOUT PLAN 2 LIGHTING LAYOUT PLAN 3 POWER LAYOUT PLAN 4 POWER LAYOUT PLAN
E-1 SCALE 1:100 E-1 SCALE 1:100 E-1 SCALE 1:100 E-1 SCALE 1:100

GENERAL NOTES:
ALL ELECTRICAL WORKS HEREIN INCLUDED SHALL BE EXECUTED IN
2 - 22mm2 THHN WIRE
ACCORDANCE WITH THE PROVISION OF THE LATEST EDITION OF
IN RSC PIPE # 25mm Ø
THE PHILIPPINE ELECTRICAL CODE, THE RULES AND REGULATIONS
OF THE LOCALITY AND THE REQUIREMENTS OF THE UTILITY POWER
CKT LOAD
VOLTS WATTS AMPS
CIRCUIT HOME RUN BREAKER RATING M COMPANY.
NO. DESCRIPTION SIZE OF WIRE SIZE OF CONDUIT AF AT POLE
ALL ELECTRICAL WORKS HEREIN INCLUDES SHALL BE EXECUTED
2
1 11 LIGHT OUTLET 230 700 3.04 2 - 3.5mm THW 15mm Ø PVC 50 15AT 2P BY EXPERIENCED MEN UNDER THE DIRECT SUPERVISION OF A FULL
2 10 LIGHT OUTLET 230 800 3.48 2 - 3.5mm2 THW 15mm Ø PVC 50 15AT 2P TIME LICENSED ELECTRICAL ENGINEER. WORKS SHALL BE NEATLY
PLACED, SECURELY FASTENED AND PROPERLY FINISHED.
3 6 CONV. OUTLET 230 1200 5.22 2 - 3.5mm2 THW 15mm Ø PVC 50 15AT 2P

4 8 CONV. OUTLET 230 1400 6.09 2 - 3.5mm2 THW 15mm Ø PVC 50 15AT 2P POWER SERVICE SHALL BE 230VAC, THREE PHASE,
3-WIRE+GROUND 50HZ VIA NEAREST DISTRIBUTION TRANSFORMER.
5 2 HEATER - SHOWER 230 13800 60.0 2 - 8.0mm2 THW 25mm Ø PVC 150 60AT 2P

6 REFRIGERATOR 230 200 0.87 2 - 3.5mm2 THW 15mm Ø PVC 50 15AT 2P MATERIALS SHALL BE NEW AND SHALL CONFORM WITH THE
1 2 STANDARD AMERICAN UNDERWRITE'S LABORATORIES. INC., AND
2 2P
7 1 HP - ACU 230 950 4.13 2 - 3.5mm THW 15mm Ø PVC 50 15AT
EVERY CASE WERE SUCH STANDARDS HAS BEEN ESTABLISHED
3 4
8 SPARE 230 800 3.48 2 - 3.5mm2 THW 15mm Ø PVC 50 15AT 2P FOR THE PARTICULAR TYPE OF MATERIAL IN QUESTION.
19850 86.31 5 6
ALL CONDUITS, INCLUDING FEEDER LINES AND SERVICE ENTRANCE
7 8 SHALL BE OF INTERMEDIATE METALLIC CONDUIT OF HIGH
USED: 2 - 22mm2 THHN IN 25mm Ø RSC PIPE
I TOTAL = 86.31 (0.80) D.F. = 69.05 AMPS MAIN: 100AT
STRENGTH AND GALVANIZED WITH AN ADDITIONAL INTERIOR
PROTECTIVE COATING SHALL BE USED OR AS INDICATED IN THE
PLANS.

5 SCHEDULE OF LOAD AND COMPUTATION 6 RISER DIAGRAM ELECTRICAL TRADE SIZE SHALL BE USED, A MINIMUM OF 15mm
E-1 E-1 diameter FOR CONDUITS AND IN NO CASE SHALL THERE BE MORE
THAN THE EQUIVALENT OF FOUR QUARTER BENDS IN ANY ONE RUN.

PROJECT TITLE & LOCATION: SHEET CONTENTS : DESIGNED BY: REVISIONS: PROJECT OWNER: SHEET NO. :
DRAWN BY:

REG. NO. :
TIN :
UNIT 106 RENOVATION
106 CRYSTAL HOMES 2, GUITNANG BAYAN II, SAN MATEO, RIZAL
AS SHOWN CHECKED BY:
DATE:
ELSA LIEZL G. ONITA E-1
MOP CO FD MOP
FD

CO
SINK CO
SINK F F
WM WM

12.50mm Ø PVC
DOWN TO
FIRST CO SHO
DOWN TO FLOOR
FD DOWNSPOUT FD

100mm Ø PVC WP
UP UP

12.50mm Ø PVC

DOWN TO
FIRST FLOOR
F

SHO
FD

DN DN

CO

CWL
SEPTIC
TANK
DOWN TO
FD DOWNSPOUT

GV

WM

GROUND FLOOR SECOND FLOOR GROUND FLOOR SECOND FLOOR


1 SEWER LINE LAYOUT PLAN 2 SEWER LINE LAYOUT PLAN 3 WATER LINE LAYOUT PLAN 4 WATER LINE LAYOUT PLAN
P-1 SCALE 1:100 P-1 SCALE 1:100 P-1 SCALE 1:100 P-1 SCALE 1:100

LEGEND
WATER CLOSET WP WATER CLOSET
WM
LAVATORY WATER METER
GV
KITCHEN SINK GATE VALVE
FD FLOOR DRAIN CO CLEAN OUT
LAUNDRY POWDER
ROOM ROOM SHO SHOWER CATCH BASIN
KITCHEN
DS DS
F FAUCET MH MANHOLE

DS
CB

COMMON T&B

LANAI UP
GUEST ROOM DP DRAINAGE PIPE CWL COLD WATER LINE
DINING
AREA
DP

HALLWAY PLUMBING NOTES:


TERRACE MASTER'S DN
T&B
ALL PLUMBING WORKS SHALL BE DONE ACCORDING TO THE NATIONAL
LIVING AREA
PLUMBING CODE OF THE PHILIPPINES AND THE RULES AND REGULATIONS
ROOF LINE

CB
CARPORT DS MASTER'S
OF THE LOCAL WATERWORKS AUTHORITY.

DS
WALK- BEDROOM
DS
IN
CLOSET
PORCH
PIPES SHALL BE INSTALLED AS LOCATED IN THE WORKING DRAWING. ANY
ROOF LINE
RELOCATION REQUIRED FOR PROPER EXECUTION OF OTHER TRADES
SHALL BE UPON THE APPROVAL OF THE MASTER PLUMBER.

THE CONTRACTOR SHALL BE RESPONSIBLE TO ASCERTAIN PERTINENT


INQUIRIES SUCH AS LOCATIONS, ACCESSIBILITY, GENERAL CHARACTER
AND THE EXTENT OF THE PROPOSED WORK TO BE PERFORMED BEFORE
GROUND FLOOR SECOND FLOOR ROOF
THE SUBMISSION OF HIS BID.
5 STORM DRAINAGE LAYOUT 2 STORM DRAINAGE LAYOUT 3 STORM DRAINAGE LAYOUT
P-1 SCALE 1:100 P-1 SCALE 1:100 S-3 SCALE 1:100
ALL PLUMBING SYSTEM SHALL BE UNDER DIRECT SUPERVISION OF A
LICENSED SANITARY ENGINEER OR MASTER PLUMBER.

PROJECT TITLE & LOCATION: SHEET CONTENTS : DESIGNED BY: REVISIONS: PROJECT OWNER: SHEET NO. :
DRAWN BY:
UNIT 106 RENOVATION
REG. NO. :
TIN :
106 CRYSTAL HOMES 2, GUITNANG BAYAN II, SAN MATEO, RIZAL
AS SHOWN CHECKED BY:
DATE:
ELSA LIEZL G. ONITA
P-1

You might also like