Engg Report 07 31 2023
Engg Report 07 31 2023
EMD:
Mill Proper
Vacuum cleaning of Mill 1A electrical Panels at 2nd floor T-panel and ground floor panel. (6hrs)
Elect.
Replaced burnt wire of 1857 control of Mill 1A. (2hrs) Elect.
Job Request
0 JR received yesterday.