Professional Documents
Culture Documents
Engg Report 08 03 2023
Engg Report 08 03 2023
EMD:
Mill Proper
Installed back M883 strato fractor motor, Checking of rotation and testing. (4hrs) Elect. Mech.
Pull out another strato motor from Mill 1A (M1888), for overhauling. (4hrs) Elect.
Trouble at Mill 1B roller, defective 3kg load cell due to cleaning of rollers. Replaced 3kg load cell
and calibrate. Tested and observed. (2hrs) Elect.
Job Request
0 JR received yesterday.