manageme

nt
Ps
planning and
Editors note: We have invited our good friend
and world-famous author Ricky Smith to write a series
Maintenance supervisor visits job sites to
ensure no problems exist that will cause
If a problem exists with the work order codes and in-
formation, the maintenance tech or techs should hold
a meeting a few minutes before the end of the shift to
of articles on a Day in the Life of a... for the various roles in problems with the execution of the main-
scheduling ensure the codes are corrected and that the mainte-
maintenance reliability. Please e-mail me if you want to write tenance schedule. (Change the time you execute
this function day to day so your staff does not know your nance tech knows why they need to be changed.
about a day in your life at tohanlon@reliabilityweb.com
schedule.) Afternoon review of job packages
The maintenance supervisor makes his/her rounds to for next day.
ensure all work has started on time and no problems The planner/scheduler arrives at the supervisor’s office
exist. If personnel are at a remote location, a call on for 10-20 minutes to ensure the job plan for tomorrow
the radio or text on the cell at a specific time validates will be executed without a problem. This was talked
that either ev- about at the be-

A Day in the Life of a


erything is on ginning of the
Ricky Smith

Proactive
schedule, or “we article.
have a problem.”
While the Metrics / KPIs
supervisor is or Dash-
making his/her board for
rounds they the mainte-
should be per- nance team.
forming QA/QC

Maintenance Supervisor
As a result of the
checks on the maintenance
work being ex- team’s actions
ecuted. Is the and the plan-
maintenance ner/scheduler’s
tech following a hard work, the
A Daily Planner for Effective Maintenance Supervision repeatable pro-
cedure? Is he/she using the right tool for the job? etc.
team should
know if their work is making a difference. A few Key
If a maintenance tech is working on a critical job, Performance Indicators (KPIs) should be posted in the
then he/she should call or text at a specific time to shop for all to see. If a KPI is not showing positive re-
update whether everything is OK, or if there is a prob- sults, a maintenance team meeting may be scheduled
lem. This is key to the success of a critical job, other- for the next day. A maintenance supervisor wants the
wise maintenance techs get involved in the problem maintenance techs to identify the problem and identi-
Maintenance supervisor updates and think they have it resolved, however it continues fy a solution to improve the KPI. This requires patience
equipment status and production/ technicians are ready for work. The maintenance su- on until it is too late and production or operations is and leadership.
operation changes. pervisor will receive an update on production or equip- impacted. It is important to always know in advance of A few KPI ideas are Mean Time Between Failure of
A maintenance supervisor should know the work ment conditions, or any problems that happened a problem so it can be resolved quickly, possibly with
critical assets, systems, etc., Mean Time Between Re-
scheduled for their maintenance staff a week prior, overnight from their shift personnel and production/ more resources or coordination from production or
pair, and Equipment Availability. These should be post-
and then review the work the afternoon prior, and operations supervision. This ensures the work sched- operations.
ed in a line graph so trends can be seen. A correlation
at the start of his/ uled for the day will
Meeting with maintenance planner/sched- analysis should be completed monthly of these KPIs to
her shift. The pro- go as planned when
cess on the after- the technicians ar-
uler, or both if they are different people. validate if they impact production/operations KPIs.
It is best for this meeting to be held after the mainte- This article was based on my experience as a main-
noon prior involves rive at work. Any last
nance supervisor walks around checking on the work. tenance supervisor and years of helping other mainte-
reviewing the next minute changes can
In this meeting, we are looking forward to ensuring nance supervisors become successful. If you have ques-
day’s schedule with be made prior to
that planning and scheduling is effective. tions, comments, or want to receive my Tool Box Training
the planner/sched- his/her technicians
This meeting is typically held in the morning to dis- Sessions, please contact me at rsmith@gpallied.com.
uler to ensure the arriving for work.
next morning all The goal is to cuss or review any work that is required for the follow-
maintenance tech- ensure maximum ing week, new requests from management, projects in
nicians are aware utilization of all re- each area of responsibility, etc. This may require a visit
to a job site which is to be planned and scheduled in Ricky Smith, CMRP, CPMM, is the Senior
of their work for the sources with little Technical Advisor for Allied Reliability.
day; parts are staged, tools are available, and all coor- confusion at the start of the day’s shift. “In a horse the future. Ricky has over 30 years in maintenance as
a maintenance manager, maintenance
dination has been previously completed. If changes race, if a horse walks when the race begins he/she Validating work order close out. supervisor, maintenance engineer, main-
need to be made to the planning or scheduling, they will end the race last; maintenance technicians are tenance training specialist, maintenance
Sometime during the day, the maintenance supervisor consultant and is a well-known published
can be adjusted at this time. the same.” A maintenance supervisor wants his/her should validate that all work from the previous day is author. Visit www.gpallied.com
One hour before the morning shift, a maintenance technicians to begin their shift out of the gate run- accounted for by a work order and ensure the work or-
supervisor ensures nothing has changed before their ning, and thus run all day effectively and efficiently. der codes are accurate before any work order is closed.
44 feb/march11 feb/march11 45
%
Ricky Smith
Accurate Work
Order Close Out
“TOOL BOX TRAINING”
Reference: ISO 14224 Slightly used workhorse
Reliability, durability and longevity are properties worth looking for in
Accurate Work Order Close Out is important for the
test equipment.
continuous improvement of any organization. The objective Through the years Baker Instrument has been known for developing test instruments that
of accurate data collection is to assist management in hold up and saves money in the harshest environments. We pride ourselves in continually
following that tradition and developing analyzers to provide maintenance professionals with
making the right decisions at the right time. the right tool to efficiently keep rotating electrical machinery operating without downtime.As
Obtain results on efficiency Verify the motor circuit and Monitor motors online from
we transition to SKF durability, reliability and longevity will continue to be our focus. To obtain
estimation and torque analysis insulation with the Baker/SKF your office with the SKF Online more information on these instruments contact us at 800/752-8272 or at our website at
with the SKF Dynamic Motor Static Motor Analyzer - AWA. Motor Analysis System - NetEP
Analyzer-EXP4000. www.bakerinst.com.

General Rules: Uptime23-11quarter.qxp 12/6/2010 9:02 PM Page 1


2. Repair or Corrective Work orders must 3. What should a Work Order have on it
1. Work Orders should have at the mini- have everything as stated above, plus for Preventive Maintenance or Predic-
mum: the correct code (breakdown (1), component code, failure code, and
tive Maintenance?
urgent (2), etc.); the correct equipment cause code.
• The method to prevent or predict
YOUR MOST INDUSTRIAL PRESS INC.
number, at the right level; the main- Without this information one cannot EFFECTIVE COMMITTED TO YOUR MAINTENANCE NEEDS!
tenance person’s accurate total work known failure modes. (Failure
determine:
RELIABILITY NEW AND RECENTLY PUBLISHED!
hours charged to this work order; the • Dominant Failure Thread—which mode—how something fails) ASSET DATA INTEGRITY IS SERIOUS BUSINESS
start time and complete time on the component has the most specific • On a PM procedure, it should have
TOOL IS ON DiStefano & Thomas 2010, 224 pages, Illus., ISBN 978-0-8311-3422-8, $49.95
job; comments from the maintenance failure modes with a specific cause THE JOB... The authors bring many years of experience and hands-on
person as to what work was performed, specific steps and specifications on expertise that cannot be obtained elsewhere. This unique
across multiple assets. resource provides a road map to achieving value out of some-
or any recommendation to changes to what is to be done to known best thing most CEOs, managers, and workers often overlook.
maintenance strategy or plan; any parts practices.
... AND LIVING UNDER A
DESIGN RELIABILITY
used whether from the storeroom or HARD HAT. FOR
Daniel Daley 2011, 250 pages, Illus., ISBN 978-0-8311-3437-2, $44.95
not; and the maintenance signature. Example: Lubricate Bearing: Written from the perspective of the owner/buyer, this
The Manufacturing Game® is a proven and groundbreaking book explains how companies buying
Step 1: Clean the grease fitting. equipment and parts from OEMs can ensure that their
Without this information one cannot sustainable way to get the most out of suppliers are implementing DFR programs that meet
determine: Step 2: Clean the end of the your organization the needs of the buyers.
• Dominant Failure Pattern—which grease gun.
• Actual maintenance cost for spe- • Promotes defect elimination THE RCM SOLUTION A PRACTICAL GUIDE FOR ACHIEVING POWERFUL RESULTS
failure pattern is the most domi- Nancy Regan 2011, 300 pages, Illus., ISBN 978-0-8311-3424-2, $49.95
cific assets. Step 3: Insert 4 grams of lithium • The only simulation that creates
nant, and what the major causes This book is a "how-to" generic approach with minimal theory
• Mean Time Between Failure of failures for this pattern are. This grease (two shots). cross functional teams by a well-known and very active participant in the leading main-
• Mean Time To Repair allows one to develop strategies • Comments on the procedure as • Experience the shift from reactive to tenance organizations and conferences. It presents detailed
proactive operations processes that can be used when RCM is not applicable and pres-
• Mean Time Between Repairs to eliminate unacceptable failures to the effectiveness of it or ents a total solution for implementing RCM for any organization.
which impact the organization.
• Rework recommended changes required. TO SEE ALL OF OUR MAINTENANCE TITLES GO TO WWW.INDUSTRIALPRESS.COM.
MEASURABLE RESULTS IN 90 DAYS!
• If a PM Procedure is effective. ORDER ONLINE AND GET A 25% DISCOUNT ON ADVERTISED TITLES.*
BE SURE TO PROVIDE SPECIAL OFFER #UP23-11 AT CHECKOUT.
• If a specific type repair is effective. If you have questions or would like to
The *OFFER EXPIRES 3/31/11 AND IS AVAILABLE TO U.S. RESIDENTS ONLY.
• If a maintenance strategy meets receive the Tool Box Series, send me an
the intent of maintenance.
M anuf act uring Game® INDUSTRIAL PRESS INC.
e-mail to rsmith@gpallied.com 989 Avenue of the Americas, 19th Floor � New York, NY 10018
www.mfg-game.com (281) 812-4148 (212) 889-6330 � Fax (212) 545-8327
www.industrialpress.com � E-mail: info@industrialpress.com

46 feb/march11 feb/march11 47