You are on page 1of 16
Section 6, Fraud and Corruption B Section 7. Terms of Reference A. PROJECT DESCRIPTION Al. As a key part of this strategy, the Government of Bangladesh, with the support of the World Bank, is implementing the Bangabandhu Sheikh Mujib Shilpa Nagar Development Project under PRIDE project, to support pilot projects under the new EZ model. By doing so, the projects will demonstrate the viability and efficacy of new models to remove key constraints facing the private sector, including adequate infrastructure, access 10 serviced land and good social practices. Particular attention will also be paid to commercial practices and good governance to attract public-private partnerships in zone development, service provision and/or management coupled with a strong emphasis on environmentally and socially compliant manufacturing. A strengthened institutional framework will also be supported through policy advice and capacity building to help accomplish these objectives. A2. The PRIDE design consists of the public sector portion of investment in land, infrastructure and services for a number of pilot EZ, selected to implement new approaches to EZs in Bangladesh. ‘The RRIDE will support transformative investments beyond already established sectors. A key outcome is a contribution towards zoned industrialization, which will enable Bangladesh to maximize the growth benefits of agglomeration and ease the increasing urban congestion. More importantly, the project will enable new sources of growth, where investor interest have already been noted, including but not limited to pharmaceuticals, IT/IT related services, ceramics, processed and frozen food, and ship building. RRIDE project are working for Bangladesh Economic Zones Authority (BEZA) in this regard 3. To support their commitment to economic Zones, BEZA intended in undertaking independent feasibility studies for 03 proposed EZs. B, Background information of proposed Economic Zones BI: Bangabandhu Sheikh Mujib Shilpa Nagar ‘The BSMSN site is located 200 kilometers (km) from Dhaka, 60 km from Chattogram, 70 km from Chattogram Port and the Shah Amanat International Airport and 330 km from Sylhet. The BSMSN Master Plan area is covered in the two districts, three upazilas, and 6 unions and comprised of 26 mouzas. BSMSN has a total land area of 33,805 acres or 136.86 square kilometers (km2) (mostly reclaimed land) with a 25 km coastline along the Sandwip ee Seotion 6, Fraud and Corruption a Channel in the Bay of Bengal. The land elevation on the site varies from the site’s lowest point at -3.33 meters (m) MSL to the highest point at +8.71m MSL.Before development of the BSMSN, the site was comprised of: i) 27.6% idle/barren lands, ii)31.65%mangroves/forest/vegetation, iii) 8.71% water bodies/canals and iv) 6.53% under development. The site location is a moderate to high monsoon climatic area with an average annual rainfall of 500mm. The average temperature on the site varies between 15-25 degrees Celsius annually. BEZA has already prepared a master plan for this industrial city with the support of reputed consultancy firm including topography survey and prepared a shape file BEZA has also prepared separate 2 feasibility study for this area within 8 acres of land. Location of BSMSN {District ~ Upazila Union [ese ' “Mirsarai Techakhali | Shakerkhali | | Mogadia | Muradpur| | Saidpur p= Sonagazi Sonagi SCS | | Char Chandina | ‘The value proposition of BSMSN: + BSMSN is the flagship, ‘smart eity/economie zone’ project for Bangladesh and a ‘game changer’ in economic zone design and development. + Tobe the premier, international work, live, play location and an urban/industrial hub in South Asia. + Strategically located for easy access to domestic and international markets. + Offering a multi-modal transport and logistics platform incorporating a port, rail, roads and airport connectivity to reduce congestion, delays, costs and increase efficiencies as well as strengthen supply chains. + Spearheading state-of-the-art, green and resilient infrastructure, utilities and technology to make BSMSN competitive, efficient, sustainable and resilient. + Targeting innovative foreign and domestic investors. + Promoting exports, clean industry/manufacturing, value addition production utilizing cutting-edge technology, and supporting new industry trends and enhanced creativity. + Aids in transferring knowledge, technology and innovation to local entrepreneurs, professionals and workers + Offering a safe and secure environment, which is monitored on a 24/7 basis for investors, residents, workers, and visitors wy Section 7. Terms of Reference 18 ‘+ Offering an OSS with streamlined and f as after-care facilitation + Offering a competitive labour pool with new types of professional, technical, skilled and unskilled jobs for Bangladeshi tracked processes and procedures as well B2. Araihazar Economic Zone-2 (Kala Paharia) Proposed Araihazar Economic Zone-2 is located in Araihazar Upazila of Narayanganj district in Dhaka division. Araihazar Upazila (narayanganj district) area 183.35 sq km, located in between 23°40" and 23°53" north latitudes an between 90°35" and 90°45" cast longitudes. It is bounded by narsingdi sadar upazila on the north, homna upazila on the south, banchharampur upazila on the cast and rupganj and sonargaon upazilas on the west. Main sources of income of Araihazar poepole are Agriculture 28.48%, n-agricultural labourer 8.29%, commerce 20.19%, transport and communication 4.84%, industry 15.13%, service 5.96%, construction 1.40%, religious service 0.26%, rent and ren 3.44% and others 12.01%. ‘The basic information of site is as follows: ttani ‘* Total area of the site : about 255.14 acres ‘¢ The name of Mouza: Kala Paharia, B3. Satkhira Economic Zone Proposed Satkhira Economic Zone is located in Satkhira Sadar Upazila of Satkhira district in Khulna division. Satkhira is bordered to the north by Jessore District, on the south by the Bay of Bengal, to the east by Khulna District, and to the west by 24 Parg District of West Bengal, India. ‘The annual average maximum temperature reaches 35.5°C (95.9°F); minimum temperature is 12.5 °C (54.5 °F). The annual rainfall is 1710 mm (67 in). Most of the peoples of southern part of Satkhira depend on pisciculture, locally called gher.The main exports are shrimp, paddy, jute, wheat, betel lea ana, f leather and jute c 75|Page Section 6. Fraud and Corruption 16 ‘goods. The Bhomra land port is second largest land port in Bangladesh is only 1$ Km from the proposed The basie information of site is as follows: «Total area of the site: about 206.65 acres ‘The name of Mouza: Polash pole C. SCOPE OF SERVICES This contract covers feasibility studies for Bangabandhu Sheikh Mujib Shilpa Nagar, Araihazar Economic Zone 2 (Kala Paharia) and Satkhira Econor Zone. C1 Specific objectives of Feasibility studies ‘© Carry out separate Feasibility Study for proposed ‘© Assist BEZA for preparing DPP with technical design, drawing and costing; and ‘* Assist BEZ.A for preparing topography survey with shape file of proposed EZs C2. The Feasil ity Studies Feasibility studies will be conducted for independent sites. Each feasibility study will be comprised of the following tasks: ‘Task 1: A Competitiveness Analysis, Transport Assessment, Industry/ Market Assessment and Demand Forecast Task 2: Master Planning, Infrastructure and Financing Requirements, and an Environmental and Social Footprint ‘Task 3: Institutional Framework Task 4 omic and Financial Modelling C3. Detailed Requirements Component 1: Competitive Advantage and Industry Assessment Activity 1: Stakeholder Meetings and a Review of Existing Studies/Information ‘The consulting team will mect with key BEZA staff; relevant Ministries and government agencies, the World Bank Group, and utility providers, as well as, all other interested stakeholders (private/public sectors and civil society) to discuss the selected sites and their development and investment parameters, issues and opportunities. OY Section 7. Terms of Reference n ‘The consulting team will also examine all background information, relevant laws, policies, decrees, maps, and existing studies, documents, and/or reports previously undertaken to understand the key/unique development issues for each site and the new economic zone law and policy, as well as sector studies for any identified potentially competitive industries Deliverable: An Inception report and presentation, A list of all meetings and interviews with ‘meeting notes and another list of studies and documents examined, gap analysis, work plan will be provided to BEZA. Activity 2: Competitiveness Analysis The consulting team will undertake a global, regional and local assessment of investment factors to determine each site’s competitive advantage and given the attributes and connectivity of the site which sectors and subsectors for which each site might potentially be competitive. Each EZ. location should be benchmarked against approximately 6 regional and global industrial/economic zones/areas, with which the sites will be directly competing. These locations shall be formally agreed upon with BEZA before the project commences and can either be the same 6 sites or some variation of them, according to the site1. The benchmarking indicators should include, but not be limited to, a review of the: i) macro- economic environment, ii) infrastructure & utilities, iii) policies & government interventions, ives, v) type of industry, vi) individual operating costs, and vii) quality of life Competitiveness at the firm level: + Competition to be faced by companies to come in EZs. * Possible practices of innovation and R&D collaborations. ‘+ Competitiveness of EZs as a whole: * Value of assistance provided by national & local government, industrial park, local business associations and chamber of commerce, + Manpower regulations and policies. + Attractiveness of the location for activities of companies. + Perceived importance and satisfaction with EZs measured by the following five factors: © Manpower and Labour Factors © Institutional Factors ‘© Governance Factors © Business Environment Factors © Physical Infrastructure Factors * For example, if one site is initially deomed to be potentially competitive for a single sector, that site should be ‘compared against other zones in that specific sector to the degree possible, whereas multi-modal zones should be ‘compared against multi-modal zones, fall sites are deemed to be potentially competitive as multi-modal zones, the ‘same 6 comparator zones can be used. 77|Page Section 6. Fraud and Corruption 8 Deliverable: A competitiveness analysis for each site with a benchmarking assessment against 6 regional and global locations. Each site's individual competitive advamages should be highlighted. A matrix summary should be included in an excel spread sheet. Activity 3: Transport Assessment ‘The consulting team will review the transport modes and networks that will support each EZs development. A critical assessment of existing conditions, potential opportunities and constraints should be identified, and a list of recommended transport infrastructure and networks should be highlighted in order to make each location a viable multi-modal transport platform. The transport options should support the individual types of industry sectors being. proposed for each s Deliverable: A transport assessment reviewing existing conditions, ongoing/upeoming off: site infrastructure facilities and constraints and identifving potential opportunities to make each site a multi-modal transport platform. Activity 4: Industry/Market Assessment ‘The objective of this activity is two-fold: 1) to determine the target industry sectors for each site, and 2) to develop sector profiles, which will estimate the: i) plot requirements, ii) factory i) water consumption/year, iv) ETP/STP/CETP requirement, v) gas & electricity requirements, vi) training needs and vii) employee statistics for each industry sector over a 20-year period. The types of industry sectors identified for each site should be determined via the following methodology: ‘© Undertake detailed survey/interviews with the private sector’; ‘© Review Country Investment Data, ‘© Review Bangladesh's Trade Data, Once the sector data has been examined and the surveys/interviews completed, the consulting team should provide a regional and local overview of each sector to be targeted and identify existing and future inter trends for Bangladesh. Deliverable: A target industry assessment with detailed sector profiles for each site. It is important that each location be studied separately, and the targeted industrial assessment is not for Bangladesh as a whole, but is site specific. Activity 5: Demand Forecasts 2 A detailed demand survey modol is annexed, 4 Section 7. Terms of Reference 9 Utilizing the outcome of the Industry/Market Assessments, the consulting team will prepare 4 20-year demand forecast for each si . The demand projections shall be developed in three scenarios: i) a conservative case, ii) a base case, and iii) an aggressive case. Each scenario should have clearly stated assumptions and the consulting team’s worksheets should be made available to BEA for review, in advance of the work, so the methodology is agreed to by both parties. In addition, the findings of the demand forecasts shall highlight, in 5-year intervals, the amount of land required, and the number of investors projected for each location. Deliverable: A 20-year demand forecast for each Economic Zone location. Under this activity, the consulting team is to prepare a market strategy for each economic zone. The purpose of the market strategy is to provide BEZA with an overview of how each site should be packaged, promoted, and what type of materials would be necded for each zone’s start up. ‘The market strategy should include, but not be limited to: + Identify overall strategy, timing, and implementation framework and responsibilities * Identify target markets, countries, and investor profiles * Identify types of promotional tools and materials required # Identify opportunities to coordinate with other promotional agencies in Bangladesh Deliverable: A market strategy that complements the development strategy for the Economic Zone's location. Each site must have a marketing strategy. Component 2; Master Planning, Infrastructure & — Financing Requirements, and an Environmental & Social Footprint The consulting team will undertake the following as part of Component 2 activities Activity 1: Site Assessment ‘The consulting team will undertake a site assessment and SWOT analysis for each location. ‘This will examine key issues such as: i) planning policies, if) surrounding context, iii) land tenure/ownership, iv) physical landscape, v) access to national infrastructure, vi) on and off site infrastructure, vii) environmental, and viii) social/resettlement issues, opportunities and constraints. Any fatal flaws must be highlighted at this point. Deliverable: A Site Assessment for each of the Economic Zone locations. x BIPage Seetion 6. Fraud and Corruption 80 The consulting team will develop a best practice master plan for each site based upon the market/industry assessment, sector profiles, transport assessment and the demand forecast. findings proposed in Component I. Each master plan will: i) identify guiding planning principles for the development of the sites, ii) develop a list of permitted land uses (a land use plan) for each site, and iii) zoning requirements (a zoning plan) for each location. The zoning will include setbacks, height limits, appropriate densities, and open space requirements as per national and organizational code of construction. In addition, a phasing plan should be prepared for each location. Each EZ should be flexible to handle potential changing needs over a 20 year timeframe, and designed 10 maximize leasable plots and to optimize the plot to infrastructure ratio. Road networks and widths should be developed to mitigate transportation problems such as congestion and should be designed to promote the movement of heavy transportation equipment along with the provision for routine service/maintenance. Design guidelines should be prepared for the sites, and they should include, but not be limited to, the following: © Building orientation on the plot. ‘© Building facades (no blank walls); © Access to the plot. Setbacks, height limits and densities. © Landscaping requirements. © Parking and loading requirements. * Signage requirements. © Environmental, occupational health safety & emergency requirements. Deliverable: A best practice master plan, permitted land use designations, and a phasing plan and design guidelines for each site. Activity 3: On and Off Site Infrastructure Requirements and Associated Costs ‘The consulting team will conduct topographic survey and develop on-site infrastructure concept plans for each site including determine indicative costs of site development and infrastructure provisions that shall include: i) Land development/filling. ii) embankment, ii) boundary walls iii) roads, ii) water supply/distribution network/drainage, ii) electricity, iv) gas, v) storm water, vi) wastewater/industrial water/solid waste, vii) effluent treatment plant/collection network, viii) street lighting and fencing, and ix) telecommunications. Any other on-site concept drawings (buildings etc.) or utility drawings such as cross-sections or clevations to support the understanding of the master plan are encouraged. On-site concept a Section 7. Terms of Reference 81 drawings should be produced at a size that can be reduced as well as, included in the final report. These drawings however must be readable and be properly explained in the body of the report. ‘These on-site infrastructure systems should be designed comprehensively but should be cost estimated by phase, viability gap funding to aid in the preparation of the financial modeling in Component 4. The size of on-site infrastructure should also be designed to match the industry sector demand and forecast in Component 1. Costs for the construction of the on- site infrastructure should include any earthworks to be done to the land to prepare it for development. Land costs (purchase costs) should also be included in the cost estimates. In addition to the on-site infrastructure, the consulting team will identify what type of off- site infrastructure is required and/or what improvements need to be undertaken (roads, water/electrical lines, substations etc.) for each site, who will be financially responsible for this infrastructure (utility providers, private or public sector) and the necessary timing of construction of this off-site infrastructure in order for it to not delay the construction and ‘opening of cach EZ location. Ballpark costing of the off-site infrastructure is acceptable at 11-20%, Deliverable: A set of on-site infrastructure drawings for each EZ master plan including topographic survey report and an overview of necessary off-site infrastructure needs/improvements and their tentative costs, in order for each site to be successful. Activity 4: Environmental and Social Footprint ‘As part of this exercise, BEZA would like the consulting team to review the environmental and social issues on cach site, including resettlement, if required. This is not intended to be a full environmental impact assessment, social impact assessment or resettlement plan but a comprehensive review of the key issues. A review of the physical environment should be included for each site, but not be limited to: ') climate, ii) land useopography, iii) agriculture, iv) ecology, v) air quality, vi) noise, vii) soil quality and geology, viii) surface water, and ix) ground water. In addition, an assessment of the biological environment should be undertaken and should include, but not be limited to: i) vegetation, ii) flora and fauna, iii) animals, and iv) ecologically sensitive/protected areas or special areas in the surrounding community. Lastly, a review of the human and social environment should be undertaken and should inelude, but not be limited to: i health and safety, i) socioeconomic and resettlement issues, i) working & labour condition, iv) minority/child issues iii) historic and cultural aspects, applicable. 81[Page Section 6. Fraud and Corruption 82 This review should also specifically address gender issues, and i) how women and girls in particular will be impacted by the project and ii) how women and girls can be included in the benefits that the community will derive from the project. At this stage, the consulting team should highlight areas of significant problems or fatal flaws and/or propose ways of both mitigating the problems and designing management plans for moving forward. While undertaking this review, it should be kept in mind that each site be utilized for a variety of industry sectors and these impacts on the physical and social environment must be identified and mitigated in the future. All mitigation measures for both the environmental and social aspects should be quantified in such a way that the costs can be included directly in the financial and economic analysis Deliverable: An environmental and social footprint (including resettlement, livelihood if required) of each site with mitigation and management plans proposed for key problems. Component 3: Institutional Framework The consulting team will undertake the following as part of Component 3 activities: 1: Ident The consulting team is to identify the best institutional framework for each or all Economic Zone sites. This should include the preferred management framework for the operations of the Eeonomic Zones. The most appropriate modality of undertaking the PPP should also be evaluated to facilitate the site be developed under PPP (PPP options should be identified). A ‘management plan (organogram) should be developed in this activity and a profile of all major management positions should be prepared. Deliverable: A chapter in each feasibility study that identifies the best institutional framework for each site including a description of the management framework and staff profiles. Component 4: Economic and Financial Modelling The consulting team will undertake the following as part of Component 4 activities: Activity 1: Eeonomic Model In order to determine the economic benefits of each Economic Zone and to ensure that each Zone’s economic and social gains to the government outweigh the costs incurred by the government, the consulting team will conduct an economic analysis for each site location, which will include direct/indirect costs and benefits to the government and society. The results will be a projected economic rate of return (ERR). The economic model should allow for the changing of multiple factors and costs to sce the effects of those changes on the ERR of Section 7. Terms of Reference 83 (sensitivity analysis). In the consulting team’s proposal, it is expected that a methodology, an approach, and clear assumptions will be identified. This would include a list of the economic indicators to be used in the model. Deliverable: An economic model for each Economic Zone site that illustrates the economic/social benefits (ERR) of each project. Deliverable: A financial model and sensitivity tests for each site. IV) Presentation: Final Report Findings ‘The consulting team will make a presentation of the key report findings for cach location. They will also flag any major obstacles, challenges or fatal flaws to each site. Activity 2: Financial Model Based on earlier components such as the industry/market assessment, the demand forecast, and the master plan, the consulting team will perform a financial analysis of each Economic Zone site, advise on viability gap funding to determine its feasibility in the short, medium and long term (20 years), The financial models should indicate the internal rate of return (IRR) of each project, undertake sensitivity tests, and allow for the changing of multiple factors and costs to see the effects of those changes on the IRR. To ensure agreement, the financial model, assumptions, and worksheets themselves, must be approved by BEZA in advance of the financial modelling. D. Reporting and Timeframes In the process of negotiating the contract, BEZ.A and the selected consultants will discuss whether the studies are to be conducted simultaneously with interim reports due at the same time for initiating each of the feasibility studies. Regardless of this decision, these feasibility studies should be completed over a 12 (twelve) months period. The following reports are required: * An inception report and presentation - 1 month after signing the contract (or simultaneously, depending on a decision among all parties during the negotiation phase); Interim report and presentation - Components 1 through 3 deliverables- 5 months after signing the contract Draft final report and prescntation-All components, before the 2 months project i scheduled to end- and Final report- before 1 month of projeet scheduled to end. ‘SN | Component /Activity Deliverables | Timeline A Component 1: Competitive Advantage and Industry Assesiment 1 | Activity * An Inception report and presentation. Within 1 1: Stakeholder Months 83|Page Section 6 Fraud and Corruption = sa SN | Component /Activity Deliverables Timeline Meetings anda Review | « A list ofall meetings’ imerviews with meeting of Existing notes. Studies‘information | ¢ _A ist of studies and documents examined, 2 | Activity 2: ‘+A competitiveness analysis for each site witha | __ Within 5 Competitiveness benchmarking assessment against 6 regional Monts Analysis and global locations. + Individual competitive advantages of each. | | ____|+ A matrix summary in an excel spread sheet. 3. | Activity3: Transport | A transport assessment reviewing existing Within 5 | Assessment conditions and constraints. Months | ‘Identifying potential opportunities to make | each site a multi-modal transport platform. 4 Activity 4: A target industry assessment with detailed sector | Industry/Market Profiles for each site, studied separately and site Assessment specific. ‘S| Activity 5: Demand | 20-year demand forecast for each Economic Zone | Forecasts location. 6 | Activity 6: Market Market strategy for each sites that complements Strategy development strategy for the Economie Zone’s location, B_ | Component 2: Master Planning, Infrastructure Requirements and Environmental and Social Footprint 7 | Activity 1: Site XX Site Assessment for each of the Economic Zone | Within ® Assessment locations. Monts 8 | Activity 2: Best ‘© A best practice master plan permitted land use | Within 8 Practice Master Plan designation, and a phasing plan for each site. Months 9. | Activity 3: On and Of | A set of on-site infrastructure drawings for each | Within 8 Site Infrastructure EZ master plan. Months, Requirements and ‘© Topographic survey report and design Associated Costs guidelines © Anoverview ofnecessary off-site infrastructure needs’ improvements, for each site to be successful 10 | Activity 4 ‘© An environmental and social footprint Within 8 Environmental and (including resettlement, if required) of each Months Social Footprint site ‘* Mitigation and management plans for key problems. | Component 3: Institutional Framework = Activity 1: Identify | 1. The best institutional framework for each site. | Within 10 Institutional Framework | 2. Description of the management framework and | Months staff profiles, ‘Component 4: Economic and Financial Modelling Oy Section 7. Terms of Reference 8s ‘SN | Component /Activity Deliverables Timeline 12 | Activity 1: Beonomie | An economic model for each Economic Zone site Within 10 Model that illustrates the economic/social benefits (ERR) | Months | ofeach project. __| 13 | Activity 2: Financial | A financial model and sensitivity tests for each site. | Within 10 Model Months E. Expert Man month ee SN Position No MM_|_ Total 1 | Team leader 7 Municipal development | 1 8 8 expert - | 2 | BZ Master Planning Expert 1 | 6 6 3 Infrastructure Expert (Civil, 1 6 6 Electrical) — | 4 nancial Expert 1 6 6 5. | Industry Sector Expert T 6 6 6 | Social Expert 1 6 6 7 1 6 6 Total - 7 44 | Key Expert Competencies ‘The team of key consultants is expected to be comprised of a Team Leader, an Economic Zone Master Planning Expert, an an Industry Sector Expert, a Social Infrastructure Expert, a F ncial Expert, pert, and an Environmental Expert —all having at least Master's degree in relevant discipline and at least 10 years related experience. APPENDIX B - Key EXPERTS* SN Position ‘Qualification Experience 1 [Team Leeder | Master's degree | Minimum 15 years general experience, in Physical ‘+ Minimum 10 years specific experience in the Planning, Urban similar fel. and Regional Planning or similar _ 2 | EZ Master Master's degree Minimum 12 years general experience. Planning Expert | in Physical ‘+ Minimum 10 years specific experience in the Planning, Urban, similar field, Regional Planning or - similar x 85|Page Section 6, Fraud and Corruption 86 SN Position Qualifieation Experience 3 | Infrastructure | Bachelor's Degree | Minimum 12 years general experience, Expert in civil, mechanical, | Minimum 10 years specific experience in the ‘electrical and similar fel. structural gineering, _ | Financial Expert | Masters Degreein | * Minimum 12 years general experience. Finance/ Eeonomics | Minimum 10 years specific experience in the or similar fed. similar [_s Industry Sector | Master's Degree in| + Minimum 12 years general experience Expert Business ‘+ Minimum 10 years specific experience in the Administration’ similar field, | Economies or | similar 6 ‘Social Expert Master's Degree in | * Minimum 12 years general experience . Sociology/ Social | * Minimum 10 years specific experience in the Science or similar similar field, y "Environmental Master's Degree ‘* Minimum 12 years general experience } Expert in Environmental | « Minimum 8 years specific experience in the Studies or similar fel, Similar * Signed CVs of Key Experts should be attached. + Non-Key expert as per requirement (The frm will shar the proposed non-key expert CVS) * CV must be signed orginally/Digitally by respective consultant. (Sean copy will ot be ac=pt) The consultant team may employ supporting staff for the supervision of the sub- projects and operation of the project office, if required. The supporting staff may include: 1) Architect 2) Data collector 3) Administrator 4) Accountant 5) Typist 6) Draftsman * Supporting Stats per requirement (The fr wil share the proposed Supporting Sta CVs) H. Expected Time Schedule ‘The total duration of consulting services will be 12 months. The implementation schedule expected is as shown in Table, KKey Activities linvitation of EOL (08/07/2022 Oy Section 7, Terms of Reference 87 issue of RFP 30/11/2022 Commencement of — Consulting (05/05/2023 services | Termination of Consulting Services 05/06/2024 | 1. Procurement Method A consultant will be selected accordance with the Quality- and Cost-Based Selection (QCBS) method; Market Approach-International set out in the procurement Regulation of the World Bank Procurement Regulations for IPF Borrowers, July2016, Revised November 2020, 87|Pa ©

You might also like