Professional Documents
Culture Documents
D.F.U.V
Fixture Number
Unit Total ABBREVIATIONS :-
WC-1 / EWC-1 0 4 0 FLUSH VALVE / PRIVATE USE
WC-2 / EWC-2 0 6 0 FLUSH VALVE / PUBLIC USE
WC-3 / EWC-3 0 3 0 FLUSH TANK / PRIVATE USE
LAV-1/LAVE-2 0 1 0 LAVATORY/PUBLIC OR PRIVATE USE
FD 0 2 0 FLOOR DRAIN/PUBLIC OR PRIVATE USE
AHUD & FCU (AD) 0 2 0 AIR HANDLING/FANCOIL UNITS
DWF 0 0.5 0 DRINKING WATER FOUNTAIN
PD / TD 0 2 0 PARKING / TRENCH DRAIN
J.S 0 3 0 JANITOR SINK
SH 0 2 0 SHOWER
KS 0 2 0 KITCHEN SINK
UR 0 4 0 URINAL
Total Drainage Fixture Units Value = 0 D.F.U
Drainage Design Discharge Qd = 0 GPM= 0 L/S
IN CASE OF TANK EMPTYING
VOLUME OF TANK (M3)= 305
AREA OF TANK (M2)= 112
DURATION REQUIRED TO EMPTY 10 CM TANK HEIGHT=0.5 HRS
FLOW DISCHARGE PER SUBMERSIBLE PUMP Qsp = = 49.4 GPM
3.11 L/S
Sump Dimension
Effective volume
assume pump start on 5 minutes & shut off 5 minutes.
So,pump will operating 6 times per hour
V =[ TIME(SEC)*FLOW (LITERS/SEC) ] /4
V= 514.2 LITERS Pump stop = Pump depth
Effective sump pit depth 0.25 M Pump lead start = stop level + Effective Level
Inlet pipe invert level 0.40 ACCORDING TO THE PLAN Pump lag start = pump lead start + 0.15m
Pump stop level 0.30 High level = pump lag start + 0.10m
Pump lead start level 0.55 Total depth= high level + invert level
Pump lag start level 0.70 0.1 m between inlet pipe and high level
Pump high level 0.8
TOTAL DEPTH 1.30
Volume OF SUMP
Dimensions
LENGTH = 1.5 m
WIDTH = 1.5 m
DEPTH = 1.30 m
TOTAL VOLUME = 2.9 m3