You are on page 1of 1

ETABS 20.2.

0 7/22/2023

1 2 3 4 5 6 7 8 9 10 11 12
8 (m) 6 (m) 6 (m) 6 (m) 6 (m) 6 (m) 6 (m) 6 (m) 6 (m) 6 (m) 6 (m)
PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0
G

7.6 (m)

Dio

F
7.6 (m)

E
7.6 (m)

D
7.6 (m)

C
7.6 (m)

B
7.6 (m)

PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0 PIPE114X3.0


A X

mandalay 2 story steel structure OPTION 11.EDB Plan View - RF - Z = 11 (m)

You might also like