Sub: Minutes of the Meeting held on 03.08.

2023 by Project Evaluation


Committee in c/w examination of DPRs for various projects.

The meeting of the Project Evaluation Committee was convened on


03.08.2023, chaired by PED/GS, to discuss the DPRs of below mentioned
projects.

The meeting was participated by: -

1. Shri Rakesh Choudhary, ED /SD&T


2. Shri Kamlesh Gosai, ED/GS(Traffic)
3. Shri T.D. Diwivedi, ED/GS/Finance
4. Shri Sangh Priya Gautam, Director/GS/Elect.
5. Srinivas Malladi,Director/GS/SD-IV

Officers from concerned Zonal Railways also attended the meeting through
VC.
Projects Discussed:

i. Redevelopment of Khajuraho railway station

ii. 1. Khajuraho railway station


Railway Station: - North Central Railway
 Khajuraho Railway Station is entrusted to North Central Railway for
development
 The details of the project and estimated cost as submitted by the Zonal Railway
are as under:

Salient Feature Details

Area of Station for development Site Area- 57.30 Acres

Station Development parcel) - 49.40 Acres

Total Built up area Existing: 1,680.00 Sqm

Proposed: 20,884.50 Sqm

Platforms Existing: 03 Nos

Proposed: 03– High level

Total - 06

Station Building Area 12,377.34 Sqm


Salient Feature Details

Relocated & Other structures Area 1998.36 Sqm

Daily Passengers Existing: 3,800

Future Projection (2066-67): 22,905

Peak Hour Traffic (PHT) Existing: 380 pax

Future Projection (2066-67): 2290 pax

Entries to the station Existing: 02

Proposed: 03

Land Acquisition 44,915 sqm /11.01 Acres

No of Lifts Existing: 02

Proposed: 16 Nos

No of Access Controls Existing: None

Proposed: 39

No of Escalators Existing: 0

Proposed: 18 Nos

No of Travellators Existing: None

Proposed: None

Roof Plaza and FOB Existing FOB’s: 01

Proposed FOB’s: 04 ,(2 each for arrival and


free movement )

Area of through Roof: 5,057 Sqm

Air Concourse = 3792.60 Sqmt

Total seating capacity in Platform Area Existing: 350


(Nos)
Proposed: 216 seating approx on all
platform

Total Seating capacity Existing: 370

Proposed: 1,342
Salient Feature Details

Commercial Area in Concourse Existing: None

Proposed: 1,327.41 sqm

Commercial Area in Station Building Existing: 35 Sqm

Proposed: 2730.05 Sqm

Future Commercial Space / Land 44,675 Sqm


Parcels

Parking Facility Existing: 6,063 Sqm

Proposed: 18,177.7 Sqm 790 ECS

Solar Panel installed area (sqm) & Existing: 43.90 KWp


Capacity
Proposed: 600 KWp

Water Recycling plant/ Treatment plant Existing: No


with capacity
Proposed: 125 KLD

Total power requirement per day and Existing: 500 KVA


augmentation required
Proposed: 3 no 1000 KVA Transformers
(including 1 standby)

Summary of Cost
Description Total Amount (in INR)

Total for Station Development 1,89,04,95,127.68

Add for furniture @ 1% 1,89,04,951.28

Utility Services shifting @ 1% 1,89,04,951.28

Art Work @ 0.25% 47,26,237.82

Green Building Certification @ 0.1% 18,90,495.13

Detailed design charge @ 1% 1,89,04,951.28

Subtotal 1,95,38,26,714.47
Summary of Cost
Description Total Amount (in INR)

Contingencies @1.0% 1,95,38,267.14

Subtotal including contingency 1,97,33,64,981.61

Add Departmental charges (5.29%) 10,43,91,007.53

Sports Development Charges @0.1% 19,73,364.98

External Electrical Connection

LAND ACQUISITION 10,00,00,000

Cost of Project 2,17,97,29,354.12

Say 217.97 Cr.

Completion period 27 months

A presentation was given by CPM/GS/Jhansi on the Project of Redevelopment of


Khajuraho Railway Station. Following points and observations were raised during
the presentation:
Based on the information and justification provided by CPM/GS, it is observed
that:
a. There is no yard remodelling and signalling involved in the scope of work
b. It was informed that telecom work has been taken up as extant policy.
c. Schematic is approved by competent authority.
d. In case any component of project requires alteration in yard / layout, the same
shall be undertaken after execution of the alteration.
e. The traffic projections of number of passengers / number of footfalls at the
station have been worked out based on CRIS data. The projections are
confirmed / agreed by the Division / Zone.
As per the presentation of DPR & Master Plan by the CPM/GS and the
justification given for the project for the substantial benefit to the bona-fide
passenger, ED Committee recommends taking the project forward at a total
cost of Rs 217.97 crore (estimate attached in annex-A)
Rakesh Choudhary B. S. Bodh T.D. Diwivedi,

ED/SD&T ED/GS/Elect. ED/GS/Finance

(Convenor)

Kamlesh Gosai Manoj Kumar


Srivastava,
ED/GS(Traffic)
PED/TTM