You are on page 1of 2

TO WHOM IT MAY CONCERN

This is to certify that Mr. Varma Abhishek Rameshbhai had worked in M/s SATRA
Services and Solutions Private Limited from 24-Aug-2019 to 12-Sept-2022. The details
of project are;
1.Name of Project: Design, Supply, Erection, Testing & Commissioning of 25 KV, 50
Hz, Single Phase, Traction Over Head Equipment, Traction sub stations, Switching
Stations and other associated works, associated Signalling & Telecommunication work,
Civil engineering work i.e. service buildings, quarters, siding and electrical general
services works for Railway Electrification of Hubballi (incl.)- Tinaighat (incl.) double line
section (284 TKM) of Hubli division of South Western Railway in the state of Karnataka,
India
2.Position Held: Project Engineer (Electrical)
3.Total Project Cost (Electrical Works): Rs 98.5 Crore
4.Name of Client: South Western Railway
5.Length of Total Experience: 3 Years
6.Brief Description of Works Assigned:
 Planning of site activities work schedule & material management for optimal
utilization of resources at site.
 Coordination with the subcontractors & client for the best pace of execution and
timely completion of work, ensuring quality and safety records at site.
 Execution of foundation work of equipment’s of 2x25 kV 132/25 kV traction sub-
station, switching stations etc
 Responsible for erection of the Electrical equipment’s Power Transformer, SPI, AT,
Interrupters, Capacitor Bank, series reactor, Control panel, Battery Bank etc
 Responsible for Earthing & Bonding works such as Equipment’s and structures
Earthing, Earthmat Laying etc
 Responsible for cable laying from equipment’s to the control& relay panel, AC and
DC distribution boards.

He has performed his duties in a diligent and satisfactory manner and was a valuable
member of our Project Team.
We wish him success in his endeavors.

TVSS Rao,
Authorized Signatory
SATRA & SAICPL Consortium