. (Gradien - |W ; — ~
a ts & ‘hether it has been ensure that there is no change of grades NA
vithin 30 meters of any points or crossings and there is no i
Sin hange of cant within 20 meter of points and crossings?
1S [Hselation hether isolation as per rules for opening railways Ch VII NA
17 Landt tem 36(5 &6) and SEM Para 7.73. ] have been provided?
hether railway land boundary with distant from main line has Yes
been shown?
is ridges in yard hether complete description of bridges with chain ages have
been shown
LC gates in Whether list of all LC gates in the block section on either side NA
Dlock Section on jof the station has been given in tabulated from along with the
Doth side nformation such as LC Gate No. its location /Kms,
lassification, manned/unmanned & interlocked/non
interlocked.
20. [LC gates __in Whether LC gate within station yard is clear of all running NA
Station yard lines, loop lines, dead ends and siding?
21. Chainages ether chainages of points, trap, fouling mark (FM) gradient NA
posts, signals, bridges/culverts, central line of station building
etc have been mentioned?
22. § hether CSR & CSL of all running lines & siding. inter signal NA
distances & aspect control chart or colour light signals has been
mentioned in SIP.
24. [solation hether trap point with isolation as required, open away from NA :
he important running lines?
;.°°4.|
erritory. i
ma
Se a ee
“8 Stop Signal “ hether any stop signal has been located immediately train to NA |
Stop aller a bridge (to prevent on the Bridge potion when signal
is at ON
29 Dispensation con Whether. the applications have been submitted with the copies NA
a) TSAA Whether, TSAA has been submitted for any one work of the] = NA |
application.
31 SIGNALS Whether, any signal has right hand side ? If so whether GM NA
Approval has been obtaining for flashing the signal of right
! hand side.
52 Deviation from Whether there is any deviation GR requiring dispensation? If NA
GR yes whether it has been mention on SIP along with the approval
: of the competent authority ?
33. Sand humps In case of sand hump, Whether RDSO drawing number has peep NA
mentioned in ESP & SIP.
34 Commencement ‘Whether a certificate has been submitted by the applicant for NA
; of the work that the work, for which the application is made, has not been
: , started? In case a part work is completed before application,
: | 'Whether the same has been written with reasons ?
'35 Existing layout Whether, existing yard layout has been checked for curvature, NA
! | clearance, Track center, Turnout & turn in curves, Gradient
| etc? If not, reason may be brought out.
36 Separate enlarge (1)Whether, the relevant portion of proposed work involving NA
! portion of turnout cross over or any other complex geometry has been
! proposed layout separately plotted on larger scale. Annotating all important
| | Geometrical parameter by like radius, length of curve/straight,
. angle etc. .
(2) Whether, soft copy of plot has also been submitted.
: 37. Soft copy ether a soft copy of ESP has also been submitted?
ical note | AG officer? [NA
38 Technical note Whether a technical note is attached from S
34 Yard layout in In case the vard work is part of. , _ = ~ Oo
connection with doubling eauge CONN ersion hen re a major project ot NA .
rojec : ; !
Feet (1) eeerhatteutenmen and details seculon of the | :
| | (ii) Whether the a ved “ “ open Tine (I IQ) !
, of the nroject te ane copy of complete alignment |
; a S attached with other application. |
a reference Of same may be given.
Qi) Whether a brief description of the overall Project
| _ has been enclosed with the application?
| | (iv) Whether the standard layout as per railway Board's
letter = no.2015/SIG/WO/Standard layout — dated
| 12.07.2017 has been followed?
| (v) In case answer of (iv) is no, then whether a detailed
justification with RB’s approval has been obtained
Past a , and the same has been attached with the application?
ase work Whether the proposed work is a phase work of final NA
| lan? If ves whether the phase work has been planned as
f it is a complete separate work in itself and all
documents have been prepared accordingly?
41 [Temporary work Whether the proposed work is temporary? If so the No
period by which permanent work will be executed may
e indicated? Details of permanent work should also be
indicated in the descriptive note in the separate para?
and CSTE (PLG)? Ref railway Board’s letter No.
016/SIG/Drg of 01 Dated 09.11.2017.
:
as actual measurement dimensions as existing on field?
If not reason may be brought out?
44 Constraints and Whether there is any permanent speed restriction existing NA
speed restriction due to any constraint in the yard? If so the details may be
piven? It should be indicate whether the constraint can be
emoved and whether there is any plan to remove the
onstraint?
45 Special Thether there is any special precaution to be observed in NA
nrecautions the yard as per existing SWR? If yes please sive details.
hether any special is proposed to be imposed due to
proposed work? If yes whether the details have been
submitted?
(Sudhir Kumar)
Sr.DEN/V/PRYJ