REV. NO. 0
ENGINEERING STANDARD DATE JAN 2001
PAGE 1 OF 8
This document is issued by Engineering Standards Section, SABIC R&D Complex, PO Box 42503, Riyadh 11551, Kingdom of Saudi Arabia.
The information contained in this document is the confidential property of SABIC. It can not be disclosed, copied or used for any purpose
without prior approval from SABIC. If you are not authorized to posses this document, please destroy it immediately.
NUMBER E03-G01
REV. NO. 0
Coordination of Protective Devices
DATE JAN 2001
ENGINEERING STANDARD PAGE 2 OF 8
CONTENTS
1. SCOPE................................................................................................. 3
2. REFERENCES 3
3. DEFINITIONS 3
4. GENERAL ............................................................................................ 3
5. SHORT CIRCUIT DATA 4
5.1 Symmetrical Short-circuit Currents 4
5.2 Fault Contribution Considerations................................................... 4
6. TRANSFORMER DATA 4
7. MOTOR DATA 5
7.1 Large Motor Coordination ............................................................... 5
7.2 Specific Motor Protection Devices 6
8. RELAY DATA 6
8.1 Data Shown on Drawings................................................................ 6
8.2 Protective Relays 6
9. BREAKER DATA 6
9.1 Breaker Curves ............................................................................... 6
10. FUSES 7
11. CABLES 7
12. COORDINATION MARGINS ................................................................ 7
13. ADDITIONS TO GRAPHS 8
14. RELAY COORDINATION SOFTWARE PACKAGES 8
NUMBER E03-G01
REV. NO. 0
Coordination of Protective Devices
DATE JAN 2001
ENGINEERING STANDARD
PAGE 3 OF 8
1. Scope
This standard is for coordinating the performance of system protective devices through a coordination
study. The guidelines specify data required and methods used for constructing, and graphically presenting
coordinated protective device time-current curves.
2. References
Reference is made in this standard to the following documents. The latest issues, amendments, and
supplements to these documents shall apply unless otherwise indicated.
SABIC Engineering Standards (SES)
E02-G01 Electrical System Design Criteria
Institute of Electrical and Electronic Engineers (IEEE)
141 Recommended Practice for Electric Power Distribution for Industrial Plants
242 Recommended Practice for Protection and Coordination of Industrial and Commercial Power Systems
C37.91 Guide for Protective Relay Applications to Power Transformers
C37.96 Guide for AC Motor Protection
National Fire Protection Association (NFPA)
70 National Electrical Code
3. Definitions
For the purpose of understanding this standard, the following definitions apply.
Circuit Breaker. A device designed to open and close a circuit by non-automatic means and to open the
circuit automatically on a predetermined overcurrent without damage to itself when properly applied within
its rating. The automatic opening means can be integral, direct acting with the circuit breaker, or remote
from the circuit breaker.
Full-load Current. The greatest load that a circuit is designed to carry under specific conditions; any
additional load is overload.
Protective Device. A unit of an electrical system, for example a fuse, circuit breaker, or relay, that is
designed to isolate a portion of the electrical circuit when an abnormality occurs.
Time-current Characteristics. The correlated values of time and current that designate the performance
of all or a stated portion of the functions of a protective device.
Time-current Curves. Graphic representation of time and current values. These curves can be computer
generated from plotted characteristics.
4. General
4.1 The selection of relays and the proper trip settings to protect feeders, transformers, motors and
generators requires a basic understanding of the operating characteristics of protective devices. The
current and voltage conditions on the electrical power distribution system under the various possible fault
conditions shall also be understood. To evaluate and achieve selective isolation of faults on plant electrical
power systems, it is necessary to plot the time-current characteristics of all the protective devices that are
in series.
4.2 Selective coordination of protective relays has a major impact on a plant's electrical system
performance and reliability. This standard provides guidelines for creating, analyzing, and documenting a
coordination study. The coordination study can optimize circuit protection to minimize damage to system
components and prevent injury to personnel. Additional benefits include sustaining service continuity and
limiting the extent and duration of service interruptions.
4.3 The primary purpose of a coordination study is to determine satisfactory ratings and settings for
electrical system protective devices. Protective devices shall be chosen so that pickup currents and
operating times are short, but sufficient to override system transient overloads, for example inrush
NUMBER E03-G01
REV. NO. 0
Coordination of Protective Devices
DATE JAN 2001
ENGINEERING STANDARD PAGE 4 OF 8
currents experienced when transformers are energized or motors started. When an abnormality occurs, the
protective device shall isolate a minimal amount of the electrical system. Further, the protective device
shall be coordinated so that the circuit interrupter closest to the fault opens before other devices.
4.4 The relay coordination study shall follow the guidelines given in IEEE 141 and 241. It shall conform to
SES E02-G01.
4.5 Any conflict(s) between this standard, SES and industry standards, engineering drawings, and contract
documents shall be resolved at the discretion of SABIC.
6. Transformer Data
6.1 The full load current shall be plotted for each transformer. Care shall be taken to determine whether
the self-cooled or fan-cooled rating of the transformer is being used.
6.2 The inrush current shall also be plotted to ensure coordination with instantaneous settings of relays. If
several transformers are connected to a single feeder, then the total inrush current shall be plotted.
Normally, this value is plotted at 12 times full load current. However, it may vary from 8 to 14 times,
depending upon the manufacturer and transformer size. The inrush current value is plotted at 0.1 s and
shall be below the primary protection device curve.
6.3 Transformers can be damaged by faults external and downstream of the transformer if they are not
provided adequate through fault protection. The transformer damage curve shall be plotted on the relay
coordination sheet. The fault protection curve depends on the transformer size, impedance, and predicted
fault occurrences. It has been widely recognized that damage to transformers from through faults is the
result of mechanical and thermal effects. Although the temperature rise associated with high magnitude
through faults is typically quite acceptable, the mechanical effects are intolerable if such faults are
permitted to occur with any regularity. This results from the cumulative nature of some of the mechanical
NUMBER E03-G01
REV. NO. 0
Coordination of Protective Devices
DATE JAN 2001
ENGINEERING STANDARD
PAGE 5 OF 8
effects, particularly insulation compression, insulation wear, and friction-induced displacement. For this
reason, separate damage curves have been created for different categories of transformers that
experience infrequent and frequent faults. Frequent faults are generally defined as more than ten in the
transformer's lifetime. See IEEE 242 for data on transformer damage curves.
6.4 Winding connections affect the coordination study. In plotting coordination curves, it is important to
know the relationship between transformer primary line currents and secondary line currents for various
types of secondary faults. This relationship may require the protective device curves to be shifted
horizontally on the coordination graph.
6.4.1 For delta primary-grounded wye secondary, the maximum primary line current is [0.58 X secondary
voltage (line-to-line)/primary voltage (line-to- line)] X secondary fault current for a secondary line-to-ground
fault. For a line-to-line fault, the 0.58 becomes 1.16.
6.4.2 For delta primary-corner-of-delta grounded secondary transformers, the maximum primary line
current is [1.0 X secondary voltage (line-to-line)/primary voltage (line-to-line)] X secondary fault current for
a secondary line-to-line or line-to-ground fault.
6.5 See IEEE C37.91 for additional discussion on transformer protection. This reference provides:
a. Detailed discussion of the type of faults to which transformers are exposed
b. Common protection schemes and device
c. Special protection devices
d. Typical coordination curves for transformer protection
7. Motor Data
7.1 Large Motor Coordination
7.1.1 When large motors require coordination, two pieces of basic data shall be plotted before any
coordination is attempted: the thermal damage curve and the motor-starting characteristic curve.
7.1.2 Large motors, or the transformers that supply them, can be damaged if the vendor's
recommendations on number or frequency of starts are violated. Waiting periods of an hour or more may
be involved after making a certain number of starts. The manufacturer shall furnish the thermal damage
curve. This curve shall be obtained at the time of the original purchase. All motor protective relaying shall
fall below this curve.
7.1.3 If the exact motor-starting characteristic is available, it shall be plotted. The characteristic curve
consists of the following:
a. Inrush current
b. Locked-rotor current
c. Current during acceleration
d. Allowable stall time
e. Motor full-load current
7.1.4 If all the information is not available, the characteristics (or typicals) that can be obtained shall be
plotted. More recently manufactured energy-efficient motors have been found to experience a higher
inrush current than older motors. This shall be considered when using typical data.
7.1.5 Many times, the entire coordination is based upon the relaying of a large motor, because its
protective devices are set so high that they dictate the settings of all relaying upstream, including that of
the public utility.
NUMBER E03-G01
REV. NO. 0
Coordination of Protective Devices
DATE JAN 2001
ENGINEERING STANDARD PAGE 6 OF 8
8. Relay Data
8.1 Data Shown on Drawings
8.1.1 The following data shall be shown on the coordination drawings or indicated on a provided data
sheet or both. Data shall be indicated for each relay curve.
8.1.2 The relay tap setting and corresponding minimum pickup current shall be designated on the relay
curve (at the voltage in which the relay's current transformer is connected).
8.1.3 Instantaneous settings are shown as a vertical line from the time characteristic. Instantaneous
settings for motors shall be set at approximately 175 percent of locked-rotor current. Instantaneous settings
for relays feeding unit substation transformers shall be set at approximately 200 percent of the secondary
three-phase symmetrical fault current. The 200 percent margin comprises 160 percent for asymmetrical dc
offset, 110 percent for voltage variance, and 113 percent for safety margin.
8.1.4 The ‘Tap’ and ‘Inst. setting’ information shall include the range available along with the actual setting.
8.1.5 Additional settings for special relays, for example voltage and differential relays, shall also be
indicated.
8.2 Protective Relays
8.2.1 Protective relays are classified by the variable they monitor, or by the function they perform. Some
common relays are overcurrent (51), differential (87), and directional overcurrent (67). As shown in the
parentheses, the ANSI relay function number shall be indicated on the curve drawing and attached
documentation. See IEEE 141 for a complete listing of ANSI relay function numbers.
8.2.2 The application and coordination of the relays is usually a mixture of good engineering practice and
protection performance compromises. The system is usually separated into zones, with specific relay
protection for each zone. If the primary protection in the affected zones does not operate properly, some
form of backup relay protection shall be provided. With backup protection, the time for the fault to clear will
increase and typically cause more of the system to be de-energized.
9. Breaker Data
9.1 Breaker Curves
Breaker curves for low-voltage power circuit breakers shall be plotted on the coordination curve with the
following information:
a. Both pickup points and the range of pickups shall be shown
b. Long-time pickup settings in multiples of trip-device or sensor current shall be shown (including
the primary current value). Long-time delay characteristics shall be shown as a function of time.
c. Short-time pickup settings in multiples of trip-device or sensor current (including the primary
current value) shall be shown. Short-time delay characteristics shall be shown as a function of time.
d. Instantaneous pickup setting in multiples of trip-device or sensor current (including the primary
current value) shall be shown
e. For circuit breakers with ground-fault detection, the pickup settings and ranges shall be shown
NUMBER E03-G01
REV. NO. 0
Coordination of Protective Devices
DATE JAN 2001
ENGINEERING STANDARD
PAGE 7 OF 8
10. Fuses
10.1 Both the minimum melting time and the total clearing time curves shall be shown on the coordination
graph. A fuse may coordinate on one fault, but if the minimum melting curve has been crossed, the fuse
may not coordinate on the next fault.
10.2 Standards permit ±10 percent current tolerance for fuse curves. This means that an actual fuse
curve, supplied by a vendor as a single-line curve, is actually a band of ±10 percent current values from
those on the single-line curve.
10.3 For information on primary fusing of power transformers, see IEEE 242 and NFPA 70.
10.4 When fuses operate in the current-limiting range, the instantaneous peak let-through current shall be
taken into account when trying to obtain selective coordination. The total energy let-through by the fuse is
a function of current squared (I2) multiplied by time (t) and is commonly designated as I2t let-through. For
two fuses in series to coordinate properly, the total clearing I2t of the downstream fuse shall not exceed the
minimum melting I2t of the upstream fuse. Most vendors provide ratio information between their fuses to
facilitate coordination. For a fuse to coordinate with an upstream relay or breaker with an instantaneous
setting, the total clearing I2t shall not exceed the instantaneous pickup. This is why instantaneous settings
are not usually used on a circuit breaker that feeds a motor control center.
11. Cables
11.1 The overcurrent protection required for a 600 V cable is dictated by the ampacity of the conductor in
accordance with NFPA 70.
11.2 Feeders over 600 V without overcurrent protection shall have short-circuit protection in each
ungrounded phase. The protective setting can be as high as three times ampacity for a fuse, or six times
ampacity for a breaker.
11.3 Cable/conductor heating limit curves shall be plotted on the coordination graph, to ensure thermal
limits are not exceeded.
11.4 Medium voltage (MV) cable shield ampacity shall also be evaluated during a coordination study. This
information can be included and evaluated on the ground relay coordination graph. During
phase-to-ground faults, the cable shield on MV cables carries part of the fault return current. To prevent
cable damage, the cable shield ampacity shall be adequate to carry the available system ground-fault
current for a time period exceeding the system ground-fault clearing time.
manufacturing tolerance can be reduced to 0.12 s. Static relays require a smaller coordination margin
because of the absence of relay overtravel.
12.5 When coordinating relays and other downstream protective devices, for example a downstream fuse,
only the relay overtravel and tolerance margins need to be considered.
12.6 Due to unforeseen circumstances, selective coordination may not be possible. For example, a
primary protection device curve may not fit completely under a backup protection device curve. In this
case, either maximum protection or selective coordination shall be compromised. Usually, however, the
compromise decided upon results in the least amount of economic impact. See IEEE 242.