You are on page 1of 46

Welcome to the session!

We will start in few minutes.

If you have questions during the session please use the Q&A panel
(click on the button
© 2021 SAP SE or an SAP affiliate company. All rights reserved.
in the lower part of the screen). 1
March 2021

Post follow-up activities


STEP08
Dipen Mehta
Sushil Singhal
Veeresh Angadi
Phased approach | Week 1

STEP01 STEP02 STEP03 STEP04 STEP05


Date/Time Monday 22nd February Tuesday, 2nd Wednesday, 3rd March
Monday,1st March 2021 Thursday, 4th March 2021
2021 March 2021 2021
12:30 – 14:30 PM (SGT) 12:3:0 – 14::30 PM (SGT)
12:30 – 13:30PM (SGT) 12:30 – 14:30 PM (SGT) 12:30 – 14:00 AM (SGT)

Objective Initial Kickoff call Preparation phase Preparation phase Preparation phase Realization phase
Technical Logistics Finance Technical Conversion

Content & • Overview of • Readiness Check • Review STEP02 • Review STEP03 • Review STEP04
bootcamp • Maintenance Planner • Business Partner • Finance preparation • Overview about SUM
Activities • Mutual Expectations • Simplification Items concept • Consistency checks for System
• System conversion Check (tool) • Customer Vendor • Reconciliation Conversion
overview • Custom Code analysis Integration (CVI) • Period-end closing • Execute technical
• System environment • Q&A • MRP activities and conversion including
used • MATNR Extension documentation uptime and downtime
• Q&A • Simplification Items • Simplification Items phases with SUM
Check (Logistics) Check (FI-CO) (DMO)
• Q&A • Q&A • Q&A
Rollout call 1 hour 2 hours 2 hours 1,5 hours 2 hours

Basis 6 hours 32 hours

ABAP 2 hours 1 hour (SPDD, optional)


Finance 4 hours
Logistics 6 hours

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 3


Phased approach | Week 2
STEP06 STEP07 STEP08 STEP09 STEP10
Date/Time Wednesday, 10th March Thursday, 11th March
Monday, 8th March 2021 Tuesday, 9th March 2021 Friday, 12th March 2021
2021 2021
12:30 – 14:00 PM (SGT) 12:30 – 14:30 PM (SGT) 12:30 – 14:00 PM (SGT)
12:30 – 14:03 AM (SGT) 12:30 – 14:30 PM (SGT)

Objective Realization phase Realization phase Realization phase Realization phase Review and Feedback
Finance migration SAP Fiori activation Post follow-up activities Custom Code adaptation

Content & • Review STEP05 • Review STEP06 • Review STEP07 • Review STEP08 • Review STEP09
• Post technical • Overview of Fiori • Post activities for CVI • Overview of S/4HANA • Project Experience
Activities conversion tasks deployment options and MRP extensibility options • Feedback
• FI Customizing/Data • SAP Fiori apps • Configuration and • Side-by-side and in- • Certificates
Model impact selection activation of S/4HANA app extensibility • System access
changes • Rapid Activation for Output Management • Custom Code • JAM Group and
• Q&A SAP Fiori in SAP • Activation of PP/DS adaptation material access
S/4HANA • Q&A • Q&A • Q&A
• Q&A
Rollout call 1.5 hours 2 hours 2 hours 2 hours 1.5 hours

Basis 6 hours 2 hours 2 hours

ABAP 2 hours
Finance 4 hours
Logistics 2 hours

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 4


Content:

• Review of previous STEP07

• Logistic post-conversion activities

• SAP S/4HANA Output Management

• Production Planning & Detailed Scheduling (PP/DS)

• Transportation Management

• Extended Warehouse Management

• Closure & call-to-action

• Q&A

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 6


Review of STEP07
Convert Architecture

SAP S/4HANA 2020 SAP HANA SAP S/4HANA 2020 SAP HANA

SAP NW ABAP SAP NW ABAP


SAP HANA 2.0 SAP HANA 2.0
Windows 2016 SLES15 SLES15 SLES15

• Starting point • Application Server on Linux

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 8


Changing the Implementation Experience of SAP Fiori
New approach: Experience SAP Fiori “out of the box” along business roles
Adjust
Rapid SAP
Select relevant Experience FLP content
Fiori
business roles SAP Fiori and business
activation
roles

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 9


FLP=SAP Fiori launchpad
Logistic post-conversion activities
S/4HANA – Business Partner Master Data

Company Code Data ERP Synchronization SAP S/4HANA


Central Data Sales Area Data
(Conversion) Synchronization
CVI Complex Interface
Business Partner Customer Vendor

BP APIs
Customer / Vendor Leading Background Leading Background
Data Buffer Object Object Object Object
Get

SAVE CVI
Outbound Customer Customer
Business Business
Partner Partner
Customer APIs Vendor APIs
Vendor Vendor

Business CVI Link Customer Vendor


Partner Tables (Supplier)

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 11


BP & CVI in S/4HANA – Business Impact

▪ In S/4HANA the following transactions are no longer available or redirected to transaction BP

▪ Transactions that are obsolete:


– FD06, FK06, MK06, MK12, MK18, MK19, VD06, XD06, XD0, V+21, V+22, V+23, MAP21, FD0
▪ Transactions that get redirected to transaction BP:
– FD01,FD02,FD03, FK01,FK02,FK03, MAP2,MAP3, MK01, MK02, MK03, V-03,V-04,V-05,V-06,V-07,V-08,V-09,
V-11, VAP1, VAP2, VAP3, VD01, VD02,VD03, XD01, XD02, XD03, XK01, XK06, XK07, XK02, XK03

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 12


CVI Synchronization

CVI implementation is a prerequisite for converting an SAP ERP system to an SAP S/4HANA system.
All the customers, vendors, and contact persons must be converted to business partners in ERP before starting system conversion.

SAP ERP SAP S/4HANA

Preparation Synchronization Conversion Post Conversion


Configure CVI in your SAP Create and synchronize Convert the system Configure CVI in your
ERP system for the business partners for all the SAP ERP → SAP S/4HANA system for
synchronization of existing customers and vendors SAP S/4HANA the synchronization of
customer/vendor-to-BP
C/V → BP BP → C/V

Objects in Objects in
SAP ERP SAP S/4HANA
The CVI interface ensures the synchronization between the
Customer business partner object and the customer/vendor objects in both Leading Object
ERP and SAP S/4HANA Business Partner
Vendor Roles
Customer
Vendor
© 2021 SAP SE or an SAP affiliate company. All rights reserved. 13
CVI – Business Process Impact
Purchase Order

PO 4500000004
Partial GR and Invoice
posted

Review POs
4500000005
4500000006

These POs will be


processed further in
S/4HANA after system
conversion

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 14


Logistic post conversion activities | MRP Planning File

SAP Note 2268088 - S4TWL - Planning File


» In SAP S/4HANA the planning file was optimized for simplified update logic, consistency and for update performance.
» In the SAP ERP system, reports RMMDVM10 and RMMDVM20 made a first setup of planning file entries and checked
planning file consistency for operative planning.
» In SAP S/4HANA, run report PPH_SETUP_MRPRECORDS instead. For long-term planning, the reports RMMDVL10
and RMMDVL20 are replaced by the report PPH_SETUP_MRPRECORDS_SIMU.

Required actions
» After the system conversion, you should run report PPH_SETUP_MRPRECORDS to populate the new planning file
table with operative MRP records (PP-MRP) and the report PPH_SETUP_MRPRECORDS_SIMU for simulative MRP
records (PP-MP-LTP). Alternatively, you can also use the conversion reports PPH_CONVERT_MRPRECORDS and
PPH_CONVERT_MRPRECORDS_SIMU.

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 15


SAP S/4HANA Output Management
Output Management: General Information

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 17


New S/4HANA Output Management

Output Parameter Determination (BRF+)

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 18


New Output Management

New Output Management for

Impact after transition to S/4HANA:


SAP highly recommended to shift to successor
New Output Management. SAPScript and
SmartForms are also supported with the New
Output Management.

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 19


Configuration of the new Output Management

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 20


New Output Management

For existing customers who are using the old output management
▪ Data from old Output Management is kept during the conversion
▪ Customizing for old Output Management is kept (Customizing tables are copied 1:1 when converting to S/4 HANA)
▪ Customers need to customize the new Output Management if they decide to use it
▪ Documents started in the old Output Management will still be processed with the old NAST
▪ New Documents will be using the new Output Management only (if corresponding application is adopted already)

For new customers


▪ Customers need to customize the new Output Management
▪ All documents will be using the new Output Managemrent (if corresponding application is adopted already)

Please have a look into note 2228611 for further information.

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 21


Limitations for the New Output Management

▪ New Output Management for SAP S/4HANA only supports the "pure" output channels, while the NAST-based
output is also used for several kinds of post-processing, output management for SAP S/4HANA cannot be used
if one of the following NAST transmission mediums is required:
▪ 8 Special function
▪ 9 Events (SAP Business Workflow)
▪ A Distribution (ALE)
▪ T Tasks (SAP Business Workflow)
▪ Currently, IDocs are not fully supported by the new output management. Their use is restriced to business
applications that previously used NAST. Furthermore, the following limitations apply:
▪ Only output types which can be mapped 1:1 to the NAST-KSCHL can use IDoc.
▪ Only business partner-based communication is supported, but no communication to logical systems (no ALE support).
▪ Manually created output items cannot be used for IDoc, as the partner role cannot be set for such items.
▪ Multi tray output is not yet supported in the new Output Management

Therefore, the recommendation is not to carry out a full conversion, but to establish a coexistence of old
and new output management.
© 2021 SAP SE or an SAP affiliate company. All rights reserved. 22
Using old and new Output Management in S/4HANA

▪ The new BRF+ based output management does not support the dunning functionality for purchase orders
(transaction ME91F). In case if this functionality is needed, the NAST based output management should be
used.
▪ With the NAST based OM all output determination scenarios of the purchase order are supported. You can
switch between BRF+ and NAST based OM at any time - always the actual configured way is used. Already
posted POs are still processed with the OM which was active during the creation of the PO. Default OM in
S/4HANA will be BRF+ based.
▪ As mentioned in note 2292571 you need ADS - requiring a JAVA installation - in case you want to use PDF-
based print forms. The BRF+ method also supports Smartform and SAPscript outputs.
▪ Note that output medium EDI (Idoc) is not fully supported in the new output method, please see note 2228611
for further details.

See note 2344602 - Is it possible to use the old logic of output determination in S/4 HANA instead of
BRF+? For more details
© 2021 SAP SE or an SAP affiliate company. All rights reserved. 23
Additional Information

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 24


Production Planning & Detailed
Scheduling (PP/DS)
Transition to SAP S/4HANA
Scope of Business Process Transformation

i.e. mandatory Simplifications


and FI Migration seperate, single implementation projects
(i.e. BP re-design, PP/DS, Fiori UX, etc.)

System Conversion (technical project)

System Conversion with additional/full scope of BP Transformation (aka‘Big Bang‘)

Technical Migration Business Process Transformation

New Implementation (‚Greenfield‘)

Landscape Transfomation w/ individual Scope

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 26


SAP S/4HANA 1909 Manufacturing for planning and scheduling*

UI Harmonization, CIF Simplification, Master Data Harmonization, Analytics

Traditional system Simplification with SAP S/4HANA

Common
SAP Advanced Planning and

Master
Planning

Data
Optimization – planning and detailed Live cache
SAP S/4HANA and detailed
scheduling
scheduling

CIF

CIF SAP HANA platform, including live cache

ERP Database

ONE Master Data


(Material, Work Center, Sources of Supply)
Load, Replicate, Sync & Update of ONE MRP
Master, Planning & Transactional Data ONE Launchpad

* does not reflect licensing


© 2021 SAP SE or an SAP affiliate company. All rights reserved. 27
S/4HANA Manufacturing for Planning and Scheduling with embedded PP/DS
Production Planning
Detailed Scheduling
Advanced Production Planning and
Key Capabilities Scheduling (APS-) functionality integrated into
ERP
Available:
Master data » UI Harmonization / CIF Simplification
One MRP
» Master Data Harmonization
S/4 HANA CIF PP/DS
» One MRP / Analytics (Fiori)
» DDMRP
» pMRP
HANA Platform incl. Live Cache Analyze the detailed material
flow and time continuous
capacity in real-time with New in 2020:
Production PP/DS@S/4HANA
Planner » PP-Solver (aka Production Planning Optimizer - PPO)
for a multi-level finite planning (bucket) approach with
mathematical optimization
» IBP-Process Integration
for synchronized planning across the network and
within production sites

Roadmap* :
» DD-Scheduling (DDOM)
» Tank Planning, etc…
© 2021 SAP SE or an SAP affiliate company. All rights reserved. 28
Manufacturing & Supply Chain Integration in SAP S/4HANA
Supporting all levels of Manufacturing complexity Digital Manufacturing
Digital Supply Chain
MANUFACTURING & SUPPLY CHAIN • Integrated Business Planning (IBP)
Suite** • Responsive manufacturing (ME, MII, QIM, VE)
• Production operations (MII, QIM)
• SAP Global Track & Trace

SAP S/4HANA Manufacturing


for Planning and Scheduling • PPDS – Constraint based Planning and scheduling Optimization* (short
Manufacturing & Planning
term bottlenecks) Optimization
• Demand Driven MRP* to reduce stock buffers & prioritize Sales over
Forecast
• Predictive MRP* to simulate planning
• Production Planning Optimizer* (PPO) for multi-level finite planning
(bucket)

Core Manufacturing, Integration,


Transparency & control
• Material Requirements Planning (MRP-Live)
• Capacity Planning and Scheduling (CRP)
• MRP-Cockpit (Fiori Launchpad)
Enterprise Management
Digital Core

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 29


*Additional license - **Additional installation and license – C(Partially) Compatibility scope
PP/DS activation and configuration procedure

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 31


Transportation Management
Transportation Management with SAP S/4HANA
Enhanced Transportation Model
through Hub approach
SAP S/4HANA SUPPLY CHAIN Leverage Decentral SAP TM for
Suite** • Transportation hub approach
• Independent operations, versioning, upgrades

• Strategic Freight Management • Transportation Proposal


INTEGRATED
• Service Order Management • Automated Carrier Selection / Carrier
TRANSPORTATION
MANAGEMENT*
• Combined Inbound / Stock Transfer / Ranking List
Outbound Transportation Process • Load Consolidation / Load Planning (3D Optimize Transportation
• Driver Management Visualization) Processes
• Advanced Charge Calculation • Package Building
• Carrier / Service Billing • Professional Tendering Management
• Planning: • EWM Integration (via services)
• Order and Delivery Based Planning • Integration with
Process • Event Management
• Transportation Cockpit • Global Trade Service
• Vehicle Scheduling Routing Optimization • Descartes
• Gantt Chart
• Planning on 2 monitors

• Main Parts of the Transportation Network Management Shipping transparency and


• Freight Agreements • Freight Settlement Management
TRANSPORTATION • Charge Management • Basic Agency Billing control
• Separated Inbound / Outbound Freight • Direct Tendering for Service Agents
Order / Booking Management (Delivery (Subcontracting)
based) • Dangerous Goods Management
• Basic Transportation Planning (POWLs / • TM Output Management
Enterprise Management manual Freight Unit Selection) • TM Analytics
• Transportation Execution without Event
Digital Core

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 34


*Additional license - **Additional installation and license – C(Partially) Compatibility scope
Extended Warehouse Management
Extended Warehouse Management with SAP S/4HANA
Supporting all levels of warehouse complexity Optimize & Synchronize through
Warehouse Hub
SAP S/4HANA SUPPLY CHAIN Leverage Decentral SAP EWM for
Suite**
• High volume warehouses
• Independent operations, versioning, upgrades
• Material Flow System (MFS)
• Inventory Management Optimization (e.g. Slotting)
ADVANCED • Inbound Process Optimization (e.g. Deconsolidation)
WAREHOUSING* • Outbound Process Optimization (e.g. Waves)
• Material Flow Control Optimize warehouse operations
• Yard Management (e.g. TU handling, DAS)
• Labor Management (incl. Processors, Shifts, Time & Attendance, Travel Distance,
Standards, Tracking and Monitoring)
• Value Added Services
• Kitting
• Cross Docking
• Warehouse Billing
• Integrated Load Planning
• Improved Package Builder & Stock Consolidation
• Inventory Management Stock transparency and control
• Inbound Processing
WAREHOUSING
• Outbound Processing (incl. change of deliveries)
• Internal Warehouse Movements
• Physical Inventory
• Reporting
• Enhanced QM Integration in S/4HANA with EWM
Enterprise Management • New Pick-by-Cart FIORI App
Digital Core (Pick small quantities, multiple customers in one run, or into same parcel)

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 36


*Additional license - **Additional installation and license – C(Partially) Compatibility scope
Supply Chain Functionality within SAP S/4HANA
Warehouse Management Options

All customers converting to SAP S/4HANA from an existing ECC system


with LE-WM, will – initially after conversion – reside on LE-WM as
SUPPLY CHAIN compatibility scope1.
Going forward, warehouse management functionality within SAP
• Integrated business planning
• Global batch traceability S/4HANA, is delivered via two options:
Suite** • Extended warehouse management
• Transportation management a) Customers innovating their warehouse processes follow SAP’s
Extended • Advanced warehousing (a)
Scope* • Advanced transportation
strategic direction and will convert to embedded EWM with the option
• Advanced order promising to run basic and/or advanced scope (which has license implications).
• Inventory
Enterprise
Management
• Basic Warehousing (a or b) b) Customers with no desire to manage or even optimize complex
• Shipping and transportation
• Order promising warehouse processes, and who want to keep their established
offering, can technically stay on LE-WM and use the stock room
management functionality with certain restrictions2
Both options can also co-exist within one deployment and customers
looking for a decentral approach can use SAP S/4HANA EWM
standalone for some or all of their warehouses.
12269324 - Compatibility Scope Matrix for SAP S/4HANA on-premise
2Not included are Task & Resource Management (WM-TRM), Warehouse Control Unit interface (WM-LSR), Value Added Service (WM-VAS), Yard
Management (WM-YM), Cross-Docking (WM-CD), Wave Management (WM-TFM-CP), and decentral WM (WM-DWM)
© 2021 SAP SE or an SAP affiliate company. All rights reserved. 37
*Additional license - **Additional installation and license – 2(Partially) Compatibility scope
Options to operate warehouses with SAP S/4HANA Enterprise Management

Different storage locations


Enterprise Management of the same plant can have
different warehouse
scenarios
Plant 0001 1. MM-IM
2. LE-WM
3. Stock Room Mgmt.
SLOC#1 SLOC#2 SLOC#3 SLOC#4 SLOC#5 SLOC#6 SLOC#7 SLOC#8 SLOC#9 SLOC#10

OP or STE
4. Basic EWM
5. S/4HANA Cloud
6. Advanced EWM
Stock Basic Advanced
IM WM Room Mgmt EWM EWM 7. Decentral LE-WM
8. Classic EWM
Netweaver
WM S/4HANA 9. S/4HANA EWM
EWM
(LES) EWM 10. Non-SAP WMS

S/4HANA

MTE
Cloud

WMS
© 2021 SAP SE or an SAP affiliate company. All rights reserved.
non-sap 38
Option 1: MM-IM managed warehouses

Main Characteristics
• No storage bin management
• Pure “total” quantity management (e.g. which product, which batch, which stock type)
• Basic pallet (i.e. handling nit) processes only
SLOC#1 • No system guided, controlled warehouse operations

IM

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 39


Option 2: LE-WM (in compatibility scope)

Main Characteristics
• Relevant for small warehouses with manual operations
• Storage bin management, basic operations
• No enhancements nor development plans
SLOC#2 • LE-WM is part of the compatibility scope in S/4HANA, hence usage rights will expire end of 2025

WM

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 40


Option 3: Stock room management in SAP S/4HANA

Main Characteristics
• SAP introduces stock room functionality as an offering for existing LE-WM customers
• Compared to the LE-WM in compatibility scope, functionality is reduced (e.g. no Task & Resource Management, no
Value-Added Services, no Cross Docking, no picking waves, no WM-LSR)
• Relevant for small warehouses with manual operations
SLOC#3
• Storage bin management, basic operations
• No enhancements nor development plans
Stock room mgmt.

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 41


Option 4: Basic Warehouse Management (using embedded deployment)

Main Characteristics
• Basic warehouse management provides support with and real-time transparency into managing and processing material
movements flexibly based on embedded EWM
• SAP‘s strategic warehouse product

SLOC#4
• Continuous innovations (e.g. FIORI, Analytics, …)
• Limit scope to business necessary by project and template definition (e.g. limited nodes in warehouse monitor, FIORI
apps only, limited strategies …)
Basic
EWM

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 42


Option 5: Advanced Warehouse Management (using embedded deployment)

Main Characteristics
• Full functionality of SAP EWM can be enabled
• SAP‘s strategic warehouse product
• Continuous innovations (e.g. FIORI, Analytics, …)
SLOC#6 • Limit scope to business necessary by project and template definition (e.g. limited nodes in warehouse monitor, FIORI
apps only, limited strategies …)

EWM

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 43


SAP S/4HANA >1909 - Warehouse Management
Supporting all levels of warehouse complexity
Stock Room Management
Extended Warehouse Management
• Inventory
All customers converting to SAP S/4HANA
Management from an existing
Optimization
1
Optimize
ECC system with LE-WM, will – initially after
(e.g. Slotting) conversion –
reside on LE-WM as compatibility scope .
• Inbound Process Optimization (e.g. Deconsolidation) warehouse
Going forward, warehouse management functionality within SAP S/4HANA, is delivered via two options:
• Outbound Process Optimization (e.g. Waves) operations
a) Customers innovating their warehouse processes follow SAP’s strategic direction and will convert to embedded
SAP S/4HANA SUPPLY CHAIN
• Material Flow Control
EWM with the option to run basic and/or advanced scope (which has license implications).
• Yard Management (e.g. TU handling, DAS)
b) • Customers with no desire to manage or even optimize complex warehouse processes, and who want to keep their
Labor Management
established offering, can technically stay on LE-WM and use the stock room management functionality with
• certain
Valuerestrictions
Added Services
2
Suite
• Kitting
Both options can also co-exist within one deployment and customers looking for a decentral approach can use SAP
• Cross Docking
S/4HANA EWM standalone for some or all of their warehouses.
Products • Extended Warehouse Management • Warehouse Billing

Digital Core • Basic warehouse management Stock


Basic Warehouse Management transparency
• Inventory Management and control
• Inbound Processing
• Outbound Processing
Enterprise Management
• Internal Warehouse Movements
• Physical Inventory
• Reporting

12269324 - Compatibility Scope Matrix for SAP S/4HANA on-premise


2Not included are Task & Resource Management (WM-TRM), Warehouse Control Unit interface (WM-LSR), Value Added Service (WM-VAS), Yard
Management (WM-YM), Cross-Docking (WM-CD), Wave Management (WM-TFM-CP), and decentral WM (WM-DWM)
© 2021 SAP SE or an SAP affiliate company. All rights reserved. 44
Closure, call-to-action and Q&A
System landscape for today

The frontend and backend


server
SAP S/4HANA 2020

SID: K<XX> (e.g. K01)

Main usage: this system is the


S/4HANA back-end system

Activities:
• Logistic post-conversion
• Output Management
• PP / DS
• Situation Handling (optional)

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 47


Call to action

• Review this presentation (published in JAM group)

• Execute the activity documents for STEP08:


• Logistic post conversion activities
• Output Management
• PP/DS

• Collaborate using JAM in case of issues or doubts

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 48


Q&A
You can now ask your questions

Using the Q&A panel (click on the

button in the lower part of the screen).

or

Raise your hand to ask verbally (click the raise


hand button) and we will unmute your line.

© 2021 SAP SE or an SAP affiliate company. All rights reserved. 49


Thank you.
Contact information:
SAP 10Steps2S4 Team

Mail: sap10steps2s4@sap.com

JAM: 10Steps2S4 APJ-March 2021

You might also like