5. COATING (PAINTING/LINING) FINAL INSPECTION REPORT FOR PIPING & OTHERS (EXCEPT FOR EQUIPMENT)
Project Name : NFE Onshore LNG facilities Project No: LTC/C/NFE/3945/18 Form number: PNT-005-A Rev. No: 0
Tag No: As per Attachement. Tag Description : As per Attachements .
CWA : N/A RFI Number: NFE1-MEG-PA-RFI-00076 Report Number: 638-FI-5D-PNT-5A-00015
Subsystem No: N/A Subsystem Description : N/A
Coating System No. Spool Size Surface Prep. Date Dry Film thickness Color Date Subcon. CTJV
1
51860A1-SL6486007R01-SP4 5D 6" SSPC SP10 6/10/2023
80 GREY 6/10/2023 M.Shamim Anil kumar NFE1-MED-3A&4A-5D-PNT-00015
2
51860A1-SL6486007R01-SP3 5D 6" SSPC SP10 6/10/2023
78 GREY 6/10/2023 M.Shamim Anil kumar NFE1-MED-3A&4A-5D-PNT-00015
3
71160AA-SL6000013R01-SP13 5D 6" SSPC SP10 6/10/2023
70 GREY 6/10/2023 M.Shamim Anil kumar NFE1-MED-3A&4A-5D-PNT-00015
4
51860A1-SL6486009R01-SP6 5D 6" SSPC SP10 6/10/2023
72 GREY 6/10/2023 M.Shamim Anil kumar NFE1-MED-3A&4A-5D-PNT-00015
5
71160AA-SL6000013R01-SP14 5D 6" SSPC SP10 6/10/2023
69 GREY 6/10/2023 M.Shamim Anil kumar NFE1-MED-3A&4A-5D-PNT-00015
6
71160AA-SL6000013R01-SP10 5D 6" SSPC SP10 6/10/2023
75 GREY 6/10/2023 M.Shamim Anil kumar NFE1-MED-3A&4A-5D-PNT-00015
7
71160AA-SL6000005R01-SP9 5D 6" SSPC SP10 6/10/2023
68 GREY 6/10/2023 M.Shamim Anil kumar NFE1-MED-3A&4A-5D-PNT-00015
8
71160AA-SL6000013R01-SP40 5D 6" SSPC SP10 6/10/2023
69 GREY 6/10/2023 M.Shamim Anil kumar NFE1-MED-3A&4A-5D-PNT-00015
9
71160AA-SL6000013R01-SP27 5D 6" SSPC SP10 6/10/2023
85 GREY 6/10/2023 M.Shamim Anil kumar NFE1-MED-3A&4A-5D-PNT-00015
10
71160AA-SL6000005R01-SP1 5D 6" SSPC SP10 6/10/2023
80 GREY 6/10/2023 M.Shamim Anil kumar NFE1-MED-3A&4A-5D-PNT-00015
SIGNATURE