Professional Documents
Culture Documents
: ABSRF/2023/11/10873
SRF Date: 08-Nov-23
ULR No. TC984323000002933F
2. Customer Reference
2.1 SRF No. : ABSRF/2023/11/10873 Dated 08-Nov-23
2.2 Test Report No. : ABQAR231102933 Issue Date 17-Nov-23
2 Survey Meter Pulsecho / SMARTRAD-MICRO H-0742 0.01 mR/hr - 999 mR/hr NICC00706/13 25-Jul-25
(-50 TO 70⁰C) & 10 to 99%
3 Hygrometer HTC/288-ATH ABPL/HYG-03 AT23000007884 28-Jun-24
RH
Imaging NA NA
4 LEADS / PRO RF BASIC TOOL NA NA
Phantom
5. Note:
5.1. The Test Report relates only to the above item only.
5.2 Publication or reproduction of this Certificate in any form other than by complete set of the whole report & in the language, written, is not permitted without the written
consent of ABPL.
5.3. Corrections/erasing, invalidate the Test Report.
5.4. Refered standard for Testing: AERB Test Protocol 2016 - AERB/RF-MED/SC-3 (Rev. 2) Quality Assurance Formats.
5.5. Any error in this Report should be brought to our knowledge within 30 days from the date of this report.
5.6. Results Reported are valid at the time of and under the stated conditions of measurements.
5.7. Name, Address & Contact detail is provided by Customer.
Page 1 of 5
SRF No.: ABSRF/2023/11/10873
SRF Date: 08-Nov-23
ULR No. TC984323000002933F
6. TEST RESULTS
60 62.40 Pass
70 71.56 Pass
Accuracy of
80 83.53 Pass
5 Operating ± 5 kV
90 92.67 Pass
Potential (kV)
100 103.5 Pass
Tolerance :
At 1.5 mm Al for kV <= 70
Total
6 3.00 mm of Al 2.0 mm Al for 70 < kV <= Pass
filtration 100
100
kVp 2.5 mm Al for kV > 100
Linearity of
mA/mAs 0.037 Pass
7 At 60 kV CoL<0.1
loading
Stations
60 0.010 Pass
Consistency
80 0.008 Pass
8 of radiation CoV < 0.05
100 0.002 Pass
output
kVp mA
Radiation Measured at
100 100
leakage level
at 1m from For Tube Housing 0.020 Tube Leakage < 1 mGy in
9 Pass
tube housing mGy in one one hour
and hour
Collimator For Collimator 0.024
Page 2 of 5
SRF No.: ABSRF/2023/11/10873
SRF Date: 08-Nov-23
ULR No. TC984323000002933F
Operating parameters:
Operating parameters:
Observe the images of the two steel balls on the radiograph and evaluate tilt in the central beam
Observed tilt < 1.50 Pass
0
Tolerance: Central Beam Alignment < 1.5
4. TIMER TEST
Operating parameters:
Page 3 of 5
SRF No.: ABSRF/2023/11/10873
SRF Date: 08-Nov-23
ULR No. TC984323000002933F
Operating parameters:
Average
mGy /mAs Coefficient of
mA Applied Radiation Output (mGy) Output X MAX X MIN Remarks
(X) Linearity (CoL)
(mGy)
Operating parameters:
Maximum Radiation Leakage from Tube Housing 0.020 mGy in one hour
Maximum Radiation Leakage from Tube Collimator 0.024 mGy in one hour
Tolerance: Maximum Leakage Radiation Level at 1 meter from the Focus should be < 1 mGy (114 mR) in one hour.
Page 4 of 5
SRF No.: ABSRF/2023/11/10873
SRF Date: 08-Nov-23
ULR No. TC984323000002933F
Equipment Setting:-
Maximum Radiation level/week (mR/wk) = Work Load X Max. Radiation Level (mR/hr)
60 X mA used for measurement
Maximum Radiation Level/week (mR/wk) For Radiation Worker 0.012 mR/week Pass
I hereby undertake that all the information provided above is correct and in accordance with the detailed Quality Assurance Report enclosed herewith.
Page 5 of 5