Professional Documents
Culture Documents
3) Turn on the power and put the machine room controller in inspection mode
4) Set M2-P9-R8 enter UP arrow enter
5) Remove CAN0 plug from the main board
6) Set date and time from menu M2-P8
7) Set next maintenance date to M2-P5 to a day long after. ex.2099
8) Set max start count M2-P0 to 000000
Then try to
Change M2-P3-C09=2sec
Change M2-P3-C10=0.3sec
Try to move the lift and confirm the condition has been changed.