You are on page 1of 10

8/4/23, 3:33 PM PROFESSIONAL PRACTICE 1

NAME :

DATE :
35 Questions

1. Architects are people who are academically &_______ qualified to practice architecture

A technically B current

C professionally D legally

2. state-owned architecture schools are exempted from being______ by the government so it


can offer the architecture degree

A recognized B non-listed

C owned D listed

3. The BS Architecture Program is a ____ course

A six-year B four-year

C three-year D five-year

4. The architect is selected for aa project by_____method

A referral by another architect B direct

C design competition D All listed

5. Architect may acquire project through _____

A bidding B invitation

C facebook D newspaper advertisement

6. Architect's license maybe suspended due to _____

A fraudulent acts B no projects done

C non-renewal D non-payment of dues

https://quizizz.com/print/quiz/5b555dc5e96b6f00192d81ce 1/
10
8/4/23, 3:33 PM PROFESSIONAL PRACTICE 1

7. The ____ regulates the practice of the profession of architecture in the Philippines

RA 8266 RA 9246

RA 8256 RA 9266

8. The architected is selected for a project by

bidding proposal

advertisement design competition

9. The client can select an architect through

bidding referral by an architect

advertisement proposal

10. Participants in a design competition should be

civil engineers artists

registered architects students

11. SPP 201 is____

Pre-design services Construction Services

Post Construction Services Regular Design Services

12. SPP 202 is____

Pre-design services Regular Design Services

Post Construction Services Construction Services

13. SPP 204 is____

Pre-design services Construction Services

Regular Design Services Non listed

https://quizizz.com/print/quiz/5b555dc5e96b6f00192d81ce 2/
10
8/4/23, 3:33 PM PROFESSIONAL PRACTICE 1

14. SPP 205 is____

Post-Construction Phase Regular Design Services

Pre-design services Construction Services

15. SPP Documents replaced the

1979 PIA Documents 1975 UAP Documents

1979 UAP Documnets IAPOA Documents

16. The ____ are studies involving the studies of secondary information as in-puts to
Architectural Design

Matrix Analysis Architectural Programming

Architectural Research Pre-feasibility studies

17. Which is an unethical action with respect to the Architect's responsibility to his colleagues
and subordinates?

serving as professional adviser, accepts


undertakes a commission from another
employment as Design Architect for a
Architect duly notified .
competition project

provides free professional service for a donates to obtain advantage in a


charitable project religious project

18. The act of conceiving, choosing and developing the type, disposition, arrangement and
proportioning of the structural elements of an architectural work giving due
consideration to safety, cost-effectiveness, functionality and aesthetics.

A structural analysis B structural conceptualization

C structural designing D structural work

19. Within 15 days after the awards of Bids, the payment to the Architect shall be adjusted so
that it will amount to a sum equivalent to how many percent of the Basic Fee, computed
upon the winning Bid Price?

A 75% B 65%

C 95% D 85%
https://quizizz.com/print/quiz/5b555dc5e96b6f00192d81ce 3/
10
8/4/23, 3:33 PM PROFESSIONAL PRACTICE 1

20. Arrange sequentially the following work according to the 16-division uniform construction
index:
i. Thermal and Moisture Protection
ii. Specialties
iii.Finishes
iv. Doors and Windows
A ii,iii,iv,i B i, iii, iv, ii

C ii,iv,iii,i D i,iv,iii,ii

21. Which is an ethical action with respect to the Architect's responsibility to his
manufacturer's, dealers and agents?

receives commissions placing him in a


receives gifts or favors from agents
reciprocal frame of mind.

avails of technical services by


accepts market discounts credited to
manufacturer accompanied by an
client
obligation

22. Which is an unethical action with respect to the Architect's responsibility to his client?

undertakes construction for a fixed guarantee any estimates or cost of the


contract sum under design-build service work

does not offer preliminary sketches


advises client to forego unviable projec
without an agreement

23. Not included in the scope of services for Interior Design of a music studio commissioned
to an Architect

prescribes interior finishes assists negotiations with fabricators

prepares electronic equipment


prepares furniture schedul
specifications

24. The client will not have this as basis for selecting the Architect using comparative
selection
A ability to undertake the project B references from former clients

C number of technical staff members D personal acquaintance


https://quizizz.com/print/quiz/5b555dc5e96b6f00192d81ce 4/
10
8/4/23, 3:33 PM PROFESSIONAL PRACTICE 1

25. An activity where the Architect may be paid on a per diem basis plus out-of-pocket
expenses such as travel, accommodations and subsistence, long-distance telephone calls,
secretarial service.

A feasibility study B confer with prospective investors

C data gathering D accounting

26. Which group classification belongs projects involving extensive detail such furniture
design, built-in equipment, special fittings, screens, counters, interiors and other detailed
parts of appurtenances of buildings or structures and landscaping designs?

A Group 6 B Group 9

C Group 8 D Group 7

27. How are projects classified in determining the basis for the Architect's Basic Fee?

A material specifications B total floor area

C structural components D degree of project complexity

28. Which work item is chargeable to the Owner and not included in the regular scope of
services?

A electrical load calculation B extra drafting of changes made by Owner

C structural analysis D miniature models of design studies

29. A method of compensation that is flexible, easy to apply and is related to the size and the
type of the project.

A percentage of construction cost B lump sum or fixed fee

C multiple of direct personnel expense D professional fee plus expenses

30. When the Architect as Environmental Planner is commissioned to do town and regional
planning or urban renewal projects, he performs the following except one:

undertakes environmental impact


identifies social behavior and interaction
assessment

prepares concept development plans undertakes demographic analysis

https://quizizz.com/print/quiz/5b555dc5e96b6f00192d81ce 5/
10
8/4/23, 3:33 PM PROFESSIONAL PRACTICE 1

31. Equivalent of Petty Cash Fund in Construction

A Emergency Fund B Project Fund

C Non-listed D Revolving Fund

32. Aside from the owner, who else can suspend construction work?

A Project Manager B Architect

C Contractor D Engineer

33. List of defects found by the architect during final inspection

A Defect List B Punch List

C non-listed D Record of Defects

34. How many elevators are needed for a four storey building

A 0 B 2

C 3 D 1

35. Government Agency which recognizes Architecture schools

A TESDA B CHED

C DEPED D UAP

36. Architecture graduates can take the Board Exam conditionally


after the board exam.

A TRUE B FALSE

C MAYBE DIN SOME


OCCASSION
Keyword : conditionally <----- yes, because you must have at least 2 years diversified experience
with a minimum 3840 hours apprenticeship under a duly licensed architect.

https://quizizz.com/print/quiz/5b555dc5e96b6f00192d81ce 6/
10
8/4/23, 3:33 PM PROFESSIONAL PRACTICE 1

37. ______________ is the payment for services rendered.

A WAGES B CHECK

C REMURATION D NON LISTED

It's Remuneration, not Remuration. IN ALE, the chances of getting a typo-error is 0% so be


careful in reading the questions

38. The UAP can revoke any professional license for a cause

A TRUE B FALSE

C MAYBE D IN SOME
OCCASSION

39. The Architect is selected by ______ method for a project.

A BIDDING B %CONSTRUCTIO
N COST
C REFERRAL D NON LISTED

40. The __________ is the main focus of Architect's services.

A Design & build B Construction

C Billing D Design Services

41. SPP 208 is____

Post-Construction Phase Regular Design Services

Pre-design services Architectural Design Competition

42. A compensation type is based on technical hours expended by consultants, technical staff, and
architects.

Professional Fee plus Expenses %CONSTRUCTION COST

Multiple of Direct personnel expenses Fixed Fee


https://quizizz.com/print/quiz/5b555dc5e96b6f00192d81ce 7/
10
8/4/23, 3:33 PM PROFESSIONAL PRACTICE 1

43. Programming is under the services of an architect.


Construction Post Construction

Pre Design Specialized Architectural Services

44. Minimum lot Area for Single Detached for Economic housing.
72 64

36 22

45. Minimum lot Area for Single Detached for Socialized housing.
72 64

36 22

46. Minimum frontage for a single detached corner lot for socialized housing.
8 6

2 4

47. The minimum lot frontage for various types of housing for both socialized and economic is the
same.
True False

Sometimes In some occasion

48. The maximum units per block or cluster for row housing.
20 15

30 40

49. If the block exceeds 250 meters, __________ will be provided at the midlength of the block.

Curve Alley

Carriage way Drainage

50. The minimum area requirement for a single-family dwelling (economic housing).
22 24

26 non listed

51. The minimum setback of the dwelling unit for both socialized and economic housing is not the
same.
True False

Sometimes In some occasion


https://quizizz.com/print/quiz/5b555dc5e96b6f00192d81ce 8/
10
8/4/23, 3:33 PM PROFESSIONAL PRACTICE 1

52. Building administrators are compensated based on.

Lump Sum % of construction cost

% of income % of gross monthly rentals

53. Substantial completion shall mean the value of the work completed is not.
Less than 90%, but not more than 97% Less than 98%

more than 90% but not less than 98% non listed

54. _______ is the penalty for unpaid due Professional fee within the contract time.

interest payment penalty

liquidated damages surcharge

55. _____ of the Professional fee is paid when construction is completed.


65% 85%

90% 100%

56. Is the instructions that supplements or modify drawings, specs. & general conditions of the
contract.
Special Provisions Supplementary Specs

Drawings Specifications

57. Owner shall furnish contractor ____ sets of drawing and specs for free.
5 2

6 3
According to SPP 301 article 3

58. The contractor prepares at his own expense and submit _____ copies of all shop drawings to
the architect.

2 3

4 non listed

59. Computation of contract time shall commence on the ___ day from the receipt of the notice to
proceed.
5th 7th

10th 15th
https://quizizz.com/print/quiz/5b555dc5e96b6f00192d81ce 9/
10
8/4/23, 3:33 PM PROFESSIONAL PRACTICE 1

60. The contractor will notify the building official ______ days prior; stopping, resuming, termination
of construction.
7 10

15 45

61. How many years of validity does an Architect’s Certificate of registration have?
1 2

3 Lifetime

62. The only Juridicial Persone under the Philippine law and Jurispudence
Architect Contractor

Engineers Architectural Firm

63. What year did the latest code of Ethical Conduct for Architects get published?
2004 2005

2006 2007

64. What article and section in the RA 9266 does the standards of professional practice (spp) fall
into?
Article 5, Section 40 Article 5, Section 41

Article 6, Section 40 Article 6, Section 41

65. What section in RA 9266 is the rating in the licensure examination?


Section 15 Section 16

Section 17 Section 18

https://quizizz.com/print/quiz/5b555dc5e96b6f00192d81ce 10/
10

You might also like