1. A scientific study on the built of construction who assumes
environment's well-being, which liability
allows the Architect to focus on the b. Yes, the AoR assumes the civil
ways in which the building/structure liability
can best maintain itself and prolong its c. No, it’s the Design Engineer who
life in a cost-efficient manner, and is liable
finally provide recommendations to d. None of the above
the Owner/ Client. 6. Who does the architect approach for
a. Post- design Services sound control?
b. Building Appraisal a. Electronics Engineer
c. Forensic Architecture b. Electrical Engineer
d. Pre- design Services c. Acoustic Engineer
2. Who prepares schedule for submission d. DJ
of detail and shop drawings. 7. Which among the following should
a. Owner and architect the architect's fee NOT be based?
b. Architect and contractor a. Project Construction Cost
c. Owner and contractor b. Labor Cost
d. Architect c. Client’s Profile Directory
3. For specialized allied services, what is d. Contractor’s fee
the aesthetic designing of the space of 8. A client wanted your services for his
a structure? new house with a total project cost of
a. Architectural Programming Three Million (3,000,000.00) Pesos.
Services Based on the old 1979 SPP, what is
b. Landscape Design Services the percentage of your professional
c. Space Planning Services fee?
d. Architectural Interior Services a. 15% of PCC
4. A type of Pre-Design Service where b. 8%
the Architect determines the adequate c. 12%
size and appropriate configuration and d. 10%
assemblage for a proposed project in 9. Includes cost of the construction as
consideration of the use, allocation well as allprofessional fees, permits,
and interface of spaces for given clearances and utilities and cost of
activities. This is done mainly through acquiring the project site / lot, cost of
primary data gathering such as money, etc.
interviews, consultations, interfaces, a. Project Construction Cost
focus group discussions (FGDs), space b. Project Development Cost
planning surveys, space audits, etc. c. Cost Records
and subsequent analyses i.e. spatial d. Cost of Work
layouts with stacking concepts, 10. What do you call Working Drawings,
specially for multi-storey structures. Specifications, Estimates and General
a. Special Management Studies Conditions?
b. Design Brief Preparation a. Project Manual
c. Space Planning b. Project Requirement
d. Architectural Programming c. Contract Documents
5. Will the Architect-of-Record be d. Construction Drawings
criminally liable with regards to the
Mock Exam Excerpt from www.architectureph.com
Prepared on 10-23-2017
11. If portions of the building/s are a. Architectural Lighting Services
erected at different periods of time, b. Architectural Lighting, Planning
thus increasing the construction period and Design Services
and Architect's burden of services, c. Architectural Lighting Layout
charges pertaining to services and design Services
rendered during the Construction d. Architectural Lighting
Phase shall be doubled. A suspension Transmission Design Services
of construction for a period not 16. If an architect performs full time
exceeding ___ months shall not be supervision, what is his professional
covered by this provision. fee based on old 1979 SPP?
a. 4 a. 2- 2.5% of PCC
b. 5 b. 1-1.5%
c. 6 c. 3-5%
d. 7 d. 2-3%
12. Refers to the orderly arrangement 17. What offense is committed when an
within a piece of land or property on architect is found using the seal of
which vertical structures such as another architect?
buildings, monuments and the like, as a. Misdemeanor
well as horizontal developments such b. Misrepresentation
as rights-of-way (ROWs), open spaces c. Nothing
and activity spaces are to be proposed. d. Illegal practice
a. Comprehensive Development Plan 18. It is the most common method of
b. Site Development Planning compensation which is also fair to
c. Physical Planning both client and architect?
d. Environmental Planning a. Professional fee plus Expenses
13. The Consulting Architect is concerned b. Multiple of Direct Expenses
with the management and use of land c. Lump Sum
as well as the conservation, d. Percentage Fee Method
preservation and upgrading of the 19. Can an Architect be the Architect-of-
human environment. Record and Architect-in-Charge of
a. Site Development Planning construction at the same time?
b. Physical Planning a. It depends on the type of project
c. Environmental Impact Assessment b. No, they should always be
d. Comprehensive Development different
Planning c. No, it is against the Civil Code
14. If an Architect assumes the function of d. Yes, it is possible
going to the project site for monitoring 20. NOT a criteria for computing the
and supervision, what services is Architect's compensation.
being provided? a. Time Availability
a. Construction Management b. Popularity
b. Construction Inspector c. Imagination
c. Project Supervision d. Effect
d. Full- time construction 21. Most simple type of scheduling
Supervision technique.
15. What type of service involves the a. Bar Chart
detailed planning and design of light b. PERT-CPM
transmission, timing and control for c. S- Curve
compatibility with the architectural d. Line Balance
design concept?
Mock Exam Excerpt from www.architectureph.com
Prepared on 10-23-2017
22. Who determines time and cost for the a. i, iii, iv
project? b. ii, iii, iv
a. Owner c. i, ii, iii
b. Construction Manager d. i, ii, iv
c. Contractor 28. The Breakdown of Work and
d. Project Manager Corresponding Value of the Contract
23. Build in, mount in position, connect, Amount which is used as basis for
apply for intended use. Request for Payment must be
a. Install submitted by the contractor how many
b. Fabricate days from receipt of the NTP?
c. Furnish a. 10 days
d. Provide b. 15
24. Doesn't represent work and doesn't c. 5
involve duration and cost; it only d. 7
serves as dependency connector or 29. An architect suggested to the client
sequence indicator. that a blank wall in one of the portion
a. Critical path of the lobby be provided with a mural
b. Slack painting. The client agreed and asked
c. Dummy activity the Architect to present a design for
d. Float the mural painting. The Architect
25. When a Client calls upon hired a popular painter to make the
the Architect to give oral or written concept design. Who will pay for the
advice and direction, to attend services of the mural painter?
conferences, to make evaluations and a. Client
appraisals regarding a contemplated b. To be decided by arbitration
project and similar activities, c. Architect
the Architect renders valuable inputs d. Already included in the fees of
whether or not the Client pursues the the architect
project. What Pre-Design Service is 30. The Architect in this area of practice
this? engages in methods of producing
a. Consultation building components in a highly
b. Evaluation engineered, efficient and cost-
c. Pre-feasibility Study effective manner, particularly for
d. Feasibility Study residential and commercial
26. If an Architect is hired to design a applications.
Supermarket with construction cost of a. Forensic Architecture
less than P50M, how much should b. Facilities maintenance and
he/she charge as minimum basic fee Support
based on the old 1979 SPP? c. Building Environment
a. 7% of PCC Certification
b. 6% d. Building Systems Design
c. 15% 31. The Client has already approved the
d. 8% designs of the typical house models
27. Structures belonging to Group 1 for a subdivision project. The
i. Hangars Architect continued with the
ii. Packaging and Processing preparation of the construction
Plants drawings. At this stage, the Client
iii. Industrial asked the Architect to prepare also
iv. Supermarket scale models of the different house
Mock Exam Excerpt from www.architectureph.com
Prepared on 10-23-2017
models to be used in selling the house 36. Guarantee to execute the work in
and lot packages. How will the accordance with the terms of the
Architect charge for them? contract.
a. It is a part of the design studies a. Performance bond
required for the presentation to the b. Proposal bond
client and no additional fee is to c. Payment bond
be charged d. Guarantee bond
b. It is already included in the 37. In a Full Detailed Architectural and
Architect’s basic fee. Engineering Design Services, this item
c. Determine the cost by arbitration is already included in the basic fees of
d. The cost for each scaled model the Architect.
will be charged in addition to the a. Communication specialty Systems
basic fee. design
32. What offense is committed if a person b. Acoustic design
uses the name of another architect in c. Electronic specialty systems
his practice without the consent of the design
latter? d. Air- conditioning systems design
a. Illegal practice 38. After an expiration of how many years
b. Nothing from the date of revocation and upon
c. Misdemeanour application and for reasons deemed
d. Misrepresentation proper and sufficient, reinstate the
33. Repairs and corrective work must be validity of a revoked certificate of
done by the contractor within how registration?
many days after written notice of a. 1
owner. b. 2
a. 15 days c. 3
b. 7 days d. 4
c. 10 days 39. Guarantee workmanship and quality
d. 5 days of materials and equipment for 1 year.
34. If there are two architects on a certain a. Payment Bond
project, the Architect-of-Record and b. Performance Bond
the Architect-in-Charge of c. Proposal Bond
construction, the building collapses, d. Guarantee Bond
who is more liable? 40. Printed description of work.
a. Architect- in- charge of a. Bid bulletin
construction b. Drawings
b. It depends on the investigation c. Specifications
c. Both will be liable d. General Conditions
d. Architect- of –record 41. If the Owner continuously order
35. Which condition does not correctly changes to the design, what methods
satisfy an architectural partnership? of compensation should be used?
a. All partners are registered a. Percentage fee and Cost method
architects b. Lump sum
b. A contractor and a lawyer c. Per diem and MDPE
c. Partners are registered architects d. MDPE and Percentage fee
and engineers 42. Structures belonging to Group 2
d. An architect and a businessman 1. Nursing Homes
2. Court houses
3. Public Health Centers
Mock Exam Excerpt from www.architectureph.com
Prepared on 10-23-2017
4. Exhibition Halls a. Bid bulletin
a. 1, 2, 3 b. Invitation to Bid
b. 1, 3, 4 c. Notice to Proceed
c. 1, 2, 4 d. Instruction to Bidders
d. 2, 3, 4 47. Archt. Steve explains his methodology
43. Is it possible for a person who earned to the selection committee regarding
a degree in Architecture to take up a how he would translate the
Master's degree in Architecture even if plan/design requirements of the
he has yet to become a board passer? proposed store renovation of CMG
a. Yes, if only he/ she is and honor store in Rockwell. Under what stage in
student. the comparative selection process is
b. Yes, a bachelor degree in this?
architecture is enough a. Negotiation
c. No, he/ she must pass the board b. Evaluation and Ranking
exam first. c. Verification
d. Maybe, depending on the d. Interview
admission requirement of the 48. This method of compensation is
school. frequently used where there is
44. The multiplier applied in the multiple continuing relationship involving a
of direct personnel expense depends series of projects. It establishes a fixed
on the following except one: sum over and above the
a. Experience of the Architect reimbursement for the Architect's
b. Complexity of the project technical time and overhead.
c. Office set up a. Lump sum or fixed fee
d. Cost of transportation b. Multiple of direct personnel
45. The Architect may be engaged as the expenses
Building Administrator and/or c. Professional fees plus expenses
Property Manager of a commercial, d. Per diem, honorarium plus
industrial, residential or institutional Reimbursable expenses
building, facility or complex to 49. NOT classified under Group 5 –
maximize the lifespan of the monumental buildings and other
building/s in order to produce the facilities requiring consummate design
maximum economic return. In skill and much precise detailing.
building maintenance, the Architect a. Mausoleums
shall: b. Memorials
a. Formulate and enforce rules for c. Exposition buildings
the proper use of the facility and d. Exhibition halls
the building, particularly in the 50. What is the percentage of payment for
common areas and the emergency/ construction management based on
egress/ exit areas. old 1979 SPP?
b. Monitor security services a. 2-2.5% of PCC
c. See to it that the building and all b. 3-5%
the parts thereof are in good c. 1-1.5%
condition. d. 1.5-3%
d. All of the above 51. Before submitting sketches to a client,
46. It is the notice or invitation issued to what must the architect first do?
bidders giving information on the a. Prepare the probable construction
magnitude and extent of the project, cost
nature, etc. b. Discuss board for presentation
Mock Exam Excerpt from www.architectureph.com
Prepared on 10-23-2017
c. Bill of payment an architectural firm commits
d. Sign a service agreement malpractice?
52. Guarantee to pay all obligations a. No, it is only the Architect- in-
arising from the contract. Record
a. Performance bond b. Maybe, if he also signs and seals
b. Payment bond the documents
c. Guarantee bond c. It is up to the court to decide
d. Proposal bond d. Yes, he will also be liable
53. What is the meaning of the acronym 57. In what phase of the architectural
IAPOA? design services does the feasibility
a. Integrated and Accredited study is conducted?
Philippine Organization of a. Comprehensive Architectural
Architects Services
b. Integrated and Accredited b. Specialized Allied Services
Professional Organization of c. Pre- Design Services
Architects d. Regular Design Services
c. Internationally Accredited 58. Who is responsible for the soil
Professional Organization of investigation of the project?
Architects a. Contractor
d. Integrated Association for b. Construction Manager
Professional Organization of c. Owner
Architects d. Project Manager
54. Project Development Cost shall 59. This cost-based method of
include: compensation is applicable only to
1. Construction non-creative work such as accounting,
Cost secretarial, research, data gathering,
2. Professional preparation of reports and the like.
Fees a. Fixed Fee/ Lump Sum Method
3. Permits b. Multiple of Direct Personnel
4. Lots Expense
Acquisitions c. Percentage Method
5. Clearances d. Professional Fee and Expenses
a. 1, 2, 3, 5 60. The Consulting Architect in this area
b. 1, 2, 3, 4 of practice provides the Owner/Client
c. 1, 2, 3, 4, 5 with means and measures to ensure
d. 1, 3, 4, 5 the proper function and maintenance
55. A type of Pre-Design Service wherein of the building/structure and site after
the Architect prepares a technique to final inspection.
minimize the negative effect of a. Forensic Architecture
simplified operations associated with b. Building Testing and
many cost-reduction programs. The Commissioning
goal is to achieve an unimpaired c. Facilities Maintenance and
program at minimum cost. Support
a. Design Brief Preparation d. Building Environment
b. Space Management Studies Certification
c. Value Management 61. Contract time starts how many days
d. Building Appraisal after receipt of Notice to Proceed.
56. Is a partner in an architectural firm a. 5 days
liable when an architect-of-record in b. 15
Mock Exam Excerpt from www.architectureph.com
Prepared on 10-23-2017
c. 10 d. by actual direct cost +15% profit,
d. 7 overhead and tax
62. A form of Specialized Allied Service 67. Who will be liable for seeking and
where the Architect prescribes space soliciting architectural works by a non
plans, stacking diagrams/sections and registered person?
computations of areas for the different a. The employer and the employee
activities and spaces to be integrated b. Both the represented and the
in a building Project. representative
a. Special Building/ Facility c. None of the above
Planning and Design d. All of the above
b. Building Systems Design 68. At what stage are specifications done?
c. Building Components a. Specifications phase
d. Architectural Interior b. Bidding/ negotiation Phase
63. A person found preparing architectural c. Contract Document Phase
plans without the necessary license is d. Construction Phase
guilty of what? 69. Method of selection of an Architect
a. Illegal Practice conducted by committees representing
b. Misdemeanor institutions, corporations or public
c. Misrepresentation agencies.
d. Nothing a. Direct selection
64. Upon signing the Architect-Owner b. Institutional Method
Agreement for Detailed Architectural c. Comparative Selection
and Engineering Design Services, d. Design Competition
what is the PRBoA suggested 70. Under comparative selection, what is
minimum payment to the Architect as the stage where the selection
a mobilization component of the committee visit buildings designed by
agreed Architect's fee? the Architects and check references
a. Php25, 000 such as former clients and financial
b. Php20, 000 institutions.
c. Php30, 000 a. Verification
d. Php15, 000 b. Negotiation
65. Which of the following is a c. Evaluation and Ranking
responsibility of the Architect in the d. Pre-qualification
Construction Phase of the Regular
Design Services?
a. Makes periodic visits to the site
b. Prepares shop drawings -----end----
c. Be held responsible for failure of
contractor to carry out work
d. Makes exhaustive on site
supervision
66. The value of extra work must NOTbe
calculated using this method.
a. by actual direct cost not exceeding ANSWERS:
25% of original work
1. C
b. by estimated in lump sum
2. B
c. by unit prices not exceeding 25%
3. D
of original work contract
4. C

Mock Exam Excerpt from www.architectureph.com


Prepared on 10-23-2017
5. B 54. C
6. C 55. C
7. C 56. D
8. D 57. C
9. B 58. C
10. C 59. B
11. C 60. C
12. C 61. D
13. D 62. D
14. D 63. B
15. C 64. A
16. B 65. A
17. A 66. A
18. D 67. A
19. D 68. D
20. B 69. C
21. A 70. C
22. A
23. A
24. C
25. A
26. A
27. C
28. B
29. A
30. D
31. D
32. D
33. D
34. B
35. B
36. A
37. D
38. B
39. D
40. C
41. A
42. B
43. B
44. D
45. D
46. B
47. C
48. C
49. D
50. D
51. D
52. B
53. B