This document contains a pre-test for the Standard Professional Practice (SPP) exam with multiple choice questions covering topics in architecture such as professional liability, pre-design services, fee structures, and construction documentation. It tests knowledge of an architect's roles and responsibilities regarding project planning, design, construction administration and professional compensation.
This document contains a pre-test for the Standard Professional Practice (SPP) exam with multiple choice questions covering topics in architecture such as professional liability, pre-design services, fee structures, and construction documentation. It tests knowledge of an architect's roles and responsibilities regarding project planning, design, construction administration and professional compensation.
This document contains a pre-test for the Standard Professional Practice (SPP) exam with multiple choice questions covering topics in architecture such as professional liability, pre-design services, fee structures, and construction documentation. It tests knowledge of an architect's roles and responsibilities regarding project planning, design, construction administration and professional compensation.
STANDARD PROFESSIONAL plans, projects, and contracts he
PRACTICE (SPP) PRE- TEST signed and sealed?
a. No, it’s the Architect- in- charge 1. A scientific study on the built of construction who assumes environment's well-being, which liability allows the Architect to focus on the b. Yes, the AoR assumes the civil ways in which the building/structure liability can best maintain itself and prolong its c. No, it’s the Design Engineer who life in a cost-efficient manner, and is liable finally provide recommendations to d. None of the above the Owner/ Client. 6. Who does the architect approach for a. Post- design Services sound control? b. Building Appraisal a. Electronics Engineer c. Forensic Architecture b. Electrical Engineer d. Pre- design Services c. Acoustic Engineer 2. Who prepares schedule for submission d. DJ of detail and shop drawings. 7. Which among the following should a. Owner and architect the architect's fee NOT be based? b. Architect and contractor a. Project Construction Cost c. Owner and contractor b. Labor Cost d. Architect c. Client’s Profile Directory 3. For specialized allied services, what is d. Contractor’s fee the aesthetic designing of the space of 8. A client wanted your services for his a structure? new house with a total project cost of a. Architectural Programming Three Million (3,000,000.00) Pesos. Services Based on the old 1979 SPP, what is b. Landscape Design Services the percentage of your professional c. Space Planning Services fee? d. Architectural Interior Services a. 15% of PCC 4. A type of Pre-Design Service where b. 8% the Architect determines the adequate c. 12% size and appropriate configuration and d. 10% assemblage for a proposed project in 9. Includes cost of the construction as consideration of the use, allocation well as allprofessional fees, permits, and interface of spaces for given clearances and utilities and cost of activities. This is done mainly through acquiring the project site / lot, cost of primary data gathering such as money, etc. interviews, consultations, interfaces, a. Project Construction Cost focus group discussions (FGDs), space b. Project Development Cost planning surveys, space audits, etc. c. Cost Records and subsequent analyses i.e. spatial d. Cost of Work layouts with stacking concepts, 10. What do you call Working Drawings, specially for multi-storey structures. Specifications, Estimates and General a. Special Management Studies Conditions? b. Design Brief Preparation a. Project Manual c. Space Planning b. Project Requirement d. Architectural Programming c. Contract Documents 5. Will the Architect-of-Record be d. Construction Drawings criminally liable with regards to the Mock Exam Excerpt from www.architectureph.com Prepared on 10-23-2017 11. If portions of the building/s are a. Architectural Lighting Services erected at different periods of time, b. Architectural Lighting, Planning thus increasing the construction period and Design Services and Architect's burden of services, c. Architectural Lighting Layout charges pertaining to services and design Services rendered during the Construction d. Architectural Lighting Phase shall be doubled. A suspension Transmission Design Services of construction for a period not 16. If an architect performs full time exceeding ___ months shall not be supervision, what is his professional covered by this provision. fee based on old 1979 SPP? a. 4 a. 2- 2.5% of PCC b. 5 b. 1-1.5% c. 6 c. 3-5% d. 7 d. 2-3% 12. Refers to the orderly arrangement 17. What offense is committed when an within a piece of land or property on architect is found using the seal of which vertical structures such as another architect? buildings, monuments and the like, as a. Misdemeanor well as horizontal developments such b. Misrepresentation as rights-of-way (ROWs), open spaces c. Nothing and activity spaces are to be proposed. d. Illegal practice a. Comprehensive Development Plan 18. It is the most common method of b. Site Development Planning compensation which is also fair to c. Physical Planning both client and architect? d. Environmental Planning a. Professional fee plus Expenses 13. The Consulting Architect is concerned b. Multiple of Direct Expenses with the management and use of land c. Lump Sum as well as the conservation, d. Percentage Fee Method preservation and upgrading of the 19. Can an Architect be the Architect-of- human environment. Record and Architect-in-Charge of a. Site Development Planning construction at the same time? b. Physical Planning a. It depends on the type of project c. Environmental Impact Assessment b. No, they should always be d. Comprehensive Development different Planning c. No, it is against the Civil Code 14. If an Architect assumes the function of d. Yes, it is possible going to the project site for monitoring 20. NOT a criteria for computing the and supervision, what services is Architect's compensation. being provided? a. Time Availability a. Construction Management b. Popularity b. Construction Inspector c. Imagination c. Project Supervision d. Effect d. Full- time construction 21. Most simple type of scheduling Supervision technique. 15. What type of service involves the a. Bar Chart detailed planning and design of light b. PERT-CPM transmission, timing and control for c. S- Curve compatibility with the architectural d. Line Balance design concept? Mock Exam Excerpt from www.architectureph.com Prepared on 10-23-2017 22. Who determines time and cost for the a. i, iii, iv project? b. ii, iii, iv a. Owner c. i, ii, iii b. Construction Manager d. i, ii, iv c. Contractor 28. The Breakdown of Work and d. Project Manager Corresponding Value of the Contract 23. Build in, mount in position, connect, Amount which is used as basis for apply for intended use. Request for Payment must be a. Install submitted by the contractor how many b. Fabricate days from receipt of the NTP? c. Furnish a. 10 days d. Provide b. 15 24. Doesn't represent work and doesn't c. 5 involve duration and cost; it only d. 7 serves as dependency connector or 29. An architect suggested to the client sequence indicator. that a blank wall in one of the portion a. Critical path of the lobby be provided with a mural b. Slack painting. The client agreed and asked c. Dummy activity the Architect to present a design for d. Float the mural painting. The Architect 25. When a Client calls upon hired a popular painter to make the the Architect to give oral or written concept design. Who will pay for the advice and direction, to attend services of the mural painter? conferences, to make evaluations and a. Client appraisals regarding a contemplated b. To be decided by arbitration project and similar activities, c. Architect the Architect renders valuable inputs d. Already included in the fees of whether or not the Client pursues the the architect project. What Pre-Design Service is 30. The Architect in this area of practice this? engages in methods of producing a. Consultation building components in a highly b. Evaluation engineered, efficient and cost- c. Pre-feasibility Study effective manner, particularly for d. Feasibility Study residential and commercial 26. If an Architect is hired to design a applications. Supermarket with construction cost of a. Forensic Architecture less than P50M, how much should b. Facilities maintenance and he/she charge as minimum basic fee Support based on the old 1979 SPP? c. Building Environment a. 7% of PCC Certification b. 6% d. Building Systems Design c. 15% 31. The Client has already approved the d. 8% designs of the typical house models 27. Structures belonging to Group 1 for a subdivision project. The i. Hangars Architect continued with the ii. Packaging and Processing preparation of the construction Plants drawings. At this stage, the Client iii. Industrial asked the Architect to prepare also iv. Supermarket scale models of the different house Mock Exam Excerpt from www.architectureph.com Prepared on 10-23-2017 models to be used in selling the house 36. Guarantee to execute the work in and lot packages. How will the accordance with the terms of the Architect charge for them? contract. a. It is a part of the design studies a. Performance bond required for the presentation to the b. Proposal bond client and no additional fee is to c. Payment bond be charged d. Guarantee bond b. It is already included in the 37. In a Full Detailed Architectural and Architect’s basic fee. Engineering Design Services, this item c. Determine the cost by arbitration is already included in the basic fees of d. The cost for each scaled model the Architect. will be charged in addition to the a. Communication specialty Systems basic fee. design 32. What offense is committed if a person b. Acoustic design uses the name of another architect in c. Electronic specialty systems his practice without the consent of the design latter? d. Air- conditioning systems design a. Illegal practice 38. After an expiration of how many years b. Nothing from the date of revocation and upon c. Misdemeanour application and for reasons deemed d. Misrepresentation proper and sufficient, reinstate the 33. Repairs and corrective work must be validity of a revoked certificate of done by the contractor within how registration? many days after written notice of a. 1 owner. b. 2 a. 15 days c. 3 b. 7 days d. 4 c. 10 days 39. Guarantee workmanship and quality d. 5 days of materials and equipment for 1 year. 34. If there are two architects on a certain a. Payment Bond project, the Architect-of-Record and b. Performance Bond the Architect-in-Charge of c. Proposal Bond construction, the building collapses, d. Guarantee Bond who is more liable? 40. Printed description of work. a. Architect- in- charge of a. Bid bulletin construction b. Drawings b. It depends on the investigation c. Specifications c. Both will be liable d. General Conditions d. Architect- of –record 41. If the Owner continuously order 35. Which condition does not correctly changes to the design, what methods satisfy an architectural partnership? of compensation should be used? a. All partners are registered a. Percentage fee and Cost method architects b. Lump sum b. A contractor and a lawyer c. Per diem and MDPE c. Partners are registered architects d. MDPE and Percentage fee and engineers 42. Structures belonging to Group 2 d. An architect and a businessman 1. Nursing Homes 2. Court houses 3. Public Health Centers Mock Exam Excerpt from www.architectureph.com Prepared on 10-23-2017 4. Exhibition Halls a. Bid bulletin a. 1, 2, 3 b. Invitation to Bid b. 1, 3, 4 c. Notice to Proceed c. 1, 2, 4 d. Instruction to Bidders d. 2, 3, 4 47. Archt. Steve explains his methodology 43. Is it possible for a person who earned to the selection committee regarding a degree in Architecture to take up a how he would translate the Master's degree in Architecture even if plan/design requirements of the he has yet to become a board passer? proposed store renovation of CMG a. Yes, if only he/ she is and honor store in Rockwell. Under what stage in student. the comparative selection process is b. Yes, a bachelor degree in this? architecture is enough a. Negotiation c. No, he/ she must pass the board b. Evaluation and Ranking exam first. c. Verification d. Maybe, depending on the d. Interview admission requirement of the 48. This method of compensation is school. frequently used where there is 44. The multiplier applied in the multiple continuing relationship involving a of direct personnel expense depends series of projects. It establishes a fixed on the following except one: sum over and above the a. Experience of the Architect reimbursement for the Architect's b. Complexity of the project technical time and overhead. c. Office set up a. Lump sum or fixed fee d. Cost of transportation b. Multiple of direct personnel 45. The Architect may be engaged as the expenses Building Administrator and/or c. Professional fees plus expenses Property Manager of a commercial, d. Per diem, honorarium plus industrial, residential or institutional Reimbursable expenses building, facility or complex to 49. NOT classified under Group 5 – maximize the lifespan of the monumental buildings and other building/s in order to produce the facilities requiring consummate design maximum economic return. In skill and much precise detailing. building maintenance, the Architect a. Mausoleums shall: b. Memorials a. Formulate and enforce rules for c. Exposition buildings the proper use of the facility and d. Exhibition halls the building, particularly in the 50. What is the percentage of payment for common areas and the emergency/ construction management based on egress/ exit areas. old 1979 SPP? b. Monitor security services a. 2-2.5% of PCC c. See to it that the building and all b. 3-5% the parts thereof are in good c. 1-1.5% condition. d. 1.5-3% d. All of the above 51. Before submitting sketches to a client, 46. It is the notice or invitation issued to what must the architect first do? bidders giving information on the a. Prepare the probable construction magnitude and extent of the project, cost nature, etc. b. Discuss board for presentation Mock Exam Excerpt from www.architectureph.com Prepared on 10-23-2017 c. Bill of payment an architectural firm commits d. Sign a service agreement malpractice? 52. Guarantee to pay all obligations a. No, it is only the Architect- in- arising from the contract. Record a. Performance bond b. Maybe, if he also signs and seals b. Payment bond the documents c. Guarantee bond c. It is up to the court to decide d. Proposal bond d. Yes, he will also be liable 53. What is the meaning of the acronym 57. In what phase of the architectural IAPOA? design services does the feasibility a. Integrated and Accredited study is conducted? Philippine Organization of a. Comprehensive Architectural Architects Services b. Integrated and Accredited b. Specialized Allied Services Professional Organization of c. Pre- Design Services Architects d. Regular Design Services c. Internationally Accredited 58. Who is responsible for the soil Professional Organization of investigation of the project? Architects a. Contractor d. Integrated Association for b. Construction Manager Professional Organization of c. Owner Architects d. Project Manager 54. Project Development Cost shall 59. This cost-based method of include: compensation is applicable only to 1. Construction non-creative work such as accounting, Cost secretarial, research, data gathering, 2. Professional preparation of reports and the like. Fees a. Fixed Fee/ Lump Sum Method 3. Permits b. Multiple of Direct Personnel 4. Lots Expense Acquisitions c. Percentage Method 5. Clearances d. Professional Fee and Expenses a. 1, 2, 3, 5 60. The Consulting Architect in this area b. 1, 2, 3, 4 of practice provides the Owner/Client c. 1, 2, 3, 4, 5 with means and measures to ensure d. 1, 3, 4, 5 the proper function and maintenance 55. A type of Pre-Design Service wherein of the building/structure and site after the Architect prepares a technique to final inspection. minimize the negative effect of a. Forensic Architecture simplified operations associated with b. Building Testing and many cost-reduction programs. The Commissioning goal is to achieve an unimpaired c. Facilities Maintenance and program at minimum cost. Support a. Design Brief Preparation d. Building Environment b. Space Management Studies Certification c. Value Management 61. Contract time starts how many days d. Building Appraisal after receipt of Notice to Proceed. 56. Is a partner in an architectural firm a. 5 days liable when an architect-of-record in b. 15 Mock Exam Excerpt from www.architectureph.com Prepared on 10-23-2017 c. 10 d. by actual direct cost +15% profit, d. 7 overhead and tax 62. A form of Specialized Allied Service 67. Who will be liable for seeking and where the Architect prescribes space soliciting architectural works by a non plans, stacking diagrams/sections and registered person? computations of areas for the different a. The employer and the employee activities and spaces to be integrated b. Both the represented and the in a building Project. representative a. Special Building/ Facility c. None of the above Planning and Design d. All of the above b. Building Systems Design 68. At what stage are specifications done? c. Building Components a. Specifications phase d. Architectural Interior b. Bidding/ negotiation Phase 63. A person found preparing architectural c. Contract Document Phase plans without the necessary license is d. Construction Phase guilty of what? 69. Method of selection of an Architect a. Illegal Practice conducted by committees representing b. Misdemeanor institutions, corporations or public c. Misrepresentation agencies. d. Nothing a. Direct selection 64. Upon signing the Architect-Owner b. Institutional Method Agreement for Detailed Architectural c. Comparative Selection and Engineering Design Services, d. Design Competition what is the PRBoA suggested 70. Under comparative selection, what is minimum payment to the Architect as the stage where the selection a mobilization component of the committee visit buildings designed by agreed Architect's fee? the Architects and check references a. Php25, 000 such as former clients and financial b. Php20, 000 institutions. c. Php30, 000 a. Verification d. Php15, 000 b. Negotiation 65. Which of the following is a c. Evaluation and Ranking responsibility of the Architect in the d. Pre-qualification Construction Phase of the Regular Design Services? a. Makes periodic visits to the site b. Prepares shop drawings -----end---- c. Be held responsible for failure of contractor to carry out work d. Makes exhaustive on site supervision 66. The value of extra work must NOTbe calculated using this method. a. by actual direct cost not exceeding ANSWERS: 25% of original work 1. C b. by estimated in lump sum 2. B c. by unit prices not exceeding 25% 3. D of original work contract 4. C
Mock Exam Excerpt from www.architectureph.com
Prepared on 10-23-2017 5. B 54. C 6. C 55. C 7. C 56. D 8. D 57. C 9. B 58. C 10. C 59. B 11. C 60. C 12. C 61. D 13. D 62. D 14. D 63. B 15. C 64. A 16. B 65. A 17. A 66. A 18. D 67. A 19. D 68. D 20. B 69. C 21. A 70. C 22. A 23. A 24. C 25. A 26. A 27. C 28. B 29. A 30. D 31. D 32. D 33. D 34. B 35. B 36. A 37. D 38. B 39. D 40. C 41. A 42. B 43. B 44. D 45. D 46. B 47. C 48. C 49. D 50. D 51. D 52. B 53. B Mock Exam Excerpt from www.architectureph.com Prepared on 10-23-2017