ABBREVIATIONS
Abbreviations For
Rs or RS : Indian Rupees
LS or L.S or SUM : Lump Sum
Nr. or No. or Nos : Number(s)
Lm or LM or lm or Rm : Linear meter of Running meter
M : Meter
KM or km : Kilometer
hct. or Hct : Hectare
m2 or sq.m or sqm : Square meter
cum or cu.m or Cum : Cubic meter
cc. or c or cu.cm or cucm : Cubic centimeter
cum.km. or cum km : Cubic meter kilometer
KG or kg or Kg : Kilogram
mt or t or T or tonne : Metric Tonne
HP : Horse Power
PS : Provisional Sum
IRC : Indian Roads Congress
MORTH Specification(s) : Specifications for Road and Bridge Works
(Fourth Revision) issued by the Ministry of
SurfaceTransport (Roads Wing),
Government of India, now renamed
Ministry of Road Transport and Highways
(MORTH).
BIS : Bureau of Indian Standards
IS : Indian Standard
P.O.L or POL : Petroleum, Oil and Lubricants
Veh. Month : Vehicle month
The Appendix forms part of Bid. Bidders are required to fill up all the blanks in the form of Bid and
Appendix thereto)
Having examined the site of works and Bid Documents, comprising Instructions to Bidders,
Scope of works, Conditions of Contract, Technical Specifications, Bill of Quantities and
schedules for the execution of the above named works, we, the undersigned offer to
execute and complete such works and remedy any defects therein in conformity with the said
bid documents at percentage (in figures)
(in words) below /
above the estimated rate entered in the Volume-II (Bill of Quantities showing items of works
to be carried out) all in accordance with the said Bid documents.
2. We undertake, if our Bid is accepted, to commence the work within fifteen (15) days of receipt
of the order to commence, and to complete and deliver the sections and whole of the works
comprised in the Contract within the period stated in the bid here to.
3. If our Bid is accepted, we will furnish Performance Security (i.e.) in the form of a Bank
Guarantee to be jointly and severally bound on us, in accordance with the Conditions of Contract.
4. We agree to abide by this Bid for the period of One Hundred &Twenty (120) days from the last
date fixed for Bid Submission and it shall remain binding upon us and may be accepted at any
time before the expiry of that period.
5. We confirm our agreement to treat the Bid documents and other records connected with the
works as secret and confidential documents and shall not communicate information contained
therein to any person other than the person authorized by the Employer or use such information
in any manner prejudicial to the safety and integrity of the works.
6. Unless and until an agreement is prepared and executed, this Bid, together with your written
acceptance thereof, shall constitute a binding Contract between us, but without prejudice to your
right to withdraw such acceptance without assigning any reasons thereof.
7. We understand that you are not bound to accept the lowest or any bid you may receive.
Dated this day of 2023
Signature in the capacity of duly authorized**
To sign Bid for and on behalf of
(In block capital letters)
Address:
Signature of Witness
Name of witness
Address of witness
** Certified copy of Power of Attorney/authorization for signature shall be furnished by the bidder.
BILL OF QUANTITIES
PREAMBLE
1. The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, Conditions of
Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional and are given to provide a
common basis for bidding. The basis of payment will be the actual quantities of work ordered and
carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and
prices bided in the priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities, except in so far as it is otherwise
provided under the Contract, include all constructional plant, labour, supervision ,materials, all
temporary works and false works, erection, maintenance, establishment and overhead charges, profit,
taxes and duties and levies and other charges together with all general risks, liabilities and obligations
set out or implied in the Contract and including remedy of any defects during the Defects Liability
Period.
4. The rates and prices shall be quoted entirely in Indian Rupees.
5. The whole cost of complying with the provisions of the Contract shall be included in the items
provided in the priced Bill of Quantities.
6. General directions and descriptions of work and materials are not necessarily repeated or summarized
in the Bill of Quantities. Reference to the relevant sections of the contract documentation shall be
made before entering rates or prices against each item in the Bill of Quantities.
7. The method of measurement of completed work for payment shall be in accordance with the
provisions of MORT&H specification for Road and Bridge works (Fifth Revision) published by
Indian Road Congress, New Delhi and its project specific amendments mentioned in the Technical
Specifications, Section IV Volume 2.
8. Errors will be corrected by the Employer for any arithmetical errors pursuant to Clause 28 of the
Instructions to Bidders, Section I Volume 1.
9. Rock is defined as all materials, which, in the opinion of the Engineer, require blasting, or the use of
metal wedges and sledgehammers, or the use of compressed air drilling for its removal, and which
cannot be extracted by ripping with a tractor of at least 110 KW with a single rear mounted heavy-
duty ripper.
Annexure: A
Gandhidham
(Kandla) - Mundra
1 Port Section (Km 0.00 Safety Improvement (Engg Works) 4,26,08,860
to Km 71.400) of NH -
8A (Extn)
Miscellaneous 17,86,535
TOTAL 8,68,77,058
Part 1 – Road Maintenance
Rate (in
Item Rs.) Amount (in
Description of Items (As Modified) Unit Quantity
No. Excluding Rs.)
GST
Maintenance of unpaved shoulders and slopes on
both sides of the carriageway including the
shoulders of service road, if any. It includes
removal of Rank vegetation/weeds,
Blading/grading at the required camber using motor
grader , Providing spot reconditioning
,reconstruction and regravelling to repair specific
erosion or other damages for restoring the eroded
area to originally constructed cross section on cuts
and fills slopes/ shoulders conforming to Technical
Specifications clause no. 3002, 3003. The work also
include disposal of surplus material outside ROW
1.1 Km./Month 841.80 11594.1 97,59,918.70
and addition of selected soil conforming to
Technical Specifications clause no. 305 brought
from borrow areas located outside ROW. It
includes cleaning of dust/dirt from existing
MBCB/Guard Rail etc. with water and detergent
within ROW. It also includes routine maintenance
such as cleaning/straightening of all type of road
signs including Gantries, road studs and delineators
etc. and also removal of unauthorized boards
within ROW including transportation to nearest
suitable location and as directed by the Engineer-in-
charge.
Removal of rank vegetation/weeds and undesirable
vegetation from Toe line of embankment slopes to
ROW complete in all respect including breaking of
1.2 (a) Sqm. 577404.0 4.33 25,00,365.54
clods,rough dressing and disposal of waste material
and vegetation at a place outside ROW as per
direction of Engineer-In-Charge.
Maintenance of median by removing weeding,
cleaning, levelling and dressing of median,
uprooting and removal of weeds, cutting grass,
disposal of all muck outside ROW regularly to keep
the median clean and neat condition. The job also
1.2 (b) includes the cleaning and removal of spilled over Sqm 2,43,808.00 4.33 10,55,568.04
earth from median to main carriageway in the
portion adjacent to the kerbs all along the median
besides cleaning of longitudinal and cross drains in
the median. The operation of maintenance in
addition to above will also cover
Providing & laying 300 mm thick stone pitching
covering the slopes of guide bunds/road
embankments or other location over a layer of 200
1.3 Cum 264.00 929.46 2,45,378.57
mm granular material filter conforming to MOST
Specification Clause No. 2504 complete in all
respect as directed by the Engineer-in-charge.
Restoration/Repair to grouted stone pitching/Apron
with 1:3 cement sand mortar over the already
prepared surface /slopes of guide bunds, river
1.4 training works, and road embankments as per Cum 264.00 929.46 2,45,378.57
MOST section 2500 complete in all respect as
directed by Engineer-in-charge. Procurement of
material etc.
Providing 250 mm thick grouted stone pitching
/apron with 1:3 cement sand mortar over the
already prepared surface/slopes of guide bunds,
1.5 Cum. 200.00 929.46 1,85,892.86
river training works, and road embankments as per
MOST section 2500 complete in all respects as
directed by Engineer.
Clearing road side/Median open lined/ pucca
drains/covered drains/piped drains including
Manholes, gratings, channels and Galis etc. of all
sizes and bring them to original shape, drainage
capacity incuding disposal of sediments,
extraneous debris & vegetation growth blocking
1.6 the free flow from site outside ROW with all leads RM 86,720.00 18.56 16,09,523.20
and lifts complete in all respects as directed by the
Engineer in charge and as per Additional
Maintenance Standard clause no. 6.12.1.
(Frequency of cleaning in urban areas will be
quarterly whereas in rural areas it will be twice in
year i.e. before and after monsoon).
Clearing slab/ box type culverts and pipe culverts
including clearing, cleaning and reshapping of
upstream and down stream faces of these culverts
with in right of way. The job includes disposal of
1.7 excess material recovered from site including
vegetation outside ROW with all leads and lifts
complete in all respect as per direction of Engineer
In-Charge. (Frequency of cleaning will be before
and after monsoon).
(B) Rural area (Frequency of cleaning once in a month). Km./Month 680.00 2,000.00 13,60,000.00
Providing localised repair to rutted portion of
bituminous surface at scattered locations by
applying tack coat as per technical specification
Clause 503 and then filling the depression with
1.10 Cum 30.00 6,265.00 1,87,950.00
bituminous concrete by using paving grade
bitumen conforming to technical specification
Clause no. 507, complete in all respect as directed
by the Engineer.
Providing localised repair to broken edges of
carriageway at scattered locations by applying tack
coat as per technical specification Clause 503 and
then repairing the broken edges with bituminous
1.11 Cum 30.00 6,265.00 1,87,950.00
concrete by using paving grade bitumen
conforming to technical specification Clause no.
507, complete in all respect as per direction of the
Engineer.
Providing sealing to cracks less than 3mm wide or
incipient fretting or disintegration in an existing
bituminous surface at scattered locations after
1.12 sweeping the surface clean and dry, applying tack Sqm. 120.00 26.00 3,120.00
coat of emulsified bitumen complete as per
Technical Specification Clause No.-3004.3 and as
per satisfaction of the Engineer-in-charge.
Rate (in
Item Rs.) Amount (in
Description of Items (As Modified) Unit Quantity
No. Excluding Rs.)
GST
Maintenance of existing plants.
Maintenance of median and the existing plants in it
(with a density of 333/666 plants per km.
depending upon the width of the Median) by basin
making, weeding-hoeing, cleaning, levelling and
dressing of median, uprooting and removal of
weeds, cutting grass, disposal of all muck outside
ROW regularly to keep the median clean and
2.2 plantation in healthy and good condition. The job Km./month 742 9730 7218103.2
also includes the cleaning and removal of spilled
over earth from median to main carriageway in the
portion adjacent to the kerbs all along the median
besides cleaning of longitudinal and cross drains in
the median. The operation of maintenance in
addition to above will also cover and include the
following activities:-
a) waterng of each plant as and when required
depending upon the climatic conditions of the
locality/region/ season /strictly as per direction of
engineer in charge.The main requirements is to
keep the plants and shrubs in healthy ,good and
surviving condition. The casuality damage to any
plants/ shrubs during the maintenance will be the
entire responsibility of the contractor and the
contractor shall replace the dead and damaged
plants /shrubs at his own cost with new plants of
the same species ,varities age and size etc
b)application of fym or sludge @1/2 cuft or 10
kg/plant two times a year during febraury/march
and october/november plus 20 grams of
npk(12:32:16) or bonemeal per plants two times a
year as detailed above
c)application of insecticide /pesticide/fungicide etc
for control of insects pests and diseases as and
when required as per direction of engineer
d)training and pruning of all shrubs /plants as and
when required to give them required shape, size
and spread.
e)replacement of dead, damaged plants from the
median by healthy and well developed plant of
similar species, varieties, age and size etc , within
10 days of occurrence of casuailty as noticed /
reported or as directed by engineer.In case, plant is
not replaced as specific above, a penalty of rs
1000/- per plant will be imposed
NOTE :-The quoted rates shall be adjusted as per
actual density of plants per Km at site and the
maintenance of newly planted plants shall be
accounted for under this item
Painting with higloss synthetic enemal paint two
coats to give an even and smooth surface for
protection of exposed concrete/masonary portion
2.5
of Bridges/CD works/ parapet, kerb painting and
repairing wherever necessary, complete as per
approval of Engineer.
A Old existing surface Sqm 26200 63 1637500
Carrying out repair to road signs including
strengthening resetting or otherwise repairing signs
made out of Retro Reflective sheets. Job includes
patch repair to aluminium sheet, R R Sheet, posts,
2.6 signs / script and repainting of posts at damaged
location / positions with approved quality of
enamel paint complete in all respect conforming to
respective IRC/MOST specifications and as
directed by Engineer-in-charge.
A Road sign Boards mounted on single post. No. 120 770 92400
Rate (in
Item Rs.)
Description of Items (As Modified) Unit Quantity Amount, Rs
No. Excluding
GST
Removing all types of broken down/vehicles
which have met with accidents from the
carriageway and toeing the same to proper
locations i.e. nearest Police stations or some Two Crane
4.1 24 266400 6393600
suitable location by using 15 tonne or of more Per Month
capacity pick and carry crane, as per clause 6.4
of Scope of Work and as per Clause 6.8
'Performance Standard' of scope of work.
Providing and supply of Following manpower
4.2 for misc. work as when required basis as per
instruction of the Engineer.
A Mate/ Supervisor Per Day 50 311 15544.64286
B Helper/Beldar/ Coolie Per Day 50 318 15901.78571
C Security Guard Per Day 50 311 15544.64286
Providing, running and maintaining route patrol
vehicle as per clause 6.4 of scope of work and
as per clause 6.8 'Performance Standard' of
scope of work. It also includes removal of dead Two vehicle
4.3 24 143053 3433272
animals lying on highways and burrying them at per Month
propoer safe location out of ROW. It will be
incidental to this work. Payment will be made as
defined in Clause 6.8 of Scope of Work.
Provision of Ambulance as per clause 6.4 of
scope of work and as per clause 6.8
'Performance Standard' of scope of work. ( Each vehicle
4.4 0 0 0
Ambulance service may be de-scoped by NHAI per Month
at any stage/time as per NHAI Circular/Policy
guidelines)
Setting up of control room (24x7) along the
higway with round the clock depoloyment of
atleast one Manager. Phone Nos. of control
room will be displayed on the highway at every
4.5 Per Month 12 79111 949332
5 km. It will coordinate all the acitivities of
incident management vehicles. It will maintain /
generate VTS report and other reports related to
incident management operations.
Supply of colour photographs(60 Nos. A4 size
per month) in three copies and two CDs
4.6 Per set 12 1000 12000
complete as per Technical specification clause
125
Supply of Video Cassette (CD) in three copies
including videography of complete stretch at
4.7 Per set 3 5000 15000
three stages in O&M period complete as per
Technical specification clause 126
(ii) At Premium
[Figures/words] _______________________ % above on the Grand of the Project Cost as given
above.
(iii) At discount
[Figures/words] ___________________________% below on the Grand of the Project Cost as given
above.