Professional Documents
Culture Documents
Title: Calculate “Basic Time” and “Standard Time” for a given activity (Fan Assembly and
Disassembly) and find the “Rating” of the worker. .................................................................... 2
Objective: .................................................................................................................................... 2
Apparatus: ................................................................................................................................... 2
Problem statement:...................................................................................................................... 3
Safety Precautions:...................................................................................................................... 3
Procedure: ................................................................................................................................... 3
Table of Figures
Figure 1: Labelled apparatus picture............................................................................................... 2
List of Tables
Table 1: Observation and calculation ............................................................................................. 3
Page | 1
Experiment No. 2:
Title: Calculate “Basic Time” and “Standard Time” for a given activity (Fan Assembly and
Disassembly) and find the “Rating” of the worker.
Objective:
• To determine the Average Rating of worker
• To compare the two methods in terms of the time-study method.
• To study the importance of the work-study method.
• To measure the time required to do the job for a qualified worker and hence to establish
the standard time.
• To suggest a better alternative method to enhance productivity by having less standard
time.
Apparatus:
1. Wings
2. Motor
3. Strip
4. Cap
5. Screw driver
6. Clamp with screw Wings Motor
Strip
Cap
Clamp with
screw
Screw driver
Page | 2
Problem statement:
In industrial engineering, the main objective is to enhance productivity. It demands a higher
production rate with better product quality. For this purpose, the work-study is done. The work
study is further conducted in two parts, time study and motion study. The time study method
evaluates how long it takes on average for an employee to complete a given task. This time study
is different for the same task performed by different methods. The best method is the one that is
done safely with a higher accuracy rate.
Safety Precautions:
• Wear safety gloves to protect yourself from the sharp edges of a screwdriver.
• Place the apparatus in the middle of the table to eliminate the risk of falling the apparatus
on your feet.
• Wear covered shoes as advised during lab performance.
• Assemble or disassemble the apparatus carefully so that your finger may not get hurt.
Procedure:
• After taking account of safety precautions place the fan apparatus in front of yourself on
the table.
• Start the stopwatch once you are ready to perform.
• It’s your choice either to perform assembly first or the disassembly method.
• Pick up the parts one by one from the table and assemble them all in a complete manner.
Make sure you follow a sequence while doing the task to improve your rating.
• Measure the time taken in completing the task. This will be your observed time.
• Repeat the experiment for the rest of your group mates.
• Follow the reverse procedure for doing the disassembly method.
Page | 3
2020-IM-14 16.27 117.7
2020-IM-33 20.2 95.5
Disassembly 2020-IM-4 15.07 95 14.23 16.21
99.94 ×
2020-IM-7 10.8 124 100
2020-IM-11 14 101 = 14.22
2020-IM-24 15.67 90
2020-IM-14 15.74 89.7
2020-IM-33 12.6 110
There must be a stand-like object having boxes for each part specifically in front of the performer
so that the performer feels well to pick up each part from the table stand.
Page | 4