Standard HSSE Contractor Qualification
Standard HSSE Contractor Qualification
32
BP AKR CODE 5.32
BP AKR STANDARD
OHSAS 18001:2007 4.3.2; 4.4.2; 4.4.6
Supersede -
Revision No. 00
HSE CONTRACTOR QUALIFICATION
Effective Date 01 Jan 2018
Prepared: Approval:
Health, Safety, Security and Environment Vice President Director President Director
1. PURPOSE
This standard is developed to keep minimum requirements of health, safety and environment (HSE) that must be
in place pertaining to the presence and the activity of a contractor(s) within BP AKR work area.
2. SCOPE
2.1. This standard addresses the minimum requirements of health, safety and environment (HSE) aspects
that all contractor(s) of BP AKR must comply with.
2.2. This standard applies to:
a. BP AKR Business Units, Partnership and Contractor Companies who work at BP AKR work area.
b. Employees and other individuals (including temporary employees and contractor personnel),
company’s visitors, or any other person(s) who work and/or are present in the workplace.
4. STANDARDS OF PERFORMANCE
GENERAL REQUIREMENTS
4.1 Each Contractor shall successfully pass an HSE selection process prior to being considered for any
contracts with BP AKR.
4.2 At minimum, any Contractors working at BP AKR work area shall ensure the following
requirements are in place within their HSE Program:
1
a. Establish HSE Programs for the safety of the project(s), equipment and employees, which are at least
as stringent as BP AKR HSSE Management System.
b. Comply with all applicable GOI HSE legislations and shall be responsible for following all
recommended practices by GOI Chief Inspector of the Department of Energy and Mineral
Resources (DEMR).
c. Provide to BP AKR the name(s) designated to be the Contact Person(s) while on BP AKR premises.
The designated Contact Person(s) shall be physically available on the workplace when a crew is
performing their assigned job.
d. Assure that all Contractor’s management personnel and employees are trained in the work practices
necessary to safely perform their assigned tasks. Proper documentation of the training shall be kept
updated.
4.3 In the case of an emergency job that need to be handled immediately by a Contractor, BP AKR Business
Unit Head has a right to hand over the job to a qualified Contractor without gaining BP AKR HSSE
Manager’s approval first, but Contractor Management Representative(s) and Area/Business Unit HSSE
Department Head shall hold a Pre-Job Meeting in all instances before commencing the job.
4.4 In the case when a Contractor has a Sub-Contractor(s), the Contractor shall ensure that their Sub-
Contractor(s) meet the requirements of BP AKR HSE Standards and GOI HSE legislations.
HSE TRAINING
4.5 All Contractor personnel shall attend a BP AKR HSE Induction Training session prior to beginning work
or where they have been absent from previous presence at BP AKR for more than six (6) months.
4.6 All Contractor personnel that have been working in the BP AKR work areas continuously for one
(1) year or more shall attend a BP AKR HSE Annual Refresher Training session.
4.7 All Contractor personnel are subject to other BP AKR HSE Training as determined by the risks of the
project and BP AKR regulations.
4.8 Each Contractor shall conduct their own job specific HSE orientation for their management
personnel and employees prior to beginning work.
4.9 All new Contractor employees, employees transferred to another job, or employees performing task(s) that
they have never performed before, shall receive adequate on-the job training in how to safely perform
that job before commencing it.
EMPLOYEES COMPETENCIES
4.10 Contractor shall demonstrate employee’s skills competencies for the skill or task the contractor is hired.
Competencies can be demonstrated by showing valid licenses or certification documents.
2
HSE MEETING
4.11 Each Contractor shall establish periodic HSE meetings to discuss relevant HSE-related issues and
concerns with their direct employees. Appropriate documentation for such meetings shall be kept.
4.12 Management and Staff HSE meetings shall be routinely conducted to assure the effectiveness of HSE
program implementation and/or to address any HSE shortcomings observed.
INDUSTRIAL HYGIENE
4.20 Where risk assessment identifies potential occupational hygiene and/or ill health issues, the Contractor
shall implement program(s) to protect employees against that exposure. Contractor shall refer to BP
AKR standards regarding the program(s) requirements.
3
4.22 Contractor supervisor shall investigate the incident in conjunction with Business Unit
representatives in accordance with BP AKR Incident Investigation Standards.
4.23 Each Contractor shall submit man-hours worked to BP AKR Technical Manager through BP AKR HSSE
Department on a periodical basis. (On the 4th day of the following month).
The HSSE Risk Categorization tool can be found below.
Business Activity Category 1 – Low Risk Category 2 – Medium Risk Category 3 – High Risk
Those activities that pose Those activities which present a Those activities which, if not
little or no health, safety, health, safety, security or managed correctly, could lead to
security or environmental environmental risk that is a major health, safety or
risk that is within BP AKR within BP AKR operational environmental event (i.e. a
operational control. control. Major, Severe or Catastrophic
consequence) that is with BP
AKR operation control.
All BP AKR Office (Only for tasks not High frequency/High risk Working under isolation.
listed as Cat 2 or 3). manual handling conducted as
In Store (Only for tasks not core business.
listed as Cat 2 or 3).
Outside hazardous zones
(Only for tasks not listed as
Cat 2 or 3).
Delivery of goods for re-sale
or delivery of equipment.
Utilities (provision by utility High frequency of accessing Hot Work in hazardous areas.
companies). height (e.g. egressing ladders
or permanent
platforms).
Provision of technical Use of power tools outside Breaking containment.
reviews (for example audit hazardous areas.
services and risk
assessments where no
fieldwork is involved).
Non-industrial cleaning. - Work in high traffic areas Working at height.
(e.g. Retail forecourts).
- Unsupervised workplace.
Permit Writing. Hot work involving open Confined space.
flames, and uncontrolled
creation of sparks (e.g. welding,
grinding, oxi-cutting)
outside of hazardous area.
Security patrols. Lifting operations.
Biological waste (e.g. septic). Working under a ground
disturbance certificate.
Environmental Waste. Carriers and distributors.
Asbestos sampling/surveying Potential exposure to
for regulated substances. regulated substances (e.g.
(Note: This applies where the Lead, asbestos).
potential for exposure is
considered unlikely and low (Note: This applies where
and should not be confused there is actual potential for
with scenarios where there is exposure as oppose to
actual potential for exposure sampling which would be a
which would be Cat 3 High Cat 1 Low Risk).
Risk). Demolition works.
Cash in transit.
Diving operations.
Ship to shore.
Handling of Hazardous
substances.
Electrical work.
High Risk Construction Work.
Regulatory requirements of the
Soil and water sample testing Soil and water sample testing in task (e.g. controlled waste
in a laboratory (where BP a laboratory (where the disposal).
AKR collects the samples on laboratory is responsible for
site and organises delivery to collection of the samples in the
the field).
laboratory).
4
5. STANDARDS OF ACCOUNTABILITY
5.1. BP AKR President Director
a. Ensure BP AKR has its own Standard to regulate Contractor HSE management system and review the
standard at minimum every three (3) years or whenever there are major changes of significant HSE
risks to ensure that it remains relevant and appropriate to the organization.
b. Provide resources to adhere to the provisions of the contractor HSE management system.
c. Ensure the standard is implemented throughout the BP AKR work area.
5
5.4. Head of BP AKR Procurement Department
a. Ensure the contractor included on the bidding list have successfully met the BP AKR HSE
selection criteria.
b. Ensure that prospective Contractor meets the minimum BP AKR HSE requirements prior to
commencing work.
c. Take any necessary corrective actions when a contractor fails to comply with BP AKR
Standards and GOI HSE legislations.
6. RELEVANT STANDARDS
6.1. Standard No. 5.02 – HSE Risk and Impact Assessment.
6
8. REFERENCES
8.1. National Occupational Safety Association (NOSA), the Republic of South Africa, CMB150 New
Protocol – Element 5.43.
8.2. OHSAS 18001:2007 – Occupational Health and Safety Management Systems, Clauses 4.3.2; 4.4.2;
and 4.4.6.
9. AMENDEMENTS
The following annotations describe the changes made to this Standard:
Revision No. Date of Revision Items Affected
n/a n/a 1 n/a
10. ATTACHMENTS
10.1. Selection and Tender Assessment Criteria for Prospective Contractor.
10.2. Contractor HSE Pre-Job Checklist.
10.3. Contractor Pre-Job HSE Meeting Outlines.
7
SELECTION AND TENDER ASSESSMENT CRITERIA FOR PROSPECTIVE CONTRACTOR
Selection and tender assessment criteria for Contractor(s) shall have due consideration of the
following:
1. Health, Safety and Environment (HSE) Management System and past performance.
2. Plant and/or Equipment proposed for use.
3. How the work is to be performed with regard to safe procedures (Contractor work methods) for any work
which may constitute a health and safety hazards.
6. Please advises the type of works has been undertaken by your Company to BP AKR:
Client’s – Name, Address Brief of the Project
No Contract No. Contract Period
and Contact Number Undertaken
7. Are lost time injury reports and report summaries sent to the following? How often?
Yes No Monthly Quarterly Annually
Site Manager
Local GOI DEMR Office
Please attach a copy of recent reports.
11. Do you have an HSE program for newly hired or promoted Supervisors?
Yes No
If yes, does it include instruction on the following?
Yes No Comment
a. Safe work practices
b. Safety supervision
c. Toolbox meetings
d. Emergency procedures
e. First aid procedures
f. Equipment inspection procedures
g. Injury and non-conformance
investigation
h. Fire protection and prevention
i. New worker orientation
j. Isolation procedures
12. Do you have occupational medical examination program for all personnel under your supervision?
Yes No _ If yes, please supplies a copy of inspection report.
9
13. Do you inspect tools and equipment before taking them onto a project site?
Yes No If yes, please supplies a copy of inspection report.
14. Do you have a schedule for regular inspection of Plant, tools and equipment?
Yes No If yes, please supplies the schedule.
15. Do you /your employees have licenses from GOI DEMR?
Yes No If yes, please supplies the copy of documents.
Acknowledgement
We hereby state that the above-mentioned information is true. Should there will be any information revealed
untrue based on the verification or evaluation this will cause to termination of the contract.
Signature/Name/Title/Date Signature/Name/Title/Date
_
Signature/Name/Title/Date
10
CONTRACTOR HSE PRE-JOB CHECKLIST
Yes No
1 HSE Induction for all management personnel and employees. [ ] [ ]
2 Specific HSE training given, if needed. [ ] [ ]
3 Review personal protective equipment (PPE) requirements
a. Hard Hats. [ ] [ ]
b. SNI approved eye and face protection (Safety Glasses, goggles, Face [ ] [ ]
shields).
c. Hearing protection.
[ ] [ ]
d. Respiratory Protection (half-mask, full-mask, air supplied). Fit test and [ ] [ ]
medical certification for proper use of respiratory protection.
e. Fall Protection (Full-Body Harness, Shock-Absorbing Lanyard). [ ] [ ]
f. Other PPE required. [ ] [ ]
4 Scaffold Requirements/Permits. [ ] [ ]
5 Ladder Requirements (non-conductive). [ ] [ ]
6 Aerial Man Lift (JLG, Scissor Lift) Requirements. [ ] [ ]
7 Hazard Communication Training (MSDS, Labels). [ ] [ ]
8 Crane Requirements (Operators Certification, Inspections, etc.). [ ] [ ]
9 Equipment and Vehicle Certification and Licensing. [ ] [ ]
10 Emergency Preparedness and Evacuation Plans/Protocol. [ ] [ ]
11 Work Safety Permits
a. Hot Works. [ ] [ ]
b. Confined Space Entry. [ ] [ ]
c. Ground Disturbance. [ ] [ ]
d. Energy Isolation. [ ] [ ]
e. Working at Height. [ ] [ ]
f. Lifting Operation. [ ] [ ]
g. Traffic Management. [ ] [ ]
12 First Aid/Medical Equipment. [ ] [ ]
13 Fire Protection/Prevention Requirements. [ ] [ ]
14 Accident Reporting System (types, who and when to report). [ ] [ ]
15 Lighting Requirements. [ ] [ ]
16 Lock-Out and Tag-Out (LOTO) Requirements. [ ] [ ]
17 Compressed Air and Gas Cylinders Requirements. [ ] [ ]
18 Housekeeping Plans. [ ] [ ]
19 Standards Operating Procedures (SOP). [ ] [ ]
20 Supervision Coverage. [ ] [ ]
21 Safety Contact Person(s). [ ] [ ]
22 Review BP AKR HSE Standards [ ] [ ]
11
CONTRACTOR PRE-JOB HSE MEETING OUTLINES
Project Name : Commencing Date :
Contract No : Completing Date :
Contracting Company : Total No. :
of Employees
Contractor Manager : Telephone No. :
Fax No. :
Parent BP AKR Dept. :
12
• Permits.
• Operator Certification and Licensing.
• Traffic Safety.
13. HSE Work Permits:
• Hot Works.
• Ground Disturbance.
• Confined Space Entry.
• Lifting Operation.
• Working at Height.
14. First Aid/Medical Treatment.
15. Medical Surveillance:
• Pre-employment and on-going Personnel medical examinations.
• Medical Tests and examination in relation to occupational health.
16. Emergency Preparedness and Reporting System.
17. Fire Prevention and Protection.
18. Accident Investigation and Reporting System.
19. Lighting.
20. Ventilation.
21. Safe Access to workplace.
22. Compressed Gas Cylinders and Pressure Vessels.
23. Lock-Out and Tag-Out (LOTO)
24. Housekeeping and Storage Practices.
25. Effective Communication. Top-Down and Bottom-Up.
26. HSE Suggestion Scheme.
27. Accident Review and HSE Notices.
28. Sanitary and Industrial Hygiene.
29. Specific Hazards and Risks associated with the project(s).
30. Off-The-Job HSE.
The above information has been understood and will be implemented during the execution of the
project(s).
_
Contracting Company Rep Area HSE Department Head
_
Parent BP AKR Dept Rep Manager, BP AKR HSSE
13