Professional Documents
Culture Documents
03PMT0064 Lubukalung Pdgatas
03PMT0064 Lubukalung Pdgatas
SITE ID : 03PMT0064
CITY : PADANG
AREA : CSRO
Approved By,
INDOSAT OOREDOO- PROJECT INDOSAT OOREDOO- ID INDOSAT OOREDOO
VENDOR
1. GENERAL INFORMATION
1 ZXCTN 6120H-S NEW 43.6 mm × 264 mm × 270 mm 200 2 PCS X 16A (DC)
SITE NAME TOMHAWK PROJECT CITY 03PMT0064
SITE IE LUBUKALUNG_PDGATAS_TB AREA PADANG
Type site TYPE SITE ROOF TOP/ GREEN FIELD/ INDOOR BUILDING GREEN FIELD
PERANGKAT ZXCTN 6120H-S-NEW
SPACE OK LOKASI Proposed New ZXCTN 6120H-S At Rack OUTDOOR
2 OTB/ODP OK LOKASI ODP READY AT POLE
3 MCB PDU A NONE PROP. MCB NEW (A)= X PCS LOAD (A) = 0
3 MCB PSU 1 NONE PROP. MCB NEW (A)= X PCS LOAD (A) =
4 MCB PSU 2 NONE PROP. MCB NEW (A)= X PCS LOAD (A) =
3 MCB PDU B NONE PROP. MCB NEW (A)= X PCS LOAD (A) = 0
5 MCB PSU 3 NONE PROP. MCB NEW (A)= X PCS LOAD (A) =
6 MCB PSU 4 NONE PROP. MCB NEW (A)= X PCS LOAD (A) =
7 PLN OK 5500VA UPGRADE KE 0
8 GENSET N/A N/A - N/A VA UPGRADE KE 0 VA
9 RECTIFIER 1 ADD MODULE OUTDOOR -DELTA-0-2 Utilisasi (%) 98%
BUT 0K BUT 7.8
Remarks
10 RECTIFIER 2 #DIV/0! --- Utilisasi (%) #DIV/0!
BUT #DIV/0! BUT #DIV/0!
Remarks
11 RECTIFIER 3 #DIV/0! --- Utilisasi (%) #DIV/0!
BUT #DIV/0! BUT #DIV/0!
Remarks
12 RECTIFIER 4 #DIV/0! --- Utilisasi (%) #DIV/0!
BUT #DIV/0! BUT #DIV/0!
Remarks
13 MCB OK Propose USE MCB Existing 2 x 16 A
14 SINGLE/DUAL Single Koneksi Single Source Dual Feed, Main&Redundant Koneksi Ke Power System 1 -HUAWEI R4850N
PLN OK
YEAR OF INSTALLATION
Charge Coefficient % 10% 10% 10% 10% 10% 10%
Capacity Ah 100
Qty of Banks Banks 2
Total Battery Capacity Ah 200 0 0 0 0 0
DC POWER CALUCATION
Existing Load Watt 1025 0 0 0 0 0 1281 VA
Battery Charging Watt 1120 0 0 0 0 0 1400 VA
Proposed Equipment
ZXCTN 6120H-S Watt 200
Watt
Watt
Total Proposed Equipment Watt 200 0 0 0 0 0 250 VA
Total Load Watt 2345 0 0 0 0 0 2931.075 VA
Capacity Rectifier 80% with redudancy (n-1) Watt 2400 0 0 0 0 0
Rectifier Existing Utilization % 89% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Rectifier Existing + New Load Utilization % 98% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Remain Power Watt 55 0 0 0 0 0
RESULT
THRESHOLD CAPACITY RECTIFIER 100% 80% 90% 90% 90% 90% 90%
STATUS RECTIFIER OK/ADD ADD MODULE #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
TYPE MODULE 0 0 0 Dec-99 0 0
ADD MODULE Pcs 0 0 0 0 0 0
AVAILABLE SLOT Pcs 4 0 0 0 0 0
NEW CAPACITY 80% WITH REDUDANCY (N-1) Watt 2400 0 0 0 0 0
RECTIFIER ULITIZATION AFTER EXPANSION % 98% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
BATTERY CALUCATION
Battery Backup Time Load Existing hours 9.4 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Battery Backup Time Load Existing + New :oad hours 7.8 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
RESULT
THRESHOLD BACKUP TIME 2 hrs 2 2 2 2 2 2
TOTAL LOAD Ampere 49 0 0 0 0 0
STATUS BATTERY 0K #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
MEREK SacredSun 0 0 0 0 0
TYPE BATTERY SmartPower 48100 0 0 0 0 0
CAPACITY Ah 100 0 0 0 0 0
ADD BATTERY Banks 0 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
BACKUP TIME AFTER ADD BATTERY hours 7.8 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
COONECTION POWER Main / Main &Redundant
Redundant
NOTE FROM CORE INRASTRUCTURE DESIGN & SOLUTION
POWER Single Koneksi Single Source Dual Feed, Main&Redundant Koneksi Ke Power System 1 -HUAWEI R4850N
AC SPLIT
Location / Room / Shelter
Dimension Room Length (m)
Width (m)
Area (m²)
LAMP UNIT
MEREK
CAPACITY PK
YEAR OF INSTALLATION
TEMPERATURE INSIDE °C
QUANTITY Pcs
TOTAL LOAD PLN Watt 0 0 0 0 0
CAPACITY COOLING Watt 0 0 0 0 0 0 0
COOLING CALCULATION
EQUIPMENT Watt 0 0 0 0 0 0
LAMP Watt 0 0 0 0 0 0
AIR CONDITION EXISTING Watt - - - - - -
COOLING EXISTING UTILIZATION %
Watt 200 200
NEW LOAD
Watt 200.00 200.00 200.00 200.00
COOLING EXISTING + NEW LOAD %
UTILIZATION
RESULT
THRESHOLD COOLING % 80% 80% 80% 80% 80% 80%
STATUS COOLING OK/ADD
CAPACITY PK 0 0 0 0 0 0
REMAIN CAPACITY COOLING Watt (200.00) (200.00) (200.00) (200.00) - -
QUANTITY Unit
REMARKS
SITE OUTDOOR
6. UPS POWER CALCULATION
Site Name LUBUKALUNG_PDGATAS_TB CITY PADANG
TOTAL LOAD VA 0
RESULT
TOTAL REQUIREMENT (EXITING + NEW) VA 0 0
REMAINING POWER VA 0 0
UPS Usage from 80% total capacity 100% #DIV/0! #DIV/0!
STATUS OK/ Need Upgrade #DIV/0! #DIV/0!
Capacity kVA 0 0
Unit #DIV/0! #DIV/0!
Utilization after Upgrade % #DIV/0! #DIV/0!
BATTERY UNIT UPS 1 UPS 2
Brand
Model
Voltage
Capacity
Qty
BACK UP TIME (existing) Hrs #DIV/0! #DIV/0!
RESULT
Treshold hrs 0.5 0.5
BACK UP TIME (Existing + New) Hrs #DIV/0! #DIV/0!
STATUS OK/ Need Upgrade #DIV/0! #DIV/0!
CAPACITY AH 0 0
Qty Bank #DIV/0! #DIV/0!
BACK UP TIME AFTER UGRADE hrs #DIV/0! #DIV/0!
REMARKS
Site Name LUBUKALUNG_PDGATAS_TB City PADANG
Site ID 03PMT0064 Area CSRO
N/A
ID PELANGGAN KWH
N/A N/A
N/A
N/A NA
N/A
NA NA
NA NA
NA NA
N/A NA
N/A N/A
Voltage Measurement at ATS Panel R-N 144.2 V Voltage Measurement at ATS Panel S-N 391 V
N/A N/A
Voltage Measurement at ATS Panel T-N 125.9 V Voltage Measurement at ATS Panel PE-N 125.9 V
EXTERIOR PHOTOS
Site Name LUBUKALUNG_PDGATAS_TB
City PADANG
Site ID 03PMT0064 Area CSRO
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA
NA NA
NO AC AVILIABLE N/A
AC SPLIT 1 AC SPLIT 2
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NA NA
NEW ME NEW ME
NEW ME NEW ME
NEW ME NEW ME
NA NA
NA NA
NA NA
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
PROP. ZXCTN 6120H-S PROP. MCB ZXCTN 6120H-S (USE EXISTING MCB
2 X 16 A)
N/A