JAN.2022
MACHINE NAME 10MT ROTATORY FURNACE
SN CHECK TO BE DONE TARGET 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 BELT TENSION INSPECTION DAILY
2 HOLDING NUTBOLT INSPECTIODAILY
3 PULLY INSPECTION DAILY
4 ROTATION INSPECTION DAILY
5 ROTARY MOTOR LOAD (AMPS) DAILY
6 ROTARY GEAR BOX DAILY
7 FURNACE OIL TANK LEVEL DAILY
MONTHLY
1 ALL BEARING GREESING MONTH
2 ALL NUT BOLT TIGHTING MONTH
3 GEAR OIL FILLING MONTH
OBSERVATION DATE COST
CHECKED BY
CHECKED BY
CHECKED BY
MONTHLY
CHECKED BY
CHECKED BY
CHECKED BY
CHECKED BY
CHECKED BY
CHECKED BY
CHECKED BY
CHECKED BY
CHECKED BY
CHECKED BY
CHECKED BY
CHECKED BY
DRIVER SIG
SIG BY SUPERVISER
CHECKED BY DRIVER
CHECKED BY SUPERVISER
DRIVER SIG
SIG BY SUPERVISER
CHECKED BY DRIVER
CHECKED BY SUPERVISER
MAINTENANCE INCHARGE PRODUCTION MANAGER PLANT MANAGER
METSTAR FORCE DRIVER MAINTENANCE CHECK LIST
FORCE JAN.2022
STARTING STOPPED TOTAL DIESEL PAR HRS DRIVER
DATE READING READING HRS LTR DIESEL NAME