Ref HM/MY06PH3/HSE/FRM /020

HUASHI (MALAYSIA) SDN BHD Rev. No. 0


Issued Date 28 November 2022
DAILY EXCAVATOR INSPECTION CHECKLIST Page No. Page 1 of 1
MY06PH3 PROJECT BUTTERFLY
DESIGN AND BUILD CSA MAIN CONTRACT FOR THE DETAILED DESIGN, AUTHORITY SUBMISSIONS,SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING, OBTAIN CERTIFICATE OF
COMPLETION & COMPLIANCE, SUPPORT DURING DEFECTS LIABILITY PERIOD AND MAINTENANCE OF PROJECT BUTTERFLY 03 - A NEW 40MW IT, GREENFIELD CENTRE (PHASE 3) FOR BRIDGE
DATA CENTRE MALAYSIA III SDN BHD ON HS (D) 78142 PTD 32674

PROJECT CLIENT
MODEL/ TYPE NAME OF OPERATOR
PMA CERT. NO. MONTH YEAR
DAY OF INSPECTION
No. Item to be inspected
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Oil Level
Water Level
1
Batteries Water
All gauges
Lighting
Reverse Buzzer
Horn
Switches
2
Side Mirror
Warning Gauges &
Buzzer
Hook Safety Catch
Bucket / Breaker
Locking & Braking devices
Fire Extinguisher
Access to Cab
Warning Lights (Blinkers
Lights)
3 Excavator Structure incl.
bolt & rivet
Pin, shaft, axle
Bearing & Roller
Excavator Track
Operator Sign
SHE Sign

Remarks: Good Condition / Yes:  Bad Condition / No:  Not Applicable: NA