REVISION TABLE
1 X 31
2 X 32
3 X 33
4 X 34
5 X 35
6 X 36
7 X 37
8 X 38
9 X 39
10 X 40
11 x 41
12 x 42
13 x 43
14 x 44
15 x 45
16 x 46
15 x 47
18 x 48
19 x 49
20 x 50
21 x 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
JAMBI MERANG DEVELOPMENT PROJECT
EPC GAS METERING AT GRISSIK
Date : 26/03/2014
PROCEDURE FOR FABRICATION OF
Doc. No : - Rev: A
STEEL STRUCTURE Page 3 of 21
RECORD OF REVISION
TABLE OF CONTENTS
1. GENERAL 5
1.1 SCOPE 5
1.2 CODES AND STANDARDS 5
2 GOVERNMENT REGULATIONS 7
3 DEFINITION OF TERMS 8
4 PARTICULAR REQUIREMENTS 8
4.1 QUALITY CONTROL 8
4.2 SUBMITTALS 9
4.3 PERFORMANCE REQUIREMENTS 10
5 PRODUCTS 10
5.1 MATERIALS 10
6 EXECUTION 12
6.1 CONNECTIONS 12
6.2 ERECTION AND SHOP DRAWINGS 19
6.3 FABRICATION 19
6.4 CORROSION PROTECTION 20
6.5 HANDLING, SHIPPING, AND DELIVERY 20
JAMBI MERANG DEVELOPMENT PROJECT
EPC GAS METERING AT GRISSIK
Date : 26/03/2014
PROCEDURE FOR FABRICATION OF
Doc. No : - Rev: A
STEEL STRUCTURE Page 5 of 21
1. GENERAL
1.1 SCOPE
1.1.1 This procedure covers the requrements for the design of connections,
preparation of shop details, and supplying materials, shop fabrication,
corrosion protection, inspection, and shipping of structural steel components.
1.2.1 The work shall comply with all Codes and Standards mentioned in this
specification. The latest revision of Codes and Standards shall be used in
effect 29 January, 1996.
2. GOVERNMENT REGULATIONS
3 DEFINITION OF TERMS
4. PARTICULAR REQUIREMENTS
4.1.1 The Seller shall be solely responsible for quality control of all materials and
workmanship.
4.1.2 The Seller shall have a written Quality Control Program and Inspection
Procedures document which shall provide details of how compliance with the
requirements of this procedure and the design drawings shall be achieved.
4.1.3 The Purchaser has the right to inspect all materials and workmanship, and
shall have unrestricted entry to the shop of the Seller at all times while work
is being performed. The Purchaser may refect improper, inferior, defective,
or unsuitable materials and workmanship. All materials and workmanship
refected shall be repaired or replaced by Seller as directed by the Purchaser.
4.1.5 Welding procedures previously qualified by the Seller may be used without
requalification. However, The Purchaser reserves the right to require
requalification of any questionable procedure prior to the start of fabrication.
4.1.6 All welding inspectors shall be qualified and cerfitied as AWS Certified
Welding Inspectors in accordance with the provisions of AWS D1.1 or AWS
QCI.
JAMBI MERANG DEVELOPMENT PROJECT
EPC GAS METERING AT GRISSIK
Date : 26/03/2014
PROCEDURE FOR FABRICATION OF
Doc. No : - Rev: A
STEEL STRUCTURE Page 9 of 21
4.1.7 Certified mill test reports for each heat of structural steel and each lot of high
strength bolts shall be available for review by the Purchaser.
4.2 SUBMITTALS
4.2.1 The Seller shall submit, as minimum, the following documents to the
Purchaser for approval from the Purchaser prior to the start of fabrication:
4.2.2 Unless previously submitted, the Seler shall submit the following documents
to the Purchaser prior to the start of fabrication:
c. Welding Procedures
4.2.3 A Shipping List (including total weight), a Bolt List, and a minimum of two
sets of final erection and shop drawings shall accompany the first shipment of
each release.
4.2.4 The Seller shall submit, as a minimum, the following documents to the
Purchaser for record purposes:
All work covered by this procedure shall conform to the AISC Code of
Standard Practice for Steel Buildings and Bridges and the AISC Specification
for Structural Steel Buildings: Allowable Stress Design and Plastic Design.
5. PRODUCT
5.1 MATERIALS
ASTM A529 Structural Steel with 42 KSI (290 N/mm2) Minimum Yield
Point
ASTM A570 Gr 40, 45, and 50 Steel, Sheet and Strip, Carbon, Hot-rolled,
Structural Quality.
ASTM A852 Quenched and Tempered Low-alloy Structural Steel Plate with
70 KSI (480 N/mm2) Minimum Yield Strength to 4 in (100mm) thick
JAMBI MERANG DEVELOPMENT PROJECT
EPC GAS METERING AT GRISSIK
Date : 26/03/2014
PROCEDURE FOR FABRICATION OF
Doc. No : - Rev: A
STEEL STRUCTURE Page 11 of 21
5.1.2 PIPE
ASTM A53 Type E or S, Grade B Pipe, Steel, Black and Hot-dipped, Zinc-
coated Welded and Seamless Steel Pipe.
5.1.4 High Strength Bolt Assemblies (shall be galvanized per Specification N150)
AWS D1.1, Section 4.1 (including Table 4.1) with an electrode strength of 58
KSI (400 N/mm2) minimum yield strength and 70 KSI ( 480 N/mm2)
minimum tensile strength. (For example, use e70 XX for SMAW, F7XX-
EXXX for SAW, er70S-X fpr GMAW, and E7XT-X for FCAW) However,
E60XX electrodes may be used for tack welding.
5.1.9 Welded Steel Bar Grating and Grating Stair Treads ASTM A569, galvanized
per astm a123. Top surface of bearing bars shall be serrated type. Grating
stair treads shall have checkered plate nosing.
6. EXECUTION
6.1 CONNECTIONS
h. Seller may substitute BS 3692, grade 8.8 bolts for ASTM A325
bolts.
The Seller shall not increase allowable stresses in the design of connections
(i.e. no one third increase for wind and seismic), unless noted otherwise on
the engineering design drawings.
b. Only M20 diameter ASTM A325M high strength bolts shall be used
in all bolted structural connections, unless otherwise noted on the
engineering design drawings. However, larger ASTM A325M bolts
may be used when required to meet connection capacity requirements
and shall be clearly “flagged” on the erection drawings.
i. All bolt holes shall be standard holes with a diamter 1.6 mm larger
than the nominal bolt diamter, unless otherwise spcified on the
engineering design drawings or noted below.
l. For Slotted holes, the long direction of the slot shall be perpendicular
to the load direction. All slotted or oversize hole dimensions shall be
per Table 1 of Specification for Structural Joints Using ASTM A325
or A490 Bolts. (Convert Table 1 to millimeters)
m. Hardened washers shall be provided under all bolt heads and/or nuts
adjacent to any play with oversized or slotted holes. For standard
holes, a minimum of one hardened washer shall be supplied with ech
bolt.
d. Minimum fillet weld size 3/16-inch (5mm) for strength welds. Seal
welds may be 1/8-inch (3mm) minimum fillet weld.
f. Seller shall design and install erection clips for field welded
connections.
a All bracing end connections shall be designed for the forces shown on
the engineering design drawings. A minimum of two bolts per
connection is required.
e. All gusset and stiffener plates shall be 3/8-inch (10 mm) minimum
thickness.
f. All vertical bracing and knee bracing shall have gusset plates on
column centerlines, unless otherwise noted on the engineering design
drawings.
JAMBI MERANG DEVELOPMENT PROJECT
EPC GAS METERING AT GRISSIK
Date : 26/03/2014
PROCEDURE FOR FABRICATION OF
Doc. No : - Rev: A
STEEL STRUCTURE Page 18 of 21
6.2.1 Shop drawings and erection drawings shall be prepared in accordance with
the AISC documents listed in this specification.
6.2.2 Erection drawings shall reference the corresponding design drawings and
every steel piece on the shop drawings shall reference the appropriate
erection drawing.
6.2.3 Erection and shop drawings shall be grouped in sets and identified separately
for each building, structure or yard area.
6.2.4 Erection drawings shall clearly show the mark number and position for each
member.
6.2.5 Purchaser’s purchase order number shall be shown on all erection and shop
drawings.
6.2.7 Surface preparation and shop applied coatings, including areasto be masked,
shall be noted on the shop drawings.
JAMBI MERANG DEVELOPMENT PROJECT
EPC GAS METERING AT GRISSIK
Date : 26/03/2014
PROCEDURE FOR FABRICATION OF
Doc. No : - Rev: A
STEEL STRUCTURE Page 19 of 21
6.2.8 Seller shall provide a Bolt list showing the number, grade, size, and length of
field bolts for each connection. This Bolt list may be shown on either the
shop drawings or on separate sheets.
6.2.9 In the event that drawing revisions are necessary, the Seller shall clearly flag
on the shop drawings all changes showing in the latest revisions.
6.3 FABRICATION
6.3.1 All fabrication shall in accordance with the AISC Specification for Structural
Steel Buildings: Allowable Stress Design and Plastic Design and the Code of
Standard Practice for Steel Buildings and Bridges, subject to modification by
the contract documents, state or local laws, and building codes.
6.3.2 All welding shall be in accordance with AWS D1.1 Structural Welding Code.
6.3.4 All beams, except catilevers, shall be fabricated with natural mill camber in
the up position.
6.3.5 The Seller, when performing shop assembly work, shall not exceed the
tolerences specified in AISC Code of Standard Practice, Section 7.11.
6.3.6 All pieces shall be clearly marked with a permanent identifying erection mark
number on the web. Subject to the approval of the Purchaser, this
identification may be die stamped on the member, punched on metal tags seal
welded to the member, or adhesive backed barcode.
6.3.7 Prior to surface preparation, the Seller shall remove all sharp corners, burrs
(including bolt hole burrs), weld spatter, slag, weld flux, loose mill scale and
other foreign matter.
6.3.8 Platforms, stariways and handrailsshall be shop assembled in the largest units
suitable for handling and shipping. Ladder cages shall be shop assembled on
ladder.
6.3.9 The method for fastening grating shall be as specified on the engineering
design drawings. A minimum of two fasteners per panel shall be used at each
support, with a minimum of four per panel. The fasteners shall be supplied by
the Seller with five percent extra to cover losses.
JAMBI MERANG DEVELOPMENT PROJECT
EPC GAS METERING AT GRISSIK
Date : 26/03/2014
PROCEDURE FOR FABRICATION OF
Doc. No : - Rev: A
STEEL STRUCTURE Page 20 of 21
6.3.11 Checkered plate and solid shall have 12 mm diameter drain hole for every 1.5
m2 of floor plate with a minimum of one hole per panel, holes to be drilled
before galvanizing.
6.4.1 For Corrosion protection see Specification No. N 150, Painting of Exterior
Surfaces.
a. Delivery of steel shall be in the order needed for erection. The delivery
sequence for the fabricated steel, unless otherwise noted in the contract
documents or arranged by the Purchaser, shall be as follows: anchor bolts,
loose base plates, steel embedded in concrete, erection bolts, first tier
columns and framing for all its levels (inclcuding stairs and handrail),
second tier columns and its framing, etc.
a. All bolts, washers and nuts shall be packaged and delivered in rigid (not
cardboard), weatherproof containers.
b. Railcars and/or trucks shall be loaded and cribbed so they can be readily
unloaded by others. Load in such a manner that continuous draingae will
occur.
c. The Seller shall ensure that all steel and its coatings are protected from
any damage causesd by handling, storage or shipping prior to receipt by
the Purchaser.
d. Seller shall ensure that adequate protection is provided for threads on sag
rods, and any other threaded components so as to prevent damage during
shipping and handling.
JAMBI MERANG DEVELOPMENT PROJECT
EPC GAS METERING AT GRISSIK
Date : 26/03/2014
PROCEDURE FOR FABRICATION OF
Doc. No : - Rev: A
STEEL STRUCTURE Page 21 of 21
6.5.2 Delivery