PROCESS DATA SHEET


FOR
INSTRUMENT AND PLANT AIR PACKAGE (PK-2401)

A2 04.APR.2017 ISSUED FOR DESIGN (COMMENT INCORPORATED) EKA EAS ABR


A1 28.OCT.2017 APPEOVED FOR DESIGN EKA EAS ABR
A0 05.OCT.2017 ISSUED FOR REVIEW EKA EAS ABR

REV. DATE DESCRIPTION PREPARED CHECKED APPROVED


Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 2 of 16
180 24 ED PR DSH PK2401 A2

Revision Sheet

PAGE A0 A1 A2 A3 A4 PAGE A0 A1 A2 A3 A4

1    26

2    27

3  28

4    29

5   30

6    31

7  32

8  33

9  34

10   35

11  36

12  37

13  38

14  39

15  40

16  41

17 42

18 43

19 44

20 45

21 46

22 47

23 48

24 49

25 50
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 3 of 16
180 24 ED PR DSH PK2401 A2

General Notes

1- Project general information: " Basic Engineering Design Data ; 180-00-ED-PM-DBS-09000"

2- For site condition and climatic data information: " Site Condition; 180-00-ED-PM-DBS-09001"

3- Vendor to complete blank item.

4- Quality of plant air and instrument air shall be according Tt ISO 8573-1:2010 Class 1.2.1.
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 4 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 ITEM NO. PK-2401-C1 (NOTE 1) SERVICE AIR COMPRESSOR (NOTE 2, 7, 8, 9, 10, 11, 12, 13, 14)
2 TYPE ROTARY COMPRESSOR-Oil Free Screw LOCATION UNDER SHELTER
3 NUMBER OF COMPRESSORS REQUIRED 3 IN REGULAR USE 2
4 LUBRICATING OR NON-LUBRICATING TYPE OIL FREE
5 TYPE OF DRIVER MOTOR DRIVEN
6
7 NUMBER OF STAGES BY VENDOR
8 PROPERTIES OF GAS (COMPOSITION AT SUCTION)
9 COMPOSITION MOLE %
10 AIR (DRY BASIS) 100
11
12 DELIVERED FLOW RATE Nm3/h (1.013 BARA & 0°C) (WET) Nm3/hr 467 (NOTE 3) A2
13 DELIVERED FLOW Normal Nm3/h (1.013 BARA & 0°C) (WET) Nm3/hr 390 (NOTE 3) A2
14
15 INLET CONDITIONS:
16 PRESSURE BAR (A) ATM
17 TEMPERATURE °C 28 A2
18 RELATIVE HUMIDITY % 69 A2
19 MOLECULAR WEIGHT 28.67 A2
20
21
22 DISCHARGE CONDITIONS:
23 PRESSURE (note 5, note 6) BAR (A) 9.6 (NOTE 4)
24 TEMPERATURE (note 7) °C 45(NOTE 5)
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 5 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 ITEM NO. PK-2401-C1 SERVICE AIR COMPRESSOR


2
3 MECHANICAL DATA
4 UPSTREAM DESIGN PRESSURE : bar g
5 UPSTREAM DESIGN TEMPERATURE : °C 85
6 DOWNSTREAM DESIGN PRESSURE : bar g 11 (NOTE 6)
7 DOWNSTREAM DESIGN TEMPERATURE : °C 85
8 INSTALATION : OUTDOOR @ GRADE UNDER SHELTER
9 UNUSUAL CONDITIONS: DUST AND SALT MARINE / HIGHLY CORROSIVE
10 AREA ELECTRICAL CLASSIFICATION: SAFE AREA
11
12 NOTES:
13 1) VENDOR TO COMPLY WITH PROJECT SPECIFICATION.
14
15 2) THIS COMPRESSOR IS REQUIRED FOR FILLING UP INSTRUMENT AIR IN RECEIVER VESSEL. PRESSURE OF SURGE VESSEL DURING START UP WILL BE
16 ATMOSPHERIC. THE PRESSURE WILL BE RAISED TO 8.7 BAR(G) BY THE OPERATION OF COMPRESSORS.
17 ALL ACCESSORIES LIKE INTERCOOLERS & AFTER COOLERS, INSTRUMENTATION, CONTROL PANEL (INCLUDING ALL THE INSTRUMENTATION REQUIRED TO
18 ESTABLISH THE GURANTEE OF THE COMPRESSOR PACKAGE ARE IN VENDOR SCOPE).
19
20 3) DESIGN CASE: SUMMER CONDITION, TEMPERATURE 28˚C, RELATIVE HUMIDITY 69% . A2
21
22 4) REQUIRED PRESSURE AT COMPRESSOR OUTLET PACKAGE BATTERY LIMIT : 9.6 BAR(A).
23
24 5) AIR TEMPERATURE AT COMPRESSOR OUTLET PACKAGE BATTERY LIMIT, SHALL BE LESS THAN 45˚C. VENDOR TO PROVIDE INTERCOOLER /AFTERCOOLER
25 TO SATISFY THIS VALUE. INTER COOLER /AFTERCOOLER ON COMPRESSOR, WILL USE MACHINERY COOLING WATER:
26 T SUPPLY=38˚C , T RETURN =48 ˚C ; PSUPPLY= 4 BAR(G), PDESIGN =10.1 BAR(G)
27
28 6) DESIGN PRESSURE OF DOWNSTREAM PIPING AND EQIUPMENT: 11 BAR (G). MANUFACTURER TO PROVIDE ALL REQUIRED SAFETY DEVICES TO PROTECT
29 DOWNSTREAM PIPING AGAINST OVERPRESSURE (SAFETY VALVES, ETC)
30
31 7) MANUFACTURER MUST PROVIDE PERFORMANCE CURVES FOR COMPRESSOR OPERATION SHOWING DISCHARGE PRESSURE AND BRAKE HORSEPOWER
32 AGAINST DELIVERED STANDARD FLOW. CURVES SHALL INDICATE SURGE, RATED CAPACITY AND ANY OTHER SPECIFIED OPERATING POINTS (ALSO
33 MINIMUM AND MAXIMUM AMBIENT TEMPERATURES).
34 PERFORMANCE CURVES FOR CAPACITY, DISCHARGE PRESSURE AND BRAKE HORSE POWER (KW RATING) SHALL BE DEVELOPED FROM SURGE TO
35 MAXIMUM CAPACITY AT 100% SPEED.
36
37 8) CONTROL METHOD:
38 COMPRESSOR CAPACITY MODULATION TO BE PROPOSED BY VENDOR. THE COMPRESSOR SHALL BE EQUIPPED TO OPERATE WITH ALL THE CONTROL
39 MODES. STAND-BY COMPRESSOR TO BE AUTOMATICALLY STARTED ON COMPRESSED AIR HEADER LOW LOW PRESSURE AND LOW PRESSURE
40 AIR RECEIVER.
41
42 9) THE COMPRESSOR PACKAGE WILL BE COMPLETE WITH ELECTRIC MOTORS, NON-RETURN VALVES, INTERCOOLERS, AFTERCOOLERS,
43 CONDENSATE DRAINING FACILITIES, ETC.
44
45 10) SUCTION FILTER SHALL BE SUPPLIED BY VENDOR AND INSTALLED BY PURCHASER OUTSIDE SHELTER AT ELEVATION …(TO BE ADVISED).
46
47 11) VENDOR TO FURNISH THE UTILITY REQUIREMENTS FOR THE COMPRESSOR PACKAGE .
48
49 12) VENDOR TO GURANTEE THE FLOW AND DISCHARGE PRESSURE AT RATED CAPACITY.
50
51 13) ALL AUXILIARIES & MISCELLANEOUS ITEMS & SPARE PARTS REQUIRED FOR THE AIR COMPRESSOR SHALL BE INCLUDED IN THE SCOPE
52 OF THE VENDOR SCOPE OF WORK.
53 14) COMPRESSOR SHOULD BE OIL FREE & DUST FREE.
54
55 15) A) Oil system pipework & Reservoir Material of oil lubrication system shall be SS. A2
56 B) The integral lub oil system shall include a single oil cooler and twin oil filter with change over valve A2
57
58
59
60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 6 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 ITEM PK-2401-DR1 No. OF TWIN DRYER SETS MAIN / STAND -BY 1 /


2 SERVICE INSTRUMENT AIR DRYER TYPE (heat-less heat) heat (NOTE 1)
3 HEATER TYPE (electric-steam) REGENERATION GAS (purge- ambient air)
4 INSTALLATION (indoor-outdoor-other) outdoor / sheltered WINTERIZATION /TROPICALIZATION (yes-no) /
5 CODE FOR PRESSURE VESSELS ASME VIII
6 ELECTRICAL SUPPLY: VOLTAGE V FREQUENCY Hz PHASES No.
7 STEAM CHARACTERISTICS
8 PRESSURE MIN / NORM / MAX kPa(g) / /
9 TEMPERATURE MIN / NORM / MAX °C / /
10 OPERATING CONDITIONS AND MECHANICAL DATA
11 NORMAL / RATED CAPACITY AT NORMAL CONDITION Nm³/h 215 / 258 / BY VENDOR A2
12 OPERATING / DESIGN PRESSURE (inlet/oulet) bar(g) BY VENDOR / 11 / 11
13 OPERATING / DESIGN TEMPERATURE (inlet/oulet) °C BY VENDOR / 85 / 85
14 AIR RELATIVE HUMIDITY AT OPERATING TEMPERATURE % 69 A2
15 OIL PRESENCE IN THE AIR wt ppm nill
16 DEW POINT AT OPERATING CONDITIONS: INLET / OUTLET °C (NOTE 2) / -20
17 DEW POINT AT ATMOSPHERIC PRESSURE °C
18 ALLOWABLE PRESSURE DROP (INCLUDED PRE/POST FILTER) bar 0.5
19 DRYING PROCESS TIME / REGENERATION TIME s BY VENDOR / BY VENDOR
20 OPERATING CYCLE (manual - automatic) automatic (NOTE 3)
21 INLET LINE: DIAMETER / RATING / FACING ANSI NPS BY VENDOR / /
22 DISCHARGE LINE: DIAMETER / RATING / FACING ANSI NPS BY VENDOR / /
23 MATERIAL IN CONTACT WITH FLUID HANDLED (MINIMUM REQUIREMENT) CS
24 CORROSION ALLOWANCE OF TOWER SHELL mm 3 (NOTE 2)
25 DESICCANT MATERAL (activated allumina - molecular sieves - other) activated allumina
26
27 ACCESSORIES
28 FILTER NUMBER AT INLET (PREFILTER) 1 DUTY / 1 STAND-BY
29 FILTER NUMBER AT DISCHARGE (POST FILTER) 1 DUTY / 1 STAND-BY
30 SAFETY VALVE ON EACH VESSEL (yes-no) yes
31 SAFETY VALVE SET PRESSURE bar(g) 11
32 PRESSURE GAUGE ON EACH VESSEL (yes-no) yes
33 DIFFERENTIAL PRESSURE GAUGES ON FILTERS (yes-no) yes
34 THERMOMETER UPSTREAM FILTERS (yes-no) yes
35 NOTES
36 1) HEAT TYPE TO BE CONSIDERED AS AN OPTION.
37
38 2) VENDOR TO CONFIRMED.
39
40 3) DURING OPERATION, THE BEDS ARE AUTOMATICALLY SWITCHED FROM DRYING MODE TO REGENERATION MODE ON A TIME CYCLE BASIS.
41 THIS OPERATION IS OVERRIDDEN BY A DEW POINT ANALYZER WHEN OUTLET AIR HAS REACHED THE MOISTURE SET POINT VALUE.
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 7 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 MFR MODEL
2 PURCHASE ORDER No. REV. DATE
3 OFFER No. REV. DATE
4 CODES AND STD FOR CONSTRUCTION REV. DATE
5 SUPPLY GENERAL CONDITIONS
6 VESSEL DESIGN ASME VIII
7 SAFETY DEVICE DESIGN CODE
8 WELDING PROCEDURE
9
10
11 CONSTRUCTION FEATURES REQUIRED DATA SUPPLIER DATA
12 DRYER TYPE Heat less
13 RATED CAPACITY AT NORMAL CONDITION Nm³/h (NOTE 4)
14 OUTLET CAPACIY
15 DESICCANT TYPE Activated alumina
16 DESICCANT QUANTITY PER TOWER kg
17 DRYING PROCESS TIME s
18 REGENERATION TIME s
19 OPERATING LOGIC (electromechanical - electronic - other)
20 REGENERATION GAS Dry air
21 REGENERATION AIR CONSUMPTION kg
22 ELECTRIC INSTALLED POWER kW
23 STEAM CONSUMPTION EACH REGENERATION kg
24 MAX / MIN ALLOWABLE OPERATING TEMPERATURE °C / /
25 MAX / MIN OPERATING PRESSURE bar(g) / /
26 MAX PRESSURE DROP (INCL. PRE / POST FILTER) bar(g) 0.5
27 DESIGN TEMPERATURE °C 85
28 DESIGN PRESSURE bar(g) 11
29 HYDROSTATIC TEST PRESSURE bar(g) 1.3 MAWP
30 TOWER HEIGHT (BETWEEN TANGENT LINES) mm
31 TOWER DIAMETER mm
32 SHELL THICKNESS / CORROSION ALLOWANCE mm / /
33 TOTAL MASS: EMPTY / FULL kg / /
34 OUTLINE DIMENSION OF UNIT: (2) mm / / / /
35 NOISE LEVEL OF COMPLETE UNIT: SPL AT 1 m / PWL dB(A) 85 / /
36
37
38
39
40
41 NOZZLES REQUIRED DATA SUPPLIER DATA
42 AIR INLET: (NOTE 5) NPS / / / / / /
43 AIR OUTLET: (NOTE 5) NPS / / / / / /
44 DESICCANT CHARGE: (NOTE 5) NPS / / / / / /
45 DESICCANT DISCHARGE: (NOTE 5) NPS / / / / / /
46 SAFETY VALVE: (NOTE 5) NPS / / / / / /
47 / / / / / /
48 / / / / / /
49 NOTES
50 4) BY VENDOR.
51 5) SIZE / RATING /FACING / FINISHING TO BE FINALIZED AFTER RECEIPT OF VENDOR DATA.
52
53
54
55
56
57
58
59
60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 8 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 MATERIALS REQUIRED DATA SUPPLIER DATA


2 TOWER SHELL
3 TOWER HEADS
4 TOWER FLANGES
5 GASKETS Asbestos free
6 TOWER INTERNALS
7 STEEL STRUCTURE
8 PIPING (NOTE 6)
9 VALVES
10 FOUNDATION BOLTS
11
12
13
14 SAFETY VALVES REQUIRED DATA SUPPLIER DATA
15 No. REQUIRED / ITEM / /
16 MANUFACTURER
17 BODY MATERIAL
18 INTERNAL MATERIALS
19 INLET FLANGE: (1) NPS / / / / / /
20 OUTLET FLANGE: (1) NPS / / / / / /
21
22 PREFILTERS REQUIRED DATA SUPPLIER DATA
23 No. REQUIRED / ITEM 2 / PK-2401-DR1-F1A/B /
24 MANUFACTURER
25 BODY MATERIAL
26 FILTERING MEDIUM MATERIAL
27 FILTRATION DEGREE µm / / / / / /
28 INLET FLANGE: (1) NPS / / / / / /
29 OUTLET FLANGE: (1) NPS / / / / / /
30 / / / / / /
31 POST FILTERS REQUIRED DATA SUPPLIER DATA
32 No. REQUIRED / ITEM 2 / PK-2401-DR1-F2A/B /
33 MANUFACTURER
34 BODY MATERIAL
35 FILTERING MEDIUM MATERIAL
36 FILTRATION DEGREE µm 3 / / / / / /
37 INLET FLANGE: (1) NPS / / / / / /
38 OUTLET FLANGE: (1) NPS / / / / / /
39 / / / / / /
40 NOTES
41 6) INLET/ OUTLET PIPING MATERIAL ARE CARBON STEEL GALVANIZED.
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 9 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 INSTRUMENTATION
2 TEMPERATURE No. LOCAL TRANSMITTER PANEL CONTROL ROOM
3 x EACH VESSEL x x x
4 x UPSTREAM PREFILTERS x x x
5 x UPSTREAM POST FILTERS x x x
6
7
8 PRESSURE No. LOCAL TRANSMITTER PANEL CONTROL ROOM
9 x EACH VESSEL x x x
10 x DIFFERENTIAL PRES. ON PREFILTERS x x x
11 x DIFFERENTIAL PRES. ON POST FILTERS x x x
12 x DIFFERENTIAL PRESSURE DRYER UNIT x x x
13
14 OTHER INSTRUMENTS @ PACKAGE B.L. No. LOCAL TRANSMITTER PANEL CONTROL ROOM
15 x DEW POINT ANALYSER x x x x
16 x Pressure x x x x
17 x Temperature x x x x
18
19
20
21
22 ALARMS AND SHUTDOWN M BY MFR. O BY OTHERS No. OF CONTACTS PANEL CONTROL ROOM
23 (NOTE) A ALARM T TRIP R RECORDER A T A T R
24 HIGH DIFFERENTIAL PRESSURE
25
26
27
28
29
30 EXTENSION OF SUPPLY ( X INCLUSION)
31 X BASE PLATE X SHOP TESTS
32 FOUNDATION BOLTS X DESICCANT CHARGES No. 1(one)-initial filling
33 X STEEL STRUCTURE X SPARE PARTS FOR START-UP
34 X PREFILTERS X SPARE PARTS FOR 2 YEARS OF OPERATION(SEPATATE QUOTE)
35 X POST FILTERS X SPECIAL TOOLS AND WRENCHES
36 X INTERCONNECTING PIPING (INSIDE SKID) X INSTRUCTION MANUALS No. COPIES (IN ENGLISH)
37 X VALVES X LOCAL CONTROL PANEL (POWER & PLC) (NOTE 7)
38 X INSTRUMENTATION X COMPRESSOR AIR INTAKE FILTR
39 X SAFETY VALVES
40 X SILENCER ON DECOMPRESSION LINE
41 X DRYER BY - PASS LINE
42 NOTES
43 7) ONE COMMON UNIT PANEL SHALL BE PROVIDED FOR THE WHOLE PACKAGE BY VENDOR.
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 10 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 SERVICE AIR RECEIVER ITEM PK-2401-VV1


2 DESIGN DATA
3 DESIGN CODE ASME ASME STAMP
4 DESIGN TEMPERATURE 85 °C DESIGN INTERNAL PRESSURE 11 bar(g)
5 OPERATING TEMPERATURE MIN / NORM / MAX / By Vendor / °C
6 OPERATING PRESSURE MIN / NORM / MAX / By Vendor / bar(g)
7 MAX ALLOWABLE WORKING PRESSURE MPa
8 DESIGN EXTERNAL PRESSURE bar AT A TEMPERATURE OF °C
9 MIN DESIGN METAL TEMPERATURE 5.1 °C AT A PRESSURE OF 0 bar(g)
10 FLUID TYPE LP COMPRESSED AIR
11 LETHAL FLUID CAUSTIC FLUID H2 PARTIAL PRESSURE bar
12 FLUID DENSITY AT OPERATING CONDITION MIN / NORM / MAX / 10.61 / kg/m³ A2
13 INTERNAL PAINTING EXTERNAL PAINTING
14 THERMAL INSULATION I F PP (Note 3) INSULATION THICKNESS mm
15 ELEV. ABOVE GROUND (Note 4) mm HEADS TYPE Elliptical (2:1) PWHT (Notes 1)
16 MATERIALS
17 SHELL KCS (Note 8) STUD BOLTS
18 INTERNALS (Note 5) NUTS
19 FLANGES SUPPORTS
20 NOZZLE NECK FROM PIPE INTERNAL BOLTING
21 NOZZLE NECK FROM PLATE GASKETS
22 SHELL HEAD JOINT EFFIC. X RAY EXAM.
23 CORROSION ALLOW. mm 3 3 SHELL %
24 CLADDING THK. mm HEAD %
25 INTERNAL LINING THK. mm
26 LOADS AT SUPPORT BASE HYDROSTATIC TEST PRESSURE MPa
27 WIND
ERECTION OPERATING TEST
28 EARTHQUAKE
29 M N-m VOLUME m³
30 T N EMPTY MASS kg
31 Q N TO BE TESTED BY
32 NOTES(on page 14)
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 11 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 LIST OF CONNECTIONS (Note 1)


2 DIAMETER THK. POSITION PROJEC.
ITEM SERVICE TYPE RATING FACING
3 NPS mm mm mm
4 V VENT VTA 150# RF
5 B OUTLET VTA 150# RF
6 W RELIEF VALVE VTA 150# RF
7 P PRESSURE GAUGE VTA 300# RF
8 M MANWAY VTA 150# RF
9 F FEED VTA 150# RF
10 L1A LEVEL GAUGE VTA 300# RF
11 L1B LEVEL GAUGE VTA 300# RF
12 D DRAIN VTA 150# RF
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42 NOTES
43 1) SIZE, NUMBER AND TYPE OF CONNECTIONS TO BE PROVIDED/CONFIRMED BY VENDOR.
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 12 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 Sect. CYLINDRICAL COMPONENTS


2 No. No. Description Length Diameter
3 PK-2401-VV1 - AIR RECIVER (Note 1) 7,600 mm 1,900 mm A2
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 Sect. CONICAL COMPONENTS
26 No. No. Description Length Max. Diameter Min. Diameter
27 mm mm mm
28
29
30
31
32
33
34
35
36 LEVEL RANGE
Sect. No. Sect. No. Sect. No. Sect. No. Sect. No.
37 AND POSITION
38 LSHH-HLL mm mm mm mm mm
39 LSH-HLL
40 HLL-LLL
41 LLL-LSL
42 LLL-LSLL
43 TL-LSLL
44 TL-LSL
45 TL-LLL
46 LAHH
47 NOTES
48 1) SIZE, NUMBER AND TYPE OF CONNECTIONS TO BE PROVIDED/CONFIRMED BY VENDOR.
49
50
51
52
53
54
55
56
57
58
59
60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 13 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 Sect. Min. Operating Nor. Operating Max. Operating Design M.D.M.T.


M.D.M.T.
2 No. Temperature Temperature Temperature Temperature @ Pressure of
3 °C °C °C °C °C Mpa
4
5
6
7
8
9
10
11
12
13
14
15
16
17 Sect. Min. Operating Nor. Operating Max. Operating Design Design External Max. Allowable
18 No. Pressure Pressure Pressure Pressure Pressure Work Pressure
19 MPa MPa MPa MPa MPa MPa
20
21
22
23
24
25
26
27
28
29
30
31
32
33 Sect. NACE HIC Therm. Therm. Insul. Shell Inter. Cladd. Corrosion Cladding Internal Lin.
PWHT Lining
34 No. Serv. Serv. Insul. Thickness Mat. Mat. Mat. Allowance Thickness Thickness
35 mm mm mm mm
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 14 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 1) PWHT: POST WELD HEAT TREATMENT


2 2) NUMBER, SIZE, RATING AND FACING OF NOZZLE TO BE CONFIRMED BY INSTRUMENT GROUP
3 3) I= HOT INSULATION, F= COLD INSULATION, PP= PERSONAL PROTECTION
4 4) MINIMUM FOR PIPING.
5 5) DEMISTER MATERIAL: SS304; SUPPORTS: KCS.
6 6) MAX ALLOWABLE PRESSURE DROP ON DEMISTER DEVICE: 0.05 BAR.
7 7) Deleted A2
8 Deleted A2
9 8) THE LOWER PART OF THE VESSEL SHALL BE PROVIDED INTERNALLY WITH A PROTECTIVE COATING.
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61 ###
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 15 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1
2 1. Fluid handled : AIR + MOISTURE
3
4 2. Air trap type to be specified by vendor
5
6 3. OPERATING CONDITIONS
7
8 Water Flow rate (kg/h): BY VENDOR
9 Inlet Pressure (barg): 4.5 min - 8.7 max
10 Max allowable Pressure drop (bar): 8.7 (Note 2)
11 Inlet Temperature (°C): 45
12
13 4. MECHANICAL DATA
14
15 Design Pressure (barg): 11
16 Design Temperature (°C): 85
17 Inlet Connection (size/rating): BY VENDOR
18 Outlet Connection (size/rating): BY VENDOR
19
20 5. Material: CS
21
22
23
24
25
26 Notes:
27 (1) Inlet strainer to be provided.
28 (2) Air Trap discharge to atmosphere.
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

60
61
Owner: Contractor:
Engineering Service for Pasargad Qeshm Utility Production Plant

DOCUMENT No.

PRJ Unit Phase Dep. Doc. Seq. Rev.


Page 16 of 16
180 24 ED PR DSH PK2401 A2

PROCESS DATA SHEET Rev.

1 1) REFERE TO 180-24-ED-PR-PID-0001 AND 0002


2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

You might also like