Consultant: Review and Completion of detail design and preparation of Client:
Page A0 A1 A2 A3 B0 B1 B2 B3 Page A0 A1 A2 A3 B0 B1 B2 B3
1 41
2 42
3 43
4 44
5 45
6 46
7 47
8 48
9 49
10 50
11 51
12 52
13 53
14 54
15 55
16 56
17 57
18 58
19 59
20 60
21 61
22 62
23 63
24 64
25 65
26 66
27 67
28 68
29 69
30 70
31 71
32 72
33 73
34 Appendix
35 1
36 2
37 3
38 4
39 5
40 6
Document Revision
This document is the sole property of Scetiran Consultant Engineers Co., all information contained herein may neither be reproduced, used, disclosed, transmitted nor in any
way made public without permission of the owner
Consultant: Review and Completion of detail design and preparation of Client:
Table of Contents
Table of Contents ........................................................................................................................ 3
1. GENERAL .......................................................................................................................... 4
1.1 INTRODUCTION ...................................................................................................... 4
1.2 SCOPE ........................................................................................................................ 4
1.3 DEFINITIONS ........................................................................................................... 4
1.4 SITE CONDITION ..................................................................................................... 4
1.5 REFERENCE ............................................................................................................. 5
1.6 LIST OF REFERENCE DOCUMENTS .................................................................... 5
2. 230V AC CONSUMPTION LIST...................................................................................... 6
3. Duty Cycle .......................................................................................................................... 7
4. Number Of Battery Cells .................................................................................................... 7
5. Cell Size Calculation .......................................................................................................... 8
6. Battery Charger Calculation ............................................................................................... 8
7. 230V AC UPS System Configuration Summary ................................................................ 8
8. Attachment .......................................................................................................................... 9
This document is the sole property of Nasr-Scetiran Joint Venture, all information contained herein may neither be reproduced, used, disclosed, transmitted nor in any way
made public without permission of the owner
Consultant: Review and Completion of detail design and preparation of Client:
1. GENERAL
1.1 INTRODUCTION
The purpose of this project is to use the services of a consulting engineer to validate and
endorsement the existing design studies, Completion of detail design, Carry out safety studies
and consider its results in design and in the remaining works of both stations, prepare accurate
estimates as well as prepare EPC Tender documents for both stations (ardestan-dehshir) on
IGAT VIII.
1.2 SCOPE
The purpose of this document is to define parameters and criteria used to size UPS system capacity.
Compliance by the VENDOR with this calculation does not relieve him of the responsibility of
supplying UPS systems and back up batteries of a proper design suited to required power at specified
service condition.
Deviations from this calculation are only acceptable when the VENDOR has listed in his quotation
the requirements he cannot, or does not wish to comply with, and the CONTRACTOR has accepted in
writing the deviations before the order is placed.
In the absence of a list of deviations, it will be assumed that the VENDOR complies fully with this
calculation.
1.3 DEFINITIONS
Project: Review and Completion of detail design and preparation of EPC tender documents for
ardestan/dehshir gas compressor stations
Contractor: Means the person(s) named as a contractor in the contract agreement and the legal
successors in title to this person(s).
This document is the sole property of Nasr-Scetiran Joint Venture, all information contained herein may neither be reproduced, used, disclosed, transmitted nor in any way
made public without permission of the owner
Consultant: Review and Completion of detail design and preparation of Client:
1.5 REFERENCE
Through this calculation the following dated or undated standards/codes are referred to.
For undated reference, the latest edition of referenced document (including any supplement or
amendments) applies. For dated references, the edition cited applies.
The applicability of changes in dated references that occur after the edition cited date, shall mutually
be approved by CONTRACTOR.
IEEE Standard 1115 Recommended Practice for Sizing Nickel-Cadmium Batteries for Stationary
Applications
IEEE Standard 946 Recommended Practice for the Design of DC Auxiliary Power Systems for
Generating Stations
IEEE Standard 446 Recommended Practice for Emergency and Standby Power Systems for
Industrial and Commercial Applications
IEEE Standard 666 Design Guide for Electric Power Service Systems for Generating Stations
This document is the sole property of Nasr-Scetiran Joint Venture, all information contained herein may neither be reproduced, used, disclosed, transmitted nor in any way
made public without permission of the owner
Consultant: Review and Completion of detail design and preparation of Client:
This document is the sole property of Nasr-Scetiran Joint Venture, all information contained herein may neither be reproduced, used, disclosed, transmitted nor in any way
made public without permission of the owner
Consultant: Review and Completion of detail design and preparation of Client:
3. Duty Cycle
According to the above 230V UPS consumption list, duty cycle for this system would be as figure 1.
Since the batteries configuration is 2x100%, therefore the duty cycle is shown based on the total of load
current.
I (A)
163.2
t(min)
120
Fiqure 1: 230VAC Duty cycle
This document is the sole property of Nasr-Scetiran Joint Venture, all information contained herein may neither be reproduced, used, disclosed, transmitted nor in any way
made public without permission of the owner
Consultant: Review and Completion of detail design and preparation of Client:
8. Attachment
This document is the sole property of Nasr-Scetiran Joint Venture, all information contained herein may neither be reproduced, used, disclosed, transmitted nor in any way
made public without permission of the owner
Date : 2020/10/21
Battery proposal
Proposed battery 1 x 181 x SBM 625
Technical specifications
Sizing method IEEE I
Amperes
170
136
102
68
34
0
00mn 20mn 40mn 60mn 80mn 100mn 120mn
Range : SBM
No. of cells : 181
Final voltage/cell : 1.144 V
Nominal temperature : 20.0°C
Minimum temperature : 10.0°C
Maximum temperature : 40.0°C
Maximum Section Size 564.54 + Random Size 0.00 = Uncorrected Size 564.54
Uncorrected Size 564.54 x Design Margin 1.00 x Aging Factor 1.10 = 620.99
When the cell size is greater than a standard cell size, the next larger cell is required.
The required cell size is 620.99 Amperes-hours. Therefore cell SBM 625 is required