You are on page 1of 4

March ISSUED

0
2020 FOR BID RAN MS ELA
EPPM RC
DESCRIP
Rev Date APPROV APPROV
TION
ED ED

JOB No. :‫ﻋﻣل رﻗم‬

‫ﺗﻘﯾﯾم‬
‫ﻋﻣﻠﯾﺔ‬
Evaluat ‫ﻣﻌﺎﻟﺟﺔ‬
ion of ‫اﻟﻣﯾﺎه‬
Reduce ‫ﺑﺗدﻓﻖ‬
d Flow ‫ﻣﻧﺧﻔض‬
Operati ‫ﻟﻣﺣطﺗﻲ‬
on at ‫ﻣﻌﺎﻟﺟﺔ‬
SWTP ‫ﻣﯾﺎه‬
and ‫اﻟﺻرف‬
IWTP ‫اﻟﺻﺣﻲ و‬
‫اﻟﺻﻧﺎﻋﻲ‬

FACILITY No. 122-C01/123-C01 122-C01/123-C01 : ‫رﻗم اﻟﻣﻧﺷﺎة‬


CONTRACT No. 02H-T13 02H-T13 :‫رﻗم اﻟﻌﻘد‬
IWTP -
REDUC
ED
FLOW
PENST
OCK
VALVE
DATA
SHEET
Document N°
0 2 H - T 1 3 - G 6 5 - 2 0 J I - M A - 0 0 9
NO. 02H-T13-G65-20JI-MA-009
IWTP - REDUCED FLOW PENSTOCK VALVE DATA SHEET REV. 0
SHEET : 2 of 4

REVISIONS REVISIONS
SHEETS 0 SHEETS
1* X 35
2** X 36
3 X 37
4 38
5 39
6 40
7 41
8 42
9 43
10 44
11 45
12 46
13 47
14 48
15 49
16 50
17 51
18 52
19 53
20 54
21 55
22 56
23 57
24 58
25 59
26 60
27 61
28 62
29 63
30 64
31 65
32 66
33 67
34 68
Note : * front page
** this page
REVISIONS REPORT
REVISION REASON FOR ISSUE
0 ISSUED FOR BID
NO. 02H-T13-G65-20JI-MA-009
IWTP - REDUCED FLOW PENSTOCK VALVE DATA SHEET REV. 0
SHEET: 3 of 3
SLUICE GATE
1 GENERAL
2 Applicable to Proposals Purchase As built
3 Project Evaluation of Reduced Flow Operation at SWTP and IWTP
4 Customer Royal Commission Location Ras Al Khair, KSA Site Industrial City
5 Item Sluice Gate Type Penstock
Tag No. SG-120
6 No. of Units 1 P&ID 123-350-22RA-PE-018 Manufacturer
7 Purchase order number - Model Serial number
8 SITE AND UTILITY DATA
9 Location Indoor Outdoor Under roof
10 Electrical area classification
Environm
11 ental Site Winterization Tropicalization
data
12 Altitude 24 m Barometer - KPa abs
13 Range of ambient Temp. Min 0 °C Max 50 °C
14 Relative humidity Min 10 % Max 100 %
15 Unusual conditions Salt atmosphere Dust Hot
16 Fumes Other
17 OPERATING CONDITIONS
18 Design flow rate Normal 300 l/s Maximum l/s
19 Operating Pressure Min ATM+Liq level Operating Temperature (°C) 16-45
20 Type Manual-Penstock-Wall mounted
21 Velocity - Fluid handled Raw sewage
22 Leakage Rating (*) Sealing On both sides (on & off seating)
23 Channel Dimensions 41.850 (Width) 112.100 m (Length) Liquid level 4.5 m
24 TECHNICAL REQUIREMENTS
25 Design Code (*) Design Pressure (*)
26 Design Temperature (°C) 75 Spindle Type Rising
27 Sealing details Double Mounting Depth 5000 mm
28 Operating torque (*) Opening 600 mm
29 Console Height (*) Penstock Height (*)
30 ACCESSORIES
31 Rising Stem Resilient Seated (EPDM)
32 Guide shoes Hand Wheels
33 Actuator Manual Reducer
34 Lifting Lugs Cover
35 Frame Seals and wedges
36 MATERIAL OF CONSTRUCTION
37 Wetted parts SS 316
38 Frame AISI 316 (1.4401) Console AISI 316 (1.4401)
39 Guide AISI 316 (1.4401) Hand Wheel Aluminium
40 Gate AISI 316 (1.4401) Sealing EPDM
41 Stem AISI 316 (1.4401) Fastening Material A4
42 Non-wetted parts Bearing Cone: Bronze/ Spindel Protection Tube:Polycarbonate/Housing:Derlin
43 INSPECTION AND TEST (1)
44 Welding Tests (NDT) Sealing Test
45 Operability Dry/Wet Hydrotest
46
47 Note:
48
49 Note 1: Factory tests shall be as per guided by the applicable test codes and standards
50

You might also like