Professional Documents
Culture Documents
Document Number
PECIKO PHASE 8A
PLATFORM MODIFICATION AND BOOSTER
COMPRESSOR INSTALLATION
CLASS : 1
0.4 30-Sept-2020 AFC Re-Approved for Construction WHY HYD / IYS AR 0.4
0.3 23-April-2020 AFC Approved for Construction WHY HYD / IYS AR 0.3
0.2 11-Nov-2019 IFA Issued for Approval WHY HYD / IYS AR 0.2
0.1 18-Oct-2019 IFC Issued for Comment WHY HYD / IYS AR 0.1
This document is the property of Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
of the COMPANY. Electronic Filename: ID-PCK-SWPG-2009-520094_rev0.4.pdf
Contract : 4500010646
Document Number
REVISION REVISION
SHEET SHEET
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9
1 X X X X 31
2 X X X X 32
3 X X X X 33
4 X X X X 34
5 X X X X 35
6 X X X X 36
7 37
8 38
9 39
10 40
11 41
12 42
13 43
14 44
15 45
16 46
17 47
18 48
19 49
20 50
21 51
22 52
23 53
24 54
25 55
26 56
27 57
28 58
29 59
30 60
This document is the property of Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
of the COMPANY. Electronic Filename: ID-PCK-SWPG-2009-520094_rev0.4.pdf
Contract : 4500010646
Document Number
COMMENT TABULATION
This document is the property of Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
of the COMPANY. Electronic Filename: ID-PCK-SWPG-2009-520094_rev0.4.pdf
Contract : 4500010646
Document Number
TABLE OF CONTENTS
1. INTRODUCTION.........................................................................................................................................5
1.1 Project Overview.................................................................................................................. 5
1.2 Project Purpose................................................................................................................... 5
2. DOCUMENT SCOPE.................................................................................................................................5
3. APPENDICES..............................................................................................................................................6
Appendix – 1: Summary Mechanical Test For Welder Performance Qualification (WPQ)
Piping............................................................................................................................................ 7
This document is the property of Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
of the COMPANY. Electronic Filename: ID-PCK-SWPG-2009-520094_rev0.4.pdf
Contract : 4500010646
Document Number
1. INTRODUCTION
1.1. Project Overview
Peciko field in Mahakam delta (East Kalimantan) is located about 25 kilometers south east of
Senipah Terminal, this field is producing gas and condensate where originally designed for HP
production mode and remotely monitored from onshore with using hyraulic ESD system in
WHCP and RTU PLC for PCS and telemetry system, and interconnected by trunk line with
telecommunication is via point to point to SPS Onshore (Senipah).
Today, all Peciko platforms produce in LP mode, therefore platform modification is required to
increase the production then enhance the economical value of this facility.
2. DOCUMENT SCOPE
The purpose of this document is to propose Mechanical Test for New Welder
piping to execute Peciko Phase 8A Project
This document is the property of Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
of the COMPANY. Electronic Filename: ID-PCK-SWPG-2009-520094_rev0.4.pdf
Contract : 4500010646
Document Number
3. APPENDICES
Appendix – 1 : Summary Mechanical Test For Welder Performance Qualification (WPQ) Piping
This document is the property of Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission
of the COMPANY. Electronic Filename: ID-PCK-SWPG-2009-520094_rev0.4.pdf
Contract : 4500010646
Document Number
Appendix – 1: Summary Mechanical Test For Welder Performance Qualification (WPQ) Piping
This document is the property of Pertamina Hulu Mahakam and shall not be disclosed to third parties or reproduced without permission