LIKELIHOOD
4 4 1 7 4 Likely 7 12 17 21 24
5 5 1 11 3 Possible 4 8 13 18 22
6 1 2 3 2 Unlikely 2 5 9 14 19
7 2 2 5 1 Rare 1 3 6 10 15
8 3 2 8
9 4 2 12
10 5 2 16 CONSEQUENCES
11 1 3 6 1 2 3 4 5
12 2 3 9 Insignificant Minor Moderate Major Catastrophic
13 3 3 13 5 Certain High High Extreme Extreme Extreme
LIKELIHOOD
14 4 3 17 4 Likely Medium High High Extreme Extreme
15 5 3 20 3 Possible Low Medium High Extreme Extreme
16 1 4 10 2 Unlikely Low Low Medium High Extreme
17 2 4 14 1 Rare Low Low Medium Medium High
18 3 4 18
19 4 4 21
20 5 4 23 Risk Level Priority Example Action Actions to Maximise Opportunity
21 1 5 15 Detailed research and planning Intolerable limit, change process or
22 2 5 19 required; determine whether activity work method, Detailed research and
23 3 5 22 Extreme 1 or task should be stopped pending planning required; high payoff
24 4 5 24 further investigation potential; pursue opportunity
25 5 5 25 aggressively
Senior management attention; Additional long term risk reduction
immediate corrective and preventative required with ALARP region
High 2 action required Near term opportunity with above
average rate of return;
pusue diligently
Medium 3 Management responsibility assigned; Opportunity to realise average rate of
correctivebyand
Manage preventative
routine action
procedures; return with
Manage bycertainty pusue with Risk
routine procedures,
Low 4 accept risk Is tolerable
SEML RISK MATRIX
Legend applies to identified SHE risks
(see guidance documents for additional explanations)
Likelihood Descriptions & Index Low = Manage by routine procedures, Risk Is tolerable
(with confirmed safeguards)
Medium = Opportunity to realise average rate of return with certainty pusue with
existing plans.
Acceptable after review of the operation
Legend Managers' attention is required to address the risk management
High = Additional long term risk reduction required with ALARP region and required
leader decision
Near term opportunity with above average rate of return; pusue diligently
GM/VPs' to address the risk management
Likelihood Descriptions Likelihood Indices
Extreme = Unacceptable and Intolerable limit, change process or work method
and urgent action is required to address the risk Detailed research and planning
required; high payoff potential; pursue opportunity aggressively
Requires Board of Directors attention and continuousely monitor
Safety First Aid Injury. Medical Treatment Injury. Single Lost Time Injury or Fatality/death or 3 or
Multiple Fatality(s)/death
(Acute Injuries) Nuisance value. Restricted Work Injury 3 MTI in one incident more people hospitalized
Isolated and personal a) Rumour demonstration a) Rumour demonstration a) Demonstration > 21 National and/or
complaint. < 20 persons > 20 persons persons or with violent International media
b) Real Demonstration < b) Real Demonstration intent (blockage access) interest (Negative
10 persons 10-20 persons & High level of concern or implications), major
c) New-negative interest from local demonstration offences
implication (sosmed) community and local
External goverment.
Relation/Community b) New-negative
implication (lokal media)
c) Impacted with
continuation operational
business process
Process loss less than Process >$,500 - $25,000 Process >$ 25,000 - Un-planned shut down Un-planned shut down
<$,500 or recoverable $200,000 or Power Plant caused Process loss caused Process loss
Operational process upset trip >$200,000 -$500,000 >$500,000
Minor technical/legal Required internal Regulator warning Major breach of regulation Operation suspended,
compliance issue unlikely investigation resulting in investigation revoke of industrial
to attract a regulatory by regulator. license
Legal Compliance response. Civil/Legal proceeding
resulting in fines/penalties
Financial $ 10,000,000 -
$ 0 - $ 500 $ 500 - $ 1,000,000 $ 1,000,000 - $10,000,000 >$50,000,000
(Project/Operation) $50,000,000
Major
Property Damage <$,500 <$500-$25,000 $25,000-$200,000
>$200,000-$500,000
Catastrophic >$500,000
RISK ASSESSME
DEPARTMENT: PREPARED BY: REVIEWED
AFFECTED GROUP:
Impairment Safety
Working at Height Permit Work in Exposed/Congested area
Device
LOW: MEDIUM:
Risk Is Tolerable Acceptable after review of the operation. Supervisor's attention is
required to address the risk management
INITIAL RATINGS
NO ACTIVITY HAZARD
L C R
CHEMICAL : H2S 2 4 14
TAKE VIBRATION
2 DATA OF ROTATING
EQUIPMENT
NOISE 1 2 3
HOT SPOT 2 1 2
ROTATING EQUIPMENT 2 3 9
BIOLOGY : INHALATION, 2 2 5
IRITATION, EYE CONTACT
CHEMICAL : H2S 2 4 14
BAD HANDLING/ERGONOMIC 2 2 5
WORK WASTE 2 2 5
4 HOUSEKEEPING
CHEMICAL : H2S 2 4 14
NOTE:
* L= Likelihood; C= Concequence; R= Risk; RR= Residual Risk
* Don't forget to adjust the existing format
RISK REGISTER NO:
ASSESSMENT
New Revised
✘
PREPARED DATE:
Job Owner Facility Owner SHE
7 Okt 2022
Facility Owner
VALID TILL:
25 Okt 2022
Area Authority
Abrasive
✘ High Risk Electrical
Blasting
Energy Isolation Excavation Permit
HIGH: EXTREME:
ration. Supervisor's attention is Additional long term risk reduction required Unacceptable and Intolerable limit: Requires Board of Directors attention and c
gement with ALARP region and required monitor
management decision (GM and/or VPs')
ASSIGNED
RESIDUAL RATINGS
HAZARD CONTROLS PERSON
L C RR
TVP, O&M
4.2.1 COLLECT WASTE IN THE PROVIDED PLACE 1 1 1
Personil
ATE:
STATUS