Risk Assessment Plan

Overview:

The purpose of risk management is to exert influence and control on factors that could
have a negative impact on the Health, Safety and Welfare at work for ThirdForce
employees, visitors and contractors.

The Risk Assessment Plan provides the framework to manage Health & Safety on an
ongoing basis to ensure optimum safety levels are maintained and compliancy
requirements are intact.

Frequency:

Risk Assessments will be conducted on an annual basis (June/July) in Dublin, London and
the Field. These Risk Assessments will follow the adopted risk assessment methodology
and will be comprehensively captured and auctioned upon where applicable.

Methodology:

As recommended by IBEC and HeartBeat (our Safety Advisors) the below risk assessment
methodology has been adopted by ThirdForce, this is referred to as the Risk Matrix.

Risk Assessment & Risk Matrix - ThirdForce


Likelihood Index

2 2
Almost Certain 5 5 5 10 15 0 5
1 2
Very Likely 4 4 4 8 12 6 0
Severity

1 1
Likely 3 3 3 6 9 2 5
1
Less than Likely 2 2 2 4 6 8 0
Very Unlikely 1 1 1 2 3 4 5
1 2 3 4 5
Severity Index Likelihood

1- Low
Death 5 5 Risk
6- Medium
Permanent severe incapacity 4 15 Risk
16 - High
Injury with 1-2 weeks recovery time 3 25 Risk
Minor injury 2
No human injury 1
Actions:

Depending on the score of each hazard identified, suitable control measures will be put
in place to manage the risk and minimise the potential danger that may follow.