3. Tripping Hazards Personnel Injury G 8 9 1. Area housekeeping. 1. Make sure the cables & material are SPA: Welding G 2 3 Yes
(cables, materials Escape route should properly placed avoiding tripping hazards. Supervisor.
etc.) remain unobstructed; 2. Clearly mark escapes routes. Safety/Fire
cables away from Follow good cables layout practices, Watch
pedestrians walk way. minimizing tripping hazards & cable
3. Area barricading. damages.
3. Avoid unauthorized entry of non-
essential personnel in working area
barricading.
9. Falling object/Fall 1. Personal injury 1. PPE’s 1. All the workforce required to use SPA: Scaffolding Yes
from height 2. Asset loss F 7 9 2. Proper storage of mandatory PPE’s Supervisor F 2 4
tools 2. Barricade the area where erection of Safety
3. Proper material scaffolding is in progress Watchman,
handling 3. Restrict the unauthorized entry
4. Install toe Boards 4. Proper railing system should be erected
to prevent the falling of personnel.
5. All the material should be bring.
up/down with sack and rope
6. Don’t drop or throw materials from
height.
1. Snake bite Kit.
2. GCM/TBT 1. Don't handle snake yourself, call
Bite of insect and 3. Snake sighting security person
Biological Hazards
snake may lead
(Snakes, Bees, wasps, protocols 2. Apply insect repellents Supervisor,
10. fatal. E 6 9 E 2 4 Yes
mosquitoes & Other
(malaria, Dengue,
4. Insect repellents 3. Don't put hand where you cannot see Safety Watch
insects) 5. Emergency vehicle 4. Avoid working alone
Skin allergy)
with alert driver 5. Avoid working in poor light areas
Authorizing