1.4 Cable, Failure of Abnormal Serious 3 5 H All the Lifting tool & tackles Site
Transformer Lifting Sling Injury/ fatal must be checked EC L Enginee
Loading or D- physically before use. r
unloading & Shackles All the lifting toll & tackles
EC
must be test certificate.
The access and
approaches for crane
should be free from AC
obstacles.
Crane operator must be
having valid license and
good experience about the
Crane operation. EC
Load should not exceed
the capacity of crane.
EC
The lifting belt or sling and
D-Shackle use according
the load, the safe lifting EC
capacity of lifting tool &
tackles always greater than
the load.
During the loading &
unloading material Tag
Line must be used to EC
control the stability of lifted
load.
No one shall be allowed to
stand on the truck/ lorry
during material loading/ AC
unloading cable drum.
Only trained signal man
shall give the direction to
crane operator. AC
AC
Environment Normal Environme 2 2 L Crane must be certified by AC L
pollution nt pollution authorized agency for
due to hydra due to Pollution under control
crane smoke of Certificate (PUC).
smoke. hydra Crane or Hydra must be
crane. certified by approved
agency for fitness of hydra
EC
in appropriate form of
government factory Rule.
Collision due Serious Abnormal Fatal or 1.6.1 Unauthorized driving AC L
to improper accident or serious 3 5 H must be avoided.
driving unwanted injuries of
Unsafe Act major workmen 1.6.2 Vehicle driver must AC
accident or nearby have valid driving license.
happen people Site
1.6 1.6.3 .Driving or travel or AC Enginee
Damage of shifting of material should r
vehicle or avoid during bad weather.
materials. Smoke/Drinks must be AC
prohibited during/before
driving.
_______________________
PM Safety Officer
E=Elimination
S=Substitution
EC=Engineering controls
AC=Administrative controls