Name Of Activity: Material Handling


Hazard
evolving Risk /  Hierarchy
Hazard / Residual
Sl Normal / Possible Probability Severity Impact Control of Action
Activity Environment Existing Control Measures Risk /
No Abnormal / Outcome Rating Rating Level Risk E/ S/ By
Aspect Impact
Emergency EC/ AC/
Situation PPE
Material
1.
Handling
Until and Abnormal Facing Identify the route with the
Identification
unless the difficulties help of survey so that the
of safe
approach during the material reaches or AC
approach
and shifting of transported at required
before material
transportation unloading location or near by
point is and many location.
identified unwanted
Ensure the proper route
properly, the incident
with map, survey & with
material may be
local person to avoid any
should not happen AC Site
toppling of vehicle during
1.1 be due to not 3 4 M L Enginee
transportation.
dispatched. availability r
It may or
cause lot of suitability
hindrance of
and hazard approach.
during the
course of
shifting and
unloading
material
1.2 Manual Fall of Abnormal Serious Follow kinematic way of
Shifting or Material/ Injury lead material lifting –
loading/ fatal 3 4 M Assessment of the load, EC L
Person
unloading accident Route or path through
which object is going to be
handled.
How many people required
for carrying the load.
Physical condition of the
load.

STEP-1 POSITION THE


FEET
STEP 2: CORRECT
GRASP
STEP 3 STRAIGHT BACK Site
AND BENT KNEES Enginee
STEP 4: LOAD CLOSE TO r
THE BODY
STEP 5: TUCK YOUR
CHIN IN
STEP 6: KEEP BODY
WEIGHT DIRECTLY
OVER FEET AND LIFT
WITH LEGS.
Use proper PPE’s Like
Safety shoes, Hand gloves
& safety Helmet.
Activity should not go in
hurry manner. It should go
steady and safe.

Never insert crow bar in Site


Hit by crow Serious
1.3 Tilting of pole Abnormal 3 3 M the pole hock for tilting the EC L Enginee
bar Injury
pole. r

1.4 Cable, Failure of Abnormal Serious 3 5 H All the Lifting tool & tackles Site
Transformer Lifting Sling Injury/ fatal must be checked EC L Enginee
Loading or D- physically before use. r
unloading & Shackles All the lifting toll & tackles
EC
must be test certificate.
The access and
approaches for crane
should be free from AC
obstacles.
Crane operator must be
having valid license and
good experience about the
Crane operation. EC
Load should not exceed
the capacity of crane.
EC
The lifting belt or sling and
D-Shackle use according
the load, the safe lifting EC
capacity of lifting tool &
tackles always greater than
the load.
During the loading &
unloading material Tag
Line must be used to EC
control the stability of lifted
load.
No one shall be allowed to
stand on the truck/ lorry
during material loading/ AC
unloading cable drum.
Only trained signal man
shall give the direction to
crane operator. AC

Hydra shall not be used at


site in any circumstances.
No one shall be allowed to AC
stand on the truck/ lorry
during material loading/
unloading, it may hit the
AC
workmen.
Never stands under the
hanging materials.

AC
  Environment Normal Environme 2 2 L Crane must be certified by AC L
pollution nt pollution authorized agency for
due to hydra due to Pollution under control
crane smoke of Certificate (PUC).
smoke. hydra Crane or Hydra must be
crane. certified by approved
agency for fitness of hydra
EC
in appropriate form of
government factory Rule.
Collision due Serious Abnormal Fatal or 1.6.1 Unauthorized driving AC L
to improper accident or serious 3 5 H must be avoided.
driving unwanted injuries of
Unsafe Act major workmen 1.6.2 Vehicle driver must AC
accident or nearby have valid driving license.
happen people Site
1.6 1.6.3 .Driving or travel or AC Enginee
Damage of shifting of material should r
vehicle or avoid during bad weather.
materials. Smoke/Drinks must be AC
prohibited during/before
driving.

_______________________
PM Safety Officer

E=Elimination
S=Substitution
EC=Engineering controls
AC=Administrative controls
PPE=Personal Protective Equipment