Professional Documents
Culture Documents
Hazard
evolving Possible Risk / Hierarchy
Hazard / Residual
Sl. Normal / Outcome Probability Severity Impact Existing Control Measures Control of
Activity Environment Risk / Actio
No Abnormal / Rating Rating Level Risk E/ S/
Aspect Impact
Emergency EC/ AC/
Situation PPE
Conductor
1
/Cable
Stringing
1.1 Shifting Si
Single & 1.1.1 Materials like
of cable or Hit & Fall of Engi
1.1 Abnormal Multiple 4 5 H Conductor drum shall be EC L
conductor Drum
Fatality transported to site carefully.
Drum
1.2 Cable/cond Hit & Fall of Abnormal Single & 4 5 H 1.2.1 Two jacks shall be EC L Si
uctor lying Drum Multiple placed on both sides of the Engi
on the Fatality. conductor drum and rod
ground. shall be inserted in the
middle of the cable drum.
1.2.2 Cable/conductor drum
should be placed over the EC
lifted jack and shaft. The
direction of rotation of the
drum has to be according to
the marking at the drum.
EC
1.4.13 Stringing activity
while being done on HT line
LC shall be taken of all HT
as well as all associated LT
lines. Normally in distribution
networks, plenty of
crossing / branch lines (HT /
LT) do appear which are
very close to our working
line (HT or LT). Such lines
(HT or LT) shall also be de-
energized by taking LC .
AC
1.4.14 Using Mobile phone
during work at height is
prohibited at site.
_____________________
PM Safety Officer
E=Elimination
S=Substitution
EC=Engineering controls
AC=Administrative controls
PPE=Personal Protective Equipment