You are on page 1of 17

Ept No. PageNo.

PLanin38
Aim
K lo Plane Ehe 9ien Work piece fo
Ehe YequLnedShape

Mateial Requined
Sothlaod of size 305x55x 55 mm
Tools Requned
*Jackplane *Bench Vice_ rySquane2

XMalKing gauge KSteelue Tepam Sad

*Rip Sau Fimel chiselX Mallet

ocedune

The givenLWork pie.ce 19 Ymls clampeol


inthebench Vice nd anu uo adjocenE
Sunfaces ae planeo to 9et nght an ale3
uSing Ehe jack plane
Expt. No. Page No. 2

X uSin9 Ehe EYu squa He he viqht


angles ploned faces_ane checKed
KNaHhe chen tuwo Sun fa ce9 aNe
planneol Eo ge Smoo-h Suface

*_Baged on the_planed SuHface8 Fhe


the
maKings ane madle m Ebe Eua sídes bs
uSingmajKinmg gauge-
*Afe mahK ing_ the ulor Kpie ce is
planned Such thab it shauld have
Yequaed dimenSion.8
Finclly he Finishe o jab is_checked
fox Yequuaed Sizo ging Ehe Steel Yle and
SquaHe
Expt. No.
Page No. 3

Re8ult
Thus Ehe Yeque Dimen8 gn 19s
obEoined hy planning
Expt. No. Page No. 1

Planing
Aim
T o Plane the yen oYK 1DiecefoY
Ehe YequinedShape

Mateuioal Requineod-
KSaLklaod o size3o5 x55 x 55 mm
Toos Requwied

Jock plane kBench Vice_ IySquane

*MaKinggauge - SteelrLe Tenon gaud_


*Rip 9au kivnelchisel ¥ Malet
oceduNe.
The gven LWorkpie.ce 13imlu_clampe
in Ehebench ice cnd anybuo aoljacen
Sunfo.ces ane planeolto get nght angles
taSing Ehe jack plone
Expt. No. Page No. 2

KuSinng Ehe Eyy Squase, Lhe vight


langlestplaned aces aHe_checKed

Nou)Ehe othe too Suna ces a1e


plannecl to get Smact h _suface
*Baged m Ehe planed SuH faceS Fhe
maKings aO made n the Ewa síles bs
LwSing majKing9 9aug.e-

K AteA manKing the ularkpie ce is


planned Such thatit shoudhave
Yequed _dumenS1on8

EinelLy the Einishe o o is_ohecked


fox Yequaed SizeuSing Ehe sEeel ruule and
J

Ey Squane
Expt. No. Page No. 3

ReSult
Thus Ehe YequuMEd Dimen8ian S
bEainec by plannLng
Expt. No. 2 Page No. 44

lee lap-Joint

Aim

lo maKe a Te lap-jant om the


gi/en wok piece

Mat.esual RequsAed'
*SoE uood ogze 2oox 5 x5o mm
Toolg Kequuned

JLck plane KBence Vice KTuSqLOIC


*Masking 9auge KSEeelYLe KTenonSaul

*Rip Soud K Eiime1 chisel KMallet


Procedune-
kThe iven waK piece is imly clamped
n 0 Ehe Co1pentry Vice and any tudo
adjacent SulfaceS ee planed Lo get
ight angles using the jack ploune
Expt. No. 3 Page No.+

CYoSS lap jaint

Aim.

*lo make a Caass Lap ioin fram bEhe


given ulork piece:
Mateuia Requwned-
* SofE_Waad Size 300X5ox5o mm
Tools Regusied

KTackplane _Benchvice Tnysquahe


*Maiking gau ge KSteelrule k Tehon Saul
Rip Sa menchi se Malle
ProceduIe
XThe given ulork piece IsFmly olampo
n the Bench yice andany bwo adjacenk
Suface3 ale planed bo gek ight
ana es uging Ehe jack plane
Expt.No. Page No.

* UgLng the Eyy 9qucse Ehe_nqht anqles


eplaned jace8 aAe checked
* NauEhe athe tulo SuLace aie planed
Eeget Smoath Su foLce
| *The Wrkpiece 1s CLu inbo tuüo pieces
by using Ehe np Sau)

MaK the_dtmen&ian&or Fhe CtoS9


ap oint on Ehe Fuuo piecesuSing Ehe
SEeelYdeanc maAKinggauge
Remove Ehe unuounte d pr Eion8 a8 pe
Ehe dtauling and assembie bo _check
pOpefiLting
Expt. No. Page No.

Re3ult
Thus Hhe desixed Ctoss Lap Jaint is
abtained:
Expt. No. 4: Dove Tail Halving Joint Page No.

Aim-
T o ma kea dove Eai halvingJaint
Fm Ehe iven wark piece
Mateuial RequuHed
SofE WaDol C Size 300 50X50 mm
Toos Requuned
KIhe given ulorK pie.ceis irmlclamped
n he Bench Vice and any EuWa_adlacent
Suac eg CAL_planeol Lo gek nighb angles
using Ehe jaclK plone
K_Usin9 he EYy Squa1e Ehe nght
angleS plane.d oces_ahe checked:
* NaW Ehe _oEhea ELdo SuH faces aAe
planed Eo 9et_SmaaEhSuYace
The_Waxk piec e 19 Cuut into Pie ces
byuSing Ehe rip Sauu
Expt. No. Page No.

KMaSIK the dimesicns fox the_dave.Eail


jaint on Ehe Euoo pie.ces u8ing the Steclrule
and maiKLn99uge

kRemOye the un Wanted_par Eiam8 09 pei


Ehe dalauuing and asSemble Ep check iope
fitting-
Expt. No. Page No.

Result

*Thus Ehe cle sied dove Eal halving


Sint is ch bauined
Expt. No. Page No.

piPe Thaeding

Aim

Klo Ehe Ehaead8 at lhe end af the


qiVen pYC pipe bq using a pipe olue and
to maKe Ehe pluumbing

Matetial Requine-
pyc pipe *ELbauS KlapxValye
K Clamps
Tools Regüuned
KPipe vice k Die XDie_StocK X MeasutLng
Scale
pocecusie
XThe Yequiaedl dianeter pipes uwette.
picKed and cut to Hhe clesired leng th
The Gut pipe 1S Secuotely cdamped
InEhe pipe vice
Expt.No. Page No.

Dra peMe Sze die StocKand die


ig Selected: TL is in.Sented and aligne d inta
Ehe SEock

The die 1s pesitioned at one end af


Ehepipe, pre gSuHL iS_appliedl and cu the.
Sametime die is_slouil ELtne.d bu
Euning Stack handle_
KOnce Ehe Ehaeding iS Statted,oppuing|
Pre.sSuie is Stoppedand die is Conkinuedl
to EuLn_iL Ghee bhaeao proiects hiough
Ehe die_

Tn Ehe Same manne Ehe ends of_Ehe


Plpes ae_Lhheded and checked uth an
ellonud
*Then the elbau and Eop ahe ittedL
nd clamped Oh ehe ulall
Expt. No. Page No.

Re8ulb
KThus Ehe Ehaead Cut _at Ehe ends q
pMcpipe_bo _make plumbing
Expt. No.
PageNo.
PiPe une ko wash basin
Aim.

K lo pyepaHe a_ppe une Connectian to


Ehe wash bagin
Matesial Requited
XNc pipe elboulS KFlexible_pipe
KValve clampS Te jain
*Wash_bagin u-h toup
Tools Requined
kPipe_0rench KHamme XSchew dhive
KHack Saul
RocedusHe
Maik location of Ehe

You might also like