You are on page 1of 112

Presentasi Teknologi dan Solusi

PT. Maccaferri Indonesia


Rapat Kerja dan Percepatan Pelaksanaan Pekerjaan
di Lingkungan Balai Pelaksanaan Jalan Nasional Gorontalo
TA. 2022

Date Wednesday, 13 July 2022


Author Aningtyas S
TABLE OF CONTENTS

1 PROFILE – MACCAFERRI INDONESIA

2 SOLUTION – HYDRAULIC WORKS


SOIL EROSION

3 SOLUTION – MSE WALL

4 SOLUTION – EROSION CONTROL

5 SOLUTION – ROCKFALL MITIGATION

6 SOLUTION – FLOOD AND EMERGENCY WORKS


TABLE OF CONTENTS

1 PROFILE – MACCAFERRI INDONESIA


1 Profile – Maccaferri Indonesia

Presence in over 100 countries


Almost 70 subsidiaries
Over 30 factories
Nearly 3,000 employees
1 Profile – Maccaferri Indonesia

Maccaferri was founded in 1879 and invented The Famous Gabion in 1893.
1 Profile – Maccaferri Indonesia

1989: Jakarta office 1989: Factory in Tangerang


1 Profile – Maccaferri Indonesia
Environmental Product Declaration (EPD) Certification.
The goal of the study is the evaluation of the potential environmental impacts of the material.
1 Profile – Maccaferri Indonesia

Technical RecommendationFree of Charge

Production and Supply

Product AssistanceFree of Charge


Bangga Buatan Indonesia
Dengan Standardisasi Internasional
1 Profile – Maccaferri Indonesia
Rockfall Mitigation
Netting

Retaining Wall and


Rockfall Mitigation Soil Reinforcement
Barrier

Pavement
Reinforcement
Erosion Control
Sub-Drainage
System

Hydraulic Structure
Basal
Reinforcement
TABLE OF CONTENTS

1 PROFILE – MACCAFERRI INDONESIA

2 SOLUTION – HYDRAULIC WORKS


SOIL EROSION
21 Solution – Hydraulic Works
Material by Maccaferri Indonesia
Gabion – Bronjong
21 Solution – Hydraulic Works
Gabion (Bronjong) – Buatan Indonesia
TKDN 119/SJ-IND.8/TKDN/2/2021 = 65.19 %
21 Solution – Hydraulic Works
Material by Maccaferri Indonesia
Reno Mattress Plus – Bronjong Matras
21 Solution – Hydraulic Works
Reno Mattress (Bronjong Matras) – Buatan Indonesia
TKDN 2820/SJ-IND.8/TKDN/6/2021 = 66.36 %
21 Solution – Hydraulic Works
Material by Maccaferri Indonesia
Mactex – Geotekstil Non-Woven
21 Solution – Hydraulic Works
The Four Paradigms:
Flexibility
21 Solution – Hydraulic Works
The Four Paradigms:
Flexibility

Permeability
21 Solution – Hydraulic Works
The Four Paradigms:
BS EN 10223-3:2013
in accordance with
Flexibility EN ISO 9223:2012

Permeability

Durability
21 Solution – Hydraulic Works
Material by Maccaferri Indonesia
New Polymer Coating – POLIMAC

Abrasion Resistance
21 Solution – Hydraulic Works
The Four Paradigms:
Flexibility

Permeability

Durability

Environmentally Friendly
Shoreline Protection
Thesen Island Marina, South Africa 2003
21 Solution – Hydraulic Works
A. Riverbank Protection
21 Solution – Hydraulic Works
Citragrand Cibubur, Jawa Barat
Riverbank Protection and MSE Wall
21 Solution – Hydraulic Works
Citragrand Cibubur, Jawa Barat
Riverbank Protection and MSE Wall
21 Solution – Hydraulic Works
Pabrik Indocement Bogor, Jawa Barat
Riverbank Protection
21 Solution – Hydraulic Works
B. Channelized Stream
21 Solution – Hydraulic Works
Heaven Memorial Park, Jawa Barat
Channelized Stream
Before
21 Solution – Hydraulic Works
Heaven Memorial Park, Jawa Barat
Channelized Stream
After
21 Solution – Hydraulic Works
Migas JTB Bojonegoro, Jawa Timur
Channelized Stream
21 Solution – Hydraulic Works
Migas JTB Bojonegoro, Jawa Timur
Channelized Stream
21 Solution – Hydraulic Works
Ciawi Dam, Jawa Barat
Stepped Weir – Drop Structure
21 Solution – Hydraulic Works
C. Coastal Protection
Aston Anyer Coastline Protection
21 Solution – Hydraulic Works
Maccaferri Software – Macra Studio
MACRA 1 Channel Cross Section Design
TABLE OF CONTENTS

1 PROFILE – MACCAFERRI INDONESIA

2 SOLUTION – HYDRAULIC WORKS


SOIL EROSION

3 SOLUTION – MSE WALL


31 Solution – MSE Wall
Terramesh System – Bronjong Angkur
31 Solution – MSE Wall
Terramesh (Bronjong Angkur) – Buatan Indonesia
TKDN 117/SJ-IND.8/TKDN/2/2021 = 64.81 %
31 Solution – MSE Wall
Green Terramesh System – Perkuatan Hijau
31 Solution – MSE Wall
Green Terramesh (Perkuatan Hijau) – Buatan Indonesia
TKDN 2821/SJ-IND.8/TKDN/2/2021 = 43.92 %
31 Solution – MSE Wall
Terramesh and Green Terramesh
31 Solution – MSE Wall
Terramesh and Green Terramesh
31 Solution – MSE Wall
Terramesh System and Geogrid
Mechanically Stabilized Earth (MSE) Wall
Geogrid as Primary Reinforcement
Terramesh System as facing and
Secondary Reinforcement
31 Solution – MSE Wall

ParaGridTM HF 150

Geogrid Uniaxial Tipe 3 (Kuat Tarik 150 kN/m)


31 Solution – MSE Wall
ParaLinkTM 300

Geogrid Uniaxial Tipe 5 (Kuat Tarik 300 kN/m)


31 Solution – MSE Wall
Project at KUNINGAN DAM, Kuningan – Jawa Barat
31 Solution – MSE Wall
Project at KUNINGAN DAM, Kuningan – Jawa Barat
31 Solution – MSE Wall
Project at KUNINGAN DAM, Kuningan – Jawa Barat
31 Solution – MSE Wall
Project at SOETTA RAILWAY, Tangerang – Banten
31 Solution – MSE Wall
Project at SOETTA RAILWAY, Tangerang – Banten
31 Solution – MSE Wall
Project at GARDU INDUK PLN, Panyabungan – Sumatera Utara
31 Solution – MSE Wall
Project at NEW ROAD Singaraja-Mengwitani Paket 5 dan 6, Bedugul – Bali
31 Solution – MSE Wall
Project at NEW ROAD Singaraja-Mengwitani Paket 5 dan 6, Bedugul – Bali
31 Solution – MSE Wall
Project at ROADWAY Reconstruction, Batam – Kep. Riau
31 Solution – MSE Wall

Project at ROAD LANDSLIDE, Kayulangi – Sulawesi Selatan


31 Solution – MSE Wall
Maccaferri Software – Macstars
Commercial Software – Plaxis
90 Internal stability analysis (Calculation method : Rigid)
SF = 1.552 Legend
0. STRUCTURAL FILL
1. Lempung Soft
85 2. Lempung Stiff
3. Cemented
TERRAMESH FILL

80ACTIVITY

75

70

65

60

55

[m] 20 25 30 35 40 45 50 55 60

Proposal: Analisa Desain - Preliminary SG Date:


10/03/2018
MacStARS W Section: Borehole B1 Folder:
Maccaferri Stability Analysis of
Reinforced Slopes and Walls - Rel. 4.0 Site: Retaining Wall Section 6 File: Analisa Desain-B1_Static_Preliminary MAC (Geogrid)
TABLE OF CONTENTS

1 PROFILE – MACCAFERRI INDONESIA

2 SOLUTION – HYDRAULIC WORKS


SOIL EROSION

3 SOLUTION – MSE WALL

4 SOLUTION – EROSION CONTROL


41 Solution – Erosion Control
41 Solution – Erosion Control

Macmat HS (High Strength) adalah material HDPE Geomat yang dikombinasikan


dengan Jaring Kawat Anyaman Ganda (Double Twisted Wire Mesh).
41 Solution – Erosion Control
Macmat HS (Selimut Pengendali Erosi) – Buatan Indonesia
TKDN 2819/SJ-IND.8/TKDN/6/2021 = 46.70 %
41 Solution – Erosion Control

MacMat® HS Detail

Macmat HS is categorized as
Pengendali Erosi Tipe III
Matras Perkuatan
41 Solution – Erosion Control

Macmat EM is categorized as
Pengendali Erosi Tipe II
Selimut Pengendali Erosi Polimer
41 Solution – Erosion Control

Macmat HS is available with Roll Size of 2m x 30m (Default)


Customized Size is available upon request
41 Solution – Erosion Control

BENEFIT :
1. Easy Installation;
2. Adequate for Steep Slope;
3. Available for Combination
with Soil Nailing for Stabilization;
4. Free Drainage (Permeable);
5. Vegetation;
6. Economically Competitive.
41 Solution – Erosion Control

Free Trial
41 Solution – Erosion Control

Installation
41 Solution – Erosion Control

Komposisi Material Metode Taplok (Mulching):


1) Media Tanah ;
2) Pupuk Tanaman ;
3) Bibit Tumbuhan LCC (KB, CP, CM) ;
4) Pengikat (dicampur dengan air menjadi larutan) ;
5) Seluruh material 1 – 4 diaduk dan selanjutnya siap untuk
diaplikasikan ke material Erosion Control.
41 Solution – Erosion Control
Taplok / Templok Method (Mulching)
Maintenance / Watering takes ± 3 Months (depends on Weather and Soil Condition)
41 Solution – Erosion Control
Project at LEUWIKERIS DAM, Ciamis – Jawa Barat
41 Solution – Erosion Control
Project at SADAWARNA DAM, Sumedang – Jawa Barat
41 Solution – Erosion Control
Project at SADAWARNA DAM, Sumedang – Jawa Barat
41 Solution – Erosion Control
Project at SADAWARNA DAM, Sumedang – Jawa Barat
41 Solution – Erosion Control
Project at CISUMDAWU TOLL ROAD, Jawa Barat
41 Solution – Erosion Control
Project at CISUMDAWU TOLL ROAD, Jawa Barat
41 Solution – Erosion Control
Project at JALAN LABUAN BAJO - RUTENG, Manggarai Barat – NTT
41 Solution – Erosion Control
Project at PRESERVASI BATAS KOTA WAIKABUBAK, Sumba – NTT

Before
41 Solution – Erosion Control
Project at PRESERVASI BATAS KOTA WAIKABUBAK, Sumba – NTT

After
41 Solution – Erosion Control
Project at JALAN WAIKELO-BATAS SUMBA TIMUR, Sumba – NTT
41 Solution – Erosion Control
Project at WAY SEKAMPUNG DAM, Pringsewu – Lampung
41 Solution – Erosion Control
Testimoni Positif Kementrian PUPR – Bendungan Way Sekampung, Lampung
41 Solution – Erosion Control
Testimoni Positif Kementrian PUPR – Bendungan Way Sekampung, Lampung
TABLE OF CONTENTS

1 PROFILE – MACCAFERRI INDONESIA

2 SOLUTION – HYDRAULIC WORKS


SOIL EROSION

3 SOLUTION – MSE WALL

4 SOLUTION – EROSION CONTROL

5 SOLUTION – ROCKFALL MITIGATION


51 Solution – Rockfall Mitigation
Steelgrid HR30 (Jaring Kawat Kekuatan Tinggi) – Buatan Indonesia
TKDN 117/SJ-IND.8/TKDN/2/2021 = 66.78 %
51 Solution – Rockfall Mitigation
Steelgrid HR30 (Jaring Kawat Kekuatan Tinggi) – Buatan Indonesia
TKDN 117/SJ-IND.8/TKDN/2/2021 = 66.78 %
51 Solution – Rockfall Mitigation
Tinjauan Pustaka dan Literatur :
1. Kementerian PUPR – Dirjen Bina Marga
Spesifikasi Khusus Interim SKh-1.3.16
Jaring Kawat (Wire Mesh) dan Net Kabel (Cable Net)
Sebagai Pengaman Lereng Batuan
51 Solution – Rockfall Mitigation
Tensile Punch
Wire Mesh Strength Strength
(kN/m) (kN)

Steelgrid HR 30 180 ± 10 155 ± 12


51 Solution – Rockfall Mitigation
Secured Drapery System Simple Drapery System
51
JOB TITLE : 1

UDEC (Version 4.00)


Solution – Rockfall Mitigation
JOB TITLE : 1

UDEC (Version 4.00)


JOB TITLE : .

UDEC (Version 4.00)


(*10^1) (*10^1) (*10^1)

LEGEND LEGEND LEGEND

Secured Drapery System 2.400 2.400 2.400

Nailing or Rock Bolts


25-Jan-07 6:21 25-Jan-07 6:32 27-Jan-07 15:24
cycle 34000 cycle 39000 cycle 114000
velocity vectors velocity vectors block plot
maximum = 4.082E+00 maximum = 2.447E+00 cable reinforcing plotted

0
block plot
2E 1 0
block plot
1E 1
Cable Node Numbers
2.000 2.000
Stabilize The Surficial
2.000

Unstable layer of
1.600 1.600 1.600

The Rock Slope or Cliff


JOB TITLE : . (*10^1)
JOB TITLE : . JOB TITLE : . (*10^1) (*10^1)
1.200 1.200 1.200
UDEC (Version 4.00)
UDEC (Version 4.00) UDEC (Version 4.00)

LEGEND
LEGEND LEGEND 2.400
2.400 2.400
25-Jan-07 6:56 0.800 0.800 0.800
27-Jan-07 18:23 25-Jan-07 6:46 cycle 60000
cycle 20000
Giorgio Giacchetti cycle 40000
Giorgio Giacchetti Giorgio Giacchetti
max axial force =-8.507E-02
max axial force =-8.840E-02
Belluno max axial force =-8.608E-02
Belluno Belluno
0.400 0.800 1.200 0.400 1.600 0.800 2.000 1.200 0.400 1.600 0.800 2.000 1.200 1.600 2.000
(*10^1) 0 5E -1 (*10^1) (*10^1)
0 5E -1 0 5E -1 block plot
2.000
2.000 2.000
block plot block plot principal stresses
principal stresses principal stresses
minimum = 1.000E+20
minimum = 1.000E+20 minimum = 1.000E+20 maximum = -1.000E+20
maximum = -1.000E+20 maximum = -1.000E+20
0 5E 20 1.600
0 5E 20 0 5E 20 joint hydr. aper. 1.600 1.600
joint hydr. aper. joint hydr. aper. max hydr aper = 0.000E+00
max hydr aper = 0.000E+00 max hydr aper = 0.000E+00 each line thick = 0.000E+00
each line thick = 0.000E+00 each line thick = 0.000E+00 reinforc. crossing joints
reinforc. crossing joints reinforc. crossing joints

1.200
1.200 1.200
51 Solution – Rockfall Mitigation
Simple Drapery System

Horizontal Top Cable


Horizontal Top Cable

Top Anchor
±3m

Mesh Top Anchor

Mesh
51 Solution – Rockfall Mitigation
Rockfall Netting Software – Secured Drapery
51 Solution – Rockfall Mitigation
Rockfall Netting Software – Simple Drapery
51 Solution – Rockfall Mitigation
Project at ROADWAY Protection, Maros – Sulawesi Selatan
51 Solution – Rockfall Mitigation
Project at ROADWAY Aegela-Batas Ende, NTT
51 Solution – Rockfall Mitigation
Project at ROADWAY Ruas Giriwoyo-Glonggong, Jawa Tengah
51 Solution – Rockfall Mitigation
Project at ROADWAY Ruas Giriwoyo-Glonggong, Jawa Tengah
51 Solution – Rockfall Mitigation
Project at BBWS Ciliwung Cisadane, Jakarta
51 Solution – Rockfall Mitigation
Rockfall Barrier Components

DOWNSLOPE

UPSLOPE
51 Solution – Rockfall Mitigation
Rockfall Barrier Components – Full System
51 Solution – Rockfall Mitigation
Project at ROADWAY South Bandung, West Java
51 Solution – Rockfall Mitigation
Project at Agincourt Martabe Gold Mining, North Sumatera
TABLE OF CONTENTS

1 PROFILE – MACCAFERRI INDONESIA

2 SOLUTION – HYDRAULIC WORKS


SOIL EROSION

3 SOLUTION – MSE WALL

4 SOLUTION – EROSION CONTROL

5 SOLUTION – ROCKFALL MITIGATION

6 SOLUTION – FLOOD AND EMERGENCY WORKS


61 Solution – Flood and Emergency Works
Bencana Pada Tanggul (The International Levee Handbook, 2013)
61 Solution – Flood and Emergency Works
Bencana Pada Tanggul (The International Levee Handbook, 2013)
61 Solution – Flood and Emergency Works
Penanggulangan Darurat
1. Peningkatan Tinggi Tanggul
2. Pembangunan Tanggul Sementara
3. Bagian Inti pada Tanggul Permanen
61 Solution – Flood and Emergency Works
Ukuran Material:
Panjang x Lebar x Tinggi = 5m x 1m x 1m

Geotextile Internal
Lining

Spirals

Reinforced Double Twisted Wire Mesh

Connection Between Units Using


Connection Pins.
61 Solution – Flood and Emergency Works
• Buatan Indonesia – TKDN 9068/SJ-IND.8/TKDN/9/2021 = 71,31%

112
3. FlexMac® DT
Proses Instalasi
1. Persiapan Unit Material FlexMac® DT

Video-1

113
2. Pembukaan dan Perletakkan Unit FlexMac® DT
3. FlexMac® DT
Proses Instalasi
3. Koneksi antara Unit FlexMac® DT menggunakan Connection Pin

Video-2
114
3. FlexMac® DT
Proses Instalasi
4. Pengisian Tanah ke dalam FlexMac® DT menggunakan Alat Berat dan Sekop Manual

Video-3
115
61 Solution – Flood and Emergency Works
Perbandingan FlexMac® DT vs Sandbag/Soilbag
61 Solution – Flood and Emergency Works
Pengalaman Proyek
61 Solution – Flood and Emergency Works
Pengalaman Proyek
61 Solution – Flood and Emergency Works
Pengalaman Proyek
61 Solution – Flood and Emergency Works
Maccaferri Indonesia Siap Untuk Melakukan Trial
Herdriansyah Apriharto
Business Development
+62 812 9909 1118
h.apriharto@maccaferri.com

QUESTION Buha Edyson


Sales Engineer
AND +62 822-9941-1808
DISCUSSION b.edyson@macceferri.com

Aningtyas Safitri
Technical Engineer
+62 838 4397 0481
a.safitri@maccaferri.com