You are on page 1of 44

Acara:

Presentasi Teknologi Perkuatan Tanah


PT. Maccaferri Indonesia

Tempat dan Tanggal:


Tempat
Tanggal

MACCAFERRI Teknologi Perkuatan Tanah


INDONESIA
Solusi Green Infrastructure
2022 Serkandi – Technical Manager Contact : +62 81290294979 serkandi@maccaferri.com
Sharing Knowledge. Adding Value. Together.
TABLE OF CONTENTS

1 PROFILE – MACCAFERRI INDONESIA

2 SOLUTION – EROSION CONTROL


SOIL EROSION
TABLE OF CONTENTS

1 PROFILE – MACCAFERRI INDONESIA


1 Profile – Maccaferri Indonesia

Presence in over 100 countries


Almost 70 subsidiaries
Over 30 factories
Nearly 3,000 employees
1 Profile – Maccaferri Indonesia

Maccaferri was founded in 1879 and invented The Famous Gabion in 1893.
1 Profile – Maccaferri Indonesia

1989: Jakarta office 1989: Factory in Tangerang


1 Profile – Maccaferri Indonesia
Environmental Product Declaration (EPD) Certification.
The goal of the study is the evaluation of the potential environmental impacts of the material.
1 Profile – Maccaferri Indonesia

Technical Recommendation

Production and Supply

Product Assistance
Bangga Buatan Indonesia
Dengan Standarisasi Internasional
1 Profile – Maccaferri Indonesia
Rockfall Mitigation
Netting

Retaining Wall and


Soil Reinforcement

Rockfall Mitigation
Barrier

Rockfall Mitigation
Embankment Pavement
Gabion Wall Reinforcement
Erosion Control
Sub-Drainage
System

Hydraulic Structure
Basal
Reinforcement
TABLE OF CONTENTS

1 PROFILE – MACCAFERRI INDONESIA

2 SOLUTION – EROSION CONTROL


SOIL EROSION
21 Solution – Erosion Control

Macmat HS (High Strength)


is a combination of HDPE Geomat and Double Twisted Mesh Panel
with additional of an array of mulching contained seeds to bring
vegetation onto the system.
21 Solution – Erosion Control
Macmat HS (Selimut Pengendali Erosi) – Buatan Indonesia
TKDN 2819/SJ-IND.8/TKDN/6/2021 = 46.70 %
21 Solution – Erosion Control
Tinjauan Pustaka dan Literatur :
1. SNI 8460:2017 Persyaratan Perancangan Geoteknik
21 Solution – Erosion Control
Tinjauan Pustaka dan Literatur :
1. SNI 8460:2017 Persyaratan Perancangan Geoteknik
2. Bina Marga – Spesifikasi Khusus Interim
SKh-1.3.17 Selimut dan Matras Pengendali Erosi Lereng
21 Solution – Erosion Control

Macmat HS is categorized as
Pengendali Erosi Tipe III
Matras Perkuatan
21 Solution – Erosion Control

Macmat EM is categorized as
Pengendali Erosi Tipe II
Selimut Pengendali Erosi Polimer
21 Solution – Erosion Control

Macmat HS is available with Roll Size of 2m x 30m (Default)


Customized Size is available upon request
21 Solution – Erosion Control

BENEFIT :
1. Easy Installation;
2. Adequate for Steep Slope;
3. Available for Combination
with Soil Nailing for Stabilization;
4. Free Drainage (Permeable);
5. Vegetation;
6. Economically Competitive.
21 Solution – Erosion Control

Free Trial
21 Solution – Erosion Control

Free Trial
21 Solution – Erosion Control

Installation
21 Solution – Erosion Control

Komposisi Material Metode Taplok (Mulching):


1) Media Tanah ;
2) Pupuk Tanaman ;
3) Bibit Tumbuhan LCC (KB, CP, CM) ;
4) Pengikat (dicampur dengan air menjadi larutan) ;
5) Seluruh material 1 – 4 diaduk dan selanjutnya siap untuk
diaplikasikan ke material Erosion Control.
21 Solution – Erosion Control
Taplok / Templok Method (Mulching)
Maintenance / Watering takes ± 3 Months (depends on Weather and Soil Condition)
21 Solution – Erosion Control
Project at LEUWIKERIS DAM, Ciamis – Jawa Barat
21 Solution – Erosion Control
Project at SADAWARNA DAM, Sumedang – Jawa Barat
21 Solution – Erosion Control
Project at SADAWARNA DAM, Sumedang – Jawa Barat
21 Solution – Erosion Control
Project at SADAWARNA DAM, Sumedang – Jawa Barat
21 Solution – Erosion Control
Project at CISUMDAWU TOLL ROAD, Jawa Barat
21 Solution – Erosion Control
Project at CISUMDAWU TOLL ROAD, Jawa Barat
21 Solution – Erosion Control
Project at CISUMDAWU PHASE II TOLL ROAD, Jawa Barat
21 Solution – Erosion Control
Project at CISUMDAWU PHASE II TOLL ROAD, Jawa Barat
21 Solution – Erosion Control
Project at JALAN LABUAN BAJO - RUTENG, Manggarai Barat – NTT
21 Solution – Erosion Control
Project at PRESERVASI BATAS KOTA WAIKABUBAK, Sumba – NTT
21 Solution – Erosion Control
Project at PRESERVASI BATAS KOTA WAIKABUBAK, Sumba – NTT
21 Solution – Erosion Control
Project at JALAN WAIKELO-BATAS SUMBA TIMUR, Sumba – NTT
21 Solution – Erosion Control
Project at BYPASS BIL-MANDALIKA, NTB
21 Solution – Erosion Control
Project at PULAU BALANG BRIDGE, Kalimantan Timur
21 Solution – Erosion Control
Project at PIDEKSO DAM, Wonogiri – Jawa Tengah
21 Solution – Erosion Control
Project at BERINGIN SILA DAM, Sumbawa – NTB
21 Solution – Erosion Control
Project at SINAMAR DAM, Tanah Datar – Sumatera Barat
21 Solution – Erosion Control
Project at KARALLOE DAM, Gowa – Sulawesi Selatan
21 Solution – Erosion Control
Project at WAY SEKAMPUNG DAM, Pringsewu – Lampung
21 Solution – Erosion Control
Testimoni Positif Kementrian PUPR – Bendungan Way Sekampung, Lampung