Professional Documents
Culture Documents
Steel Porta Cabin Consist of With One Room Only
Steel Porta Cabin Consist of With One Room Only
NOTIFICATIONS
HomeLand and Buildings and Structures and ThoroughfaresPortable buildings and structures
Portable Commercial and industrial buildings and structuresSteel Porta Cabin (Q3 Category)
Ask GeMmy
Product Compare Product History 4
Rs. 261,000.00 18% OFF
Trends
Product Details
Seller Details
Specifications
Wiring Concealed
wiring
VIEW LESS
GENERIC
Ask GeMmy
Product Compare Product History 4
Approval of Advance After award of Special Condition Scope of supply
sample contract - Seller shall includes Supply and
have to get proto type Erection of Cabin at
Advance sample consignee site hence
approved from Buyer Offer Price to include
before manufacturing all these cost
/ starting Bulk components. Further
supplies - Buyer shall Offer Prices are on
approve / provide list Free Delivery at
of modifications Consignee site basis
required within 10 hence Transportation
days of offer of / Freight charges are
advance sample - If to be included in
there is delay in Offer price. Building
approval of advance of Foundation at site
sample from Buyer shall be the
side - the delivery responsibility of the
period shall be Consignee and the
regularized for the Seller shall Erect the
period of delay in structure on the
sample approval. foundation
constructed upto
plinth level by the
Foundation for Cabin Building of
Consignee. In case
Foundation at site
shall be the advance sample is
required - after award
responsibility of the
of contract - Seller
Consignee and the
Seller shall Install / shall have to get
Advance sample
Erect and
Commission the approved from Buyer
before manufacturing
structure on the
/ starting Bulk
foundation
constructed upto supplies. Buyer shall
approve / provide list
plinth level by the
Consignee. of modifications
required within 10
days of offer of
advance sample. If
there is delay in
approval of advance
sample from Buyer
side - the delivery
period shall be
regularized for the
period of delay in
sample approval.
Ask GeMmy
Product Compare Product History 4
Time period for Within 30 days of the Provision for Power The seller to be liable
completion of Erection date of receipt of Connection to get the Electric
work at site by seller consignee's connection through 3
confirmation core insulated
regarding completion underground cable
of ground and covered with MS pipe
foundation work from the power
supply point provided
Suitability / structural In wind condition of by the Buyer.,The
seller to be liable to
stability / completness 55m/s - in Seismic
get the Electric
of structures, the zone V and ambient
structure is intended temperature range (-) connection through 3
core insulated
for use in 40 degree C to (+) 50
degree C - 1 M snow underground cable
covered with PVC pipe
load standing on the
from the power
roof - Roof slope 1 : 2
Cabin should be supply point provided
by the
structurally stable
and suitable to meet Buyer.,Provision for
Power Connection not
severity of these
required.,The seller to
climatic condition.
be liable for Electric
Supply to Porta Cabin
Shape of Cabin Rectangular at one point only
(suitable for 415 V 50
Type of slope(roof) Two way slope. HZ for distribution of
supply for various
appliances)
Insulation of Wall / Insulation core of
Roof / door panels panel to be formed in
one piece and Wiring Concealed wiring
provides desired
structural and Provision for Cable , Seller to make
physical properties. Switches and Junction appropriate
box connection provisions for cable
Ventilation 1 no. ventilator - laying - installing
made out of meter / junction box
Aluminium adjustable with switches - other
Louvers type channel related electrical
and to be fixed in wall accessories as may be
panel with suitable require for the power
fastners. supply to the Cabin.
Ask GeMmy
Product Compare Product History 4
Completeness of the Any fittings or items End panel material 1.25 mm thick
work which may not be corrugated HR sheet
specially mentioned
in the specifications Insulation material for With 50 mm thick
but which are
sides and End walls glass wool
necessary for
commissioning of
Cabin are to be Insulation material for With 75 mm thick
provided by the Seller Roof glass wool
without any extra
charge. Inside panel material Consists of 8 mm
for sides, end walls & thick pre-laminated
Electricity charges Charges applicable roof board.
for obtaining Power
connection and
recurring monthly FRAME MATERIAL
power consumption
charges levied by Roof frame Made of MS having
sevice provider to be stiffner Top 40 mm x
borne by Buyer / user 20 mm x 3.2 mm thick
depatment.
MISCELENIOUS
Inside Width ± 15 mm 3050 mm
Number of Door hinges 2 nos.
Total Height (mm) ± 2440 mm Hint : For each Door
15mm
Number of Door 2 nos. (1 no. each
Size of Window ± 10 760 mm x 915 mm handles Hint : For each inside and outside)
mm Door
Sitemap Analytics
BRAND GeM
Gallery OM’s/Circulars
Forums Miscellaneous
TESTIMONIALS MOU'S
LMS FAQs
Facilitators Contact Us
© 2021 GeM All rights reserved Site operated and maintained by Managed Service Provider
Ask GeMmy
Product Compare Product History 4
Ask GeMmy
Product Compare Product History 4